THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT II 15562 ANDOVER 13349 ANDOVER 15508 COUNTIES AND CODES: GRAFTON 009 MERRIMACK 013 SULLIVAN 007 DATE BIDS OPEN: FEBRUARY 26, 2009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 11, 2009 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,725,225.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 214. FINE GRADING U 1. 50,000.00 50,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 250. 30.00 7,500.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12" DEEP (F) SY 31,600. 1.50 47,400.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 3,600. 17.50 63,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 9,450. 79.00 746,550.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 150.00 7,500.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 575. 89.00 51,175.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 16,200. 87.50 1,417,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 31,250. 4.00 125,000.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 2,000.00 2,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 618.7 FLAGGERS HR 1,775. 24.00 42,600.00 692. MOBILIZATION U 1. 100,000.00 100,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 $2,725,225.00