THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT V 15565 COUNTIES AND CODES: HILLSBOROUGH 011 MERRIMACK 013 ROCKINGHAM 015 DATE BIDS OPEN: MARCH 5, 2009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 21, 2009 A CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 1,576,481.25 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,647,381.25 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,846,900.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 4,375. 78.00 341,250.00 81.00 354,375.00 89.00 389,375.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 125.00 6,250.00 130.00 6,500.00 150.00 7,500.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 11,550. 82.00 947,100.00 86.00 993,300.00 87.50 1,010,625.00 417. COLD PLANING BITUMINOUS SURFACES SY 43,325. 2.25 97,481.25 3.25 140,806.25 4.00 173,300.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 6. 600.00 3,600.00 600.00 3,600.00 750.00 4,500.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 3,500.00 3,500.00 3,500.00 3,500.00 2,000.00 2,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 618.7 FLAGGERS HR 3,500. 23.00 80,500.00 10.00 35,000.00 25.00 87,500.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 300.00 1,800.00 300.00 1,800.00 350.00 2,100.00 692. MOBILIZATION U 1. 25,000.00 25,000.00 38,500.00 38,500.00 100,000.00 100,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 $1,576,481.25 $1,647,381.25 $1,846,900.00