THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-ATKINSON X-A000(754), 15504 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 16, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 111 IN SALEM DERRY AND ATKINSON COMPLETION DATE: SEPTEMBER 18, 2009 A CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 1,296,204.75 B BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,418,100.13 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,622,486.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.31 FILL ABANDONED PIPE CY 15. 200.00 3,000.00 225.00 3,375.00 350.00 5,250.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 1,700. 15.00 25,500.00 4.75 8,075.00 20.00 34,000.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 10. 300.00 3,000.00 900.00 9,000.00 550.00 5,500.00 202.6 CURB REMOVAL FOR STORAGE LF 3,700. 2.00 7,400.00 2.75 10,175.00 4.50 16,650.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,762.5 2.50 4,406.25 2.11 3,718.88 3.90 6,873.75 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 1,000.00 3,000.00 2,200.00 6,600.00 2,500.00 7,500.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 800.00 1,600.00 1,900.00 3,800.00 2,000.00 4,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 280. 16.00 4,480.00 38.00 10,640.00 45.00 12,600.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,050. 22.00 23,100.00 22.00 23,100.00 30.00 31,500.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 350. 64.00 22,400.00 100.00 35,000.00 92.00 32,200.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 2,000. 66.00 132,000.00 85.00 170,000.00 83.00 166,000.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA - TIER 1) TON 5,000. 68.00 340,000.00 85.00 425,000.00 83.00 415,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 110.00 5,500.00 140.00 7,000.00 135.00 6,750.00 403.6 PAVEMENT JOINT ADHESIVE LF 39,500. .30 11,850.00 .30 11,850.00 .35 13,825.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 600. 70.00 42,000.00 90.00 54,000.00 88.00 52,800.00 15504 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 8,800. 1.90 16,720.00 2.60 22,880.00 2.00 17,600.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 26,200. 1.90 49,780.00 2.60 68,120.00 1.85 48,470.00 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 140.00 3,500.00 175.00 4,375.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 25. 300.00 7,500.00 300.00 7,500.00 400.00 10,000.00 604.52 RECONSTRUCTING/ADJUSTING DRAINAGE MANHOLES LF 5. 300.00 1,500.00 300.00 1,500.00 400.00 2,000.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 750. 7.00 5,250.00 8.22 6,165.00 10.50 7,875.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 60. 13.00 780.00 68.00 4,080.00 19.50 1,170.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 1,575. 17.80 28,035.00 17.11 26,948.25 26.50 41,737.50 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 750. 17.00 12,750.00 17.11 12,832.50 25.00 18,750.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 3. 1,950.00 5,850.00 2,328.00 6,984.00 2,900.00 8,700.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 1,650.00 3,300.00 2,128.00 4,256.00 2,500.00 5,000.00 606.91452 RESETTING GUARDRAIL TERMINAL UNIT TYPE ELT U 7. 500.00 3,500.00 522.00 3,654.00 750.00 5,250.00 606.915 RESETTING GUARDRAIL BLOCK AND RAIL ONLY LF 5,300. 3.50 18,550.00 4.43 23,479.00 5.25 27,825.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 110. 5.00 550.00 15.00 1,650.00 8.00 880.00 614.511 CONCRETE PULL BOX 14" EA 16. 280.00 4,480.00 329.00 5,264.00 500.00 8,000.00 614.7418 4" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 500. 20.00 10,000.00 18.40 9,200.00 27.50 13,750.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 8. 650.00 5,200.00 620.00 4,960.00 1,000.00 8,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 618.7 FLAGGERS HR 1,600. 24.00 38,400.00 26.00 41,600.00 26.00 41,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 65,000.00 65,000.00 95,000.00 95,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 4,000.00 8,000.00 8,000.00 16,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 2,000.00 4,000.00 2,000.00 4,000.00 2,000.00 4,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 90. 5.00 450.00 5.00 450.00 7.50 675.00 621.31 SINGLE DELINEATOR WITH POST EA 140. 28.00 3,920.00 30.00 4,200.00 42.00 5,880.00 628.2 SAWED BITUMINOUS PAVEMENT LF 4,500. 2.00 9,000.00 1.00 4,500.00 1.50 6,750.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 39,800. .12 4,776.00 .12 4,776.00 .15 5,970.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 20,700. .50 10,350.00 .50 10,350.00 .55 11,385.00 15504 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 410. 3.00 1,230.00 3.00 1,230.00 3.30 1,353.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 255. 6.50 1,657.50 6.50 1,657.50 5.85 1,491.75 641. LOAM CY 270. 22.00 5,940.00 24.00 6,480.00 50.00 13,500.00 645.531 SILT FENCE LF 1,250. 3.00 3,750.00 3.50 4,375.00 5.00 6,250.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5. 1,800.00 9,000.00 1,575.00 7,875.00 2,500.00 12,500.00 647.1 HUMUS CY 1,850. 16.00 29,600.00 18.00 33,300.00 46.00 85,100.00 692. MOBILIZATION U 1. 108,400.00 108,400.00 65,000.00 65,000.00 110,000.00 110,000.00 698.14 FIELD OFFICE TYPE D MON 6. 2,000.00 12,000.00 1,500.00 9,000.00 2,200.00 13,200.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 $1,296,204.75 $1,418,100.13 $1,622,486.00