THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPPING-EXETER X-A000(620), 14923 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: MARCH 10, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 101 EAST SIDE OF THE LAMPREY RIVER BRIDGE IN EPPING AND EXIT 9 IN EXETER COMPLETION DATE: AUGUST 28, 2009 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 7,818,845.12 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 8,765,791.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.8822 INVASIVE SPECIES CONTROL TYPE II SY 1,250. 2.25 2,812.50 1.00 1,250.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,600. 2.25 3,600.00 1.00 1,600.00 203.1 COMMON EXCAVATION CY 565. 16.00 9,040.00 38.00 21,470.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 44.00 1,100.00 45.00 1,125.00 209.1 GRANULAR BACKFILL CY 200. 26.00 5,200.00 42.00 8,400.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 13,855. 12.50 173,187.50 17.00 235,535.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 79,750. 68.00 5,423,000.00 76.00 6,061,000.00 403.11092 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 2) TON 4,020. 65.00 261,300.00 76.00 305,520.00 403.1199 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (NIGHT) TON 515. 68.00 35,020.00 86.00 44,290.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 250. 130.00 32,500.00 130.00 32,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 491,300. .23 112,999.00 .24 117,912.00 417. COLD PLANING BITUMINOUS SURFACES SY 109,500. 1.90 208,050.00 2.00 219,000.00 417.51 COLD PLANE EXISTING RUMBLE STRIPS (F) LF 76,350. .32 24,432.00 .40 30,540.00 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT (20" WIDE) (F) LF 1,202. 68.00 81,736.00 68.00 81,736.00 565.801 RESETTING BRIDGE APPROACH RAIL LF 608. 21.00 12,768.00 24.00 14,592.00 14923 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.0007 POLYETHYLENE LINER EA 256. 135.00 34,560.00 116.00 29,696.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 256. 250.00 64,000.00 250.00 64,000.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 3. 250.00 750.00 250.00 750.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 300. 10.00 3,000.00 8.00 2,400.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 40. 70.00 2,800.00 65.00 2,600.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 40. 12.00 480.00 12.00 480.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 31. 2,110.00 65,410.00 1,800.00 55,800.00 606.9146 RESETTING GUARDRAIL TERMINAL UNIT TYPE ELT U 1. 800.00 800.00 850.00 850.00 606.915 RESETTING GUARDRAIL BLOCK AND RAIL ONLY LF 15,650. 4.25 66,512.50 3.75 58,687.50 608.28 8" CONCRETE SIDEWALK (F) SY 2,725. 49.00 133,525.00 42.00 114,450.00 609.5 RESET GRANITE CURB LF 8,650. 7.75 67,037.50 8.00 69,200.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 5,300. 5.80 30,740.00 5.00 26,500.00 614.511 CONCRETE PULL BOX 14" EA 1. 325.00 325.00 750.00 750.00 615.02 TRAFFIC SIGN TYPE B (F) SF 33. 68.00 2,244.00 100.00 3,300.00 615.03 TRAFFIC SIGN TYPE C (F) SF 24. 46.00 1,104.00 57.50 1,380.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 136. 22.00 2,992.00 40.00 5,440.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 361. 18.00 6,498.00 20.00 7,220.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 10. 15.00 150.00 10.00 100.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 5. 605.00 3,025.00 550.00 2,750.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 12,800.00 12,800.00 16,500.00 16,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 120. 20.00 2,400.00 30.00 3,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 100,000.00 100,000.00 160,000.00 160,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 6,000.00 12,000.00 5,000.00 10,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 32. 300.00 9,600.00 250.00 8,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 4. 300.00 1,200.00 3,000.00 12,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 8,250.00 16,500.00 10,000.00 20,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 150. 4.50 675.00 4.75 712.50 621.31 SINGLE DELINEATOR WITH POST EA 600. 27.00 16,200.00 26.00 15,600.00 14923 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.32 DOUBLE DELINEATOR WITH POST EA 90. 35.00 3,150.00 35.00 3,150.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,450. 1.50 3,675.00 1.00 2,450.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 668,000. .11 73,480.00 .11 73,480.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 47,500. .18 8,550.00 .18 8,550.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 350. .75 262.50 .75 262.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 375. 3.00 1,125.00 3.00 1,125.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 485. 5.50 2,667.50 5.50 2,667.50 645.3 EROSION STONE TON 50. 26.00 1,300.00 50.00 2,500.00 645.531 SILT FENCE LF 1,000. 2.00 2,000.00 3.75 3,750.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 40. 75.00 3,000.00 70.00 2,800.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .3 1,850.00 555.00 3,050.00 915.00 647.1 HUMUS CY 140. 40.00 5,600.00 55.00 7,700.00 692. MOBILIZATION U 1. 50,000.00 50,000.00 160,000.00 160,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 698.13 FIELD OFFICE TYPE C MON 6. 1,367.02 8,202.12 2,500.00 15,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 8,000.00 8,000.00 8,000.00 8,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 301,105.00 301,105.00 301,105.00 301,105.00 $7,818,845.12 $8,765,791.00