THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WOODSTOCK X-A000(508), 14773 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: MARCH 12, 2009 SCOPE OF WORK: ROCK STABILIZATION LOCATION: INTERSTATE 93 LOCATED AT THE BASE OF BARRON MOUNTAIN COMPLETION DATE: OCTOBER 16, 2009 A HI-TECH ROCKFALL CONSTRUCTION, INC. PO BOX 674, FOREST GROVE, OR 97116-0674 $ 1,082,318.00 B MORRILL CONSTRUCTION INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 1,126,469.00 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 1,204,159.00 D R. D. EDMUNDS & SONS, INC. 221 FRANKLIN STREET, FRANKLIN, NH 03235 $ 1,211,760.00 E J. A. MCDONALD INC. 585 GILMAN ROAD, LYNDON CENTER, VT 05850 $ 1,263,015.00 F CONSTRUCTION DRILLING, INC. 550 ASHLAND STREET, NORTH ADAMS, MA 01247 $ 1,351,100.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.2 ROCK EXCAVATION CY 200. 50.00 10,000.00 30.00 6,000.00 50.00 10,000.00 203.91 ROCK SCALING-HAND METHOD HR 160. 1,100.00 176,000.00 244.00 39,040.00 556.00 88,960.00 225.2 PRESTRESSED ROCK BOLTS LF 2,380. 145.00 345,100.00 122.00 290,360.00 140.00 333,200.00 225.25 PROOF & PERFORMANCE TESTING OF PRESTRESSED ROCK BOLTS U 228. 500.00 114,000.00 1,548.00 352,944.00 1,780.00 405,840.00 225.4 PASSIVE TENDON LF 60. 160.00 9,600.00 122.00 7,320.00 140.00 8,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 225.00 15,750.00 160.00 11,200.00 225.00 15,750.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,950. 29.00 85,550.00 20.00 59,000.00 22.00 64,900.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 45,000.00 45,000.00 36,000.00 36,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 14. 632.00 8,848.00 350.00 4,900.00 632.00 8,848.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 70. 35.00 2,450.00 10.00 700.00 35.00 2,450.00 621.31 SINGLE DELINEATOR WITH POST EA 40. 35.00 1,400.00 55.00 2,200.00 35.00 1,400.00 622.1 STEEL WITNESS MARKERS EA 25. 35.00 875.00 60.00 1,500.00 35.00 875.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 8,200. .25 2,050.00 .15 1,230.00 .15 1,230.00 14773 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.1106 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 6" LINE LF 2,100. 2.00 4,200.00 3.00 6,300.00 1.40 2,940.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 1,500. .50 750.00 3.20 4,800.00 .50 750.00 645.3 EROSION STONE TON 50. 40.00 2,000.00 35.00 1,750.00 40.00 2,000.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 1,850. 3.50 6,475.00 4.50 8,325.00 3.50 6,475.00 645.531 SILT FENCE LF 1,000. 1.00 1,000.00 3.00 3,000.00 1.00 1,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 105. 60.00 6,300.00 80.00 8,400.00 60.00 6,300.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.6 1,700.00 2,720.00 4,000.00 6,400.00 1,700.00 2,720.00 647.1 HUMUS CY 750. 18.00 13,500.00 40.00 30,000.00 18.00 13,500.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 14,000.00 14,000.00 8,500.00 8,500.00 14,000.00 14,000.00 692. MOBILIZATION U 1. 107,150.00 107,150.00 125,000.00 125,000.00 74,021.00 74,021.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 $1,082,318.00 $1,126,469.00 $1,204,159.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WOODSTOCK X-A000(508), 14773 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: MARCH 12, 2009 SCOPE OF WORK: ROCK STABILIZATION LOCATION: INTERSTATE 93 LOCATED AT THE BASE OF BARRON MOUNTAIN COMPLETION DATE: OCTOBER 16, 2009 A HI-TECH ROCKFALL CONSTRUCTION, INC. PO BOX 674, FOREST GROVE, OR 97116-0674 $ 1,082,318.00 B MORRILL CONSTRUCTION INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 1,126,469.00 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 1,204,159.00 D R. D. EDMUNDS & SONS, INC. 221 FRANKLIN STREET, FRANKLIN, NH 03235 $ 1,211,760.00 E J. A. MCDONALD INC. 585 GILMAN ROAD, LYNDON CENTER, VT 05850 $ 1,263,015.00 F CONSTRUCTION DRILLING, INC. 550 ASHLAND STREET, NORTH ADAMS, MA 01247 $ 1,351,100.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.2 ROCK EXCAVATION CY 200. 50.00 10,000.00 265.00 53,000.00 400.00 80,000.00 203.91 ROCK SCALING-HAND METHOD HR 160. 300.00 48,000.00 385.00 61,600.00 280.00 44,800.00 225.2 PRESTRESSED ROCK BOLTS LF 2,380. 130.00 309,400.00 135.00 321,300.00 166.00 395,080.00 225.25 PROOF & PERFORMANCE TESTING OF PRESTRESSED ROCK BOLTS U 228. 1,800.00 410,400.00 1,700.00 387,600.00 1,000.00 228,000.00 225.4 PASSIVE TENDON LF 60. 300.00 18,000.00 130.00 7,800.00 350.00 21,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 150.00 10,500.00 245.00 17,150.00 400.00 28,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,950. 30.00 88,500.00 17.00 50,150.00 46.00 135,700.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 35,000.00 35,000.00 77,000.00 77,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 14. 400.00 5,600.00 300.00 4,200.00 500.00 7,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 70. 10.00 700.00 8.00 560.00 8.00 560.00 621.31 SINGLE DELINEATOR WITH POST EA 40. 60.00 2,400.00 33.00 1,320.00 75.00 3,000.00 622.1 STEEL WITNESS MARKERS EA 25. 50.00 1,250.00 28.00 700.00 100.00 2,500.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 8,200. .25 2,050.00 .15 1,230.00 .30 2,460.00 14773 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.1106 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 6" LINE LF 2,100. 1.60 3,360.00 1.40 2,940.00 2.00 4,200.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 1,500. 1.00 1,500.00 .50 750.00 1.00 1,500.00 645.3 EROSION STONE TON 50. 50.00 2,500.00 50.00 2,500.00 48.00 2,400.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 1,850. 3.00 5,550.00 4.00 7,400.00 6.00 11,100.00 645.531 SILT FENCE LF 1,000. 3.00 3,000.00 3.00 3,000.00 4.50 4,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 2,500.00 2,500.00 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 105. 70.00 7,350.00 55.00 5,775.00 100.00 10,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.6 2,000.00 3,200.00 1,900.00 3,040.00 3,000.00 4,800.00 647.1 HUMUS CY 750. 20.00 15,000.00 30.00 22,500.00 40.00 30,000.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 10,000.00 10,000.00 60,000.00 60,000.00 16,000.00 16,000.00 692. MOBILIZATION U 1. 75,000.00 75,000.00 110,000.00 110,000.00 135,000.00 135,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 $1,211,760.00 $1,263,015.00 $1,351,100.00