THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH-DOVER-FARMINGTON 15378 COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: MARCH 3, 2009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECTION OF WORK COMPLETION DATE: AUGUST 28, 2009 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,759,733.75 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,094,029.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,550. 17.50 27,125.00 28.00 43,400.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 13,900. 78.50 1,091,150.00 91.00 1,264,900.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 125.00 6,250.00 150.00 7,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 138,700. .25 34,675.00 .30 41,610.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,000. 76.50 76,500.00 91.00 91,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 44,900. 2.40 107,760.00 3.85 172,865.00 417.51 COLD PLANING EXISTING RUMBLE STRIPS (F) LF 19,025. 1.50 28,537.50 .85 16,171.25 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 38. 135.00 5,130.00 125.00 4,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 8. 275.00 2,200.00 600.00 4,800.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 1. 275.00 275.00 600.00 600.00 609.5 RESET GRANITE CURB LF 200. 15.00 3,000.00 30.00 6,000.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 750.00 2,250.00 1,000.00 3,000.00 616.95 INSTALL TRAFFIC STUDY EQUIPEMENT U 1. 13,000.00 13,000.00 18,000.00 18,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 65,000.00 65,000.00 80,000.00 80,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 10,000.00 20,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 10. 300.00 3,000.00 400.00 4,000.00 15378 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 10,650. .10 1,065.00 .13 1,384.50 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 73,500. .14 10,290.00 .18 13,230.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 155. .95 147.25 1.00 155.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 600. 1.18 708.00 1.50 900.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 500. 1.55 775.00 1.80 900.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 120. 2.80 336.00 2.60 312.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 720. 5.50 3,960.00 4.10 2,952.00 692. MOBILIZATION U 1. 70,000.00 70,000.00 95,000.00 95,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 55,600.00 55,600.00 55,600.00 55,600.00 $1,759,733.75 $2,094,029.75