THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-MANCHESTER A000(127), 13933G COUNTIES AND CODES: ROCKINGHAM 015 HILLSBOROUGH 011 DATE BIDS OPEN: APRIL 15, 2009 SCOPE OF WORK: ROADWAY AND BRIDGE RECONSTRUCTION LOCATION: I-93, NH ROUTES 11 AND 111A COMPLETION DATE: NOVEMBER 1, 2011 A GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE RD., WINDHAM, NH 03087 $25,969,102.80 B SEVERINO TRUCKING CO, INC. 512 RAYMOND ROAD, CANDIA, NH 03034 $27,575,534.00 C SARGENT CORPORATION 378 BENNOCH RD., STILLWATER, ME 04489 $27,946,970.30 D PARK CONSTRUCTION CORP. PO BOX 600, FITZWILLIAM, NH 03447 $29,226,154.22 E THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $31,355,880.20 F ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $31,718,300.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 55.5 5,350.00 296,925.00 5,000.00 277,500.00 3,900.00 216,450.00 201.6 CLEARING FOR FENCE LINES (F) A .4 4,000.00 1,600.00 6,000.00 2,400.00 6,000.00 2,400.00 201.8811 INVASIVE SPECIES CONTROL TYPE 1 A 3.3 6,200.00 20,460.00 5,000.00 16,500.00 2,200.00 7,260.00 201.8821 INVASIVE SPECIES CONTROL TYPE 2 A 3.25 6,200.00 20,150.00 5,000.00 16,250.00 2,200.00 7,150.00 202.31 FILL ABANDONED PIPE CY 90. 140.00 12,600.00 225.00 20,250.00 200.00 18,000.00 202.32 FILL ABANDONED STRUCTURE CY 20. 110.00 2,200.00 250.00 5,000.00 190.00 3,800.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 3,000. 11.00 33,000.00 10.00 30,000.00 7.00 21,000.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 11. 200.00 2,200.00 450.00 4,950.00 250.00 2,750.00 202.7 REMOVAL OF GUARDRAIL (F) LF 17,720. 1.15 20,378.00 2.00 35,440.00 2.00 35,440.00 203.1 COMMON EXCAVATION CY 355,000. 4.35 1,544,250.00 5.00 1,775,000.00 1.55 550,250.00 203.2 ROCK EXCAVATION CY 417,000. 9.35 3,898,950.00 7.15 2,981,550.00 8.00 3,336,000.00 203.4 MUCK EXCAVATION CY 37,820. 5.50 208,010.00 9.00 340,380.00 7.25 274,195.00 203.52 IMPERVIOUS MATERIAL (F) CY 15,995. 9.60 153,552.00 12.00 191,940.00 22.00 351,890.00 203.5525 PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM U 3. 1,000.00 3,000.00 1,000.00 3,000.00 2,250.00 6,750.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 13. 1,200.00 15,600.00 1,000.00 13,000.00 2,300.00 29,900.00 13933G PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) CY 532,000. 1.85 984,200.00 2.00 1,064,000.00 3.75 1,995,000.00 203.62 EMBANKMENT-IN-PLACE REPLACEMENT MATERIAL CY 9,600. 8.60 82,560.00 3.00 28,800.00 5.00 48,000.00 203.81 PRESPLITTING HOLES LF 40,700. 4.90 199,430.00 5.00 203,500.00 5.10 207,570.00 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 6,000. 3.15 18,900.00 2.75 16,500.00 3.00 18,000.00 203.91 ROCK SCALING- HAND METHOD HR 300. 270.00 81,000.00 300.00 90,000.00 248.00 74,400.00 203.92 ROCK SCALING- MACHINE METHOD HR 450. 335.00 150,750.00 200.00 90,000.00 270.00 121,500.00 203.93 HYDROGEOLOGIST U 1. 46,200.00 46,200.00 28,000.00 28,000.00 30,000.00 30,000.00 203.94 BASELINE WATER SAMPLING EA 208. 350.00 72,800.00 300.00 62,400.00 330.00 68,640.00 203.95 EXTENDED WATER SAMPLING EA 24. 815.00 19,560.00 1,000.00 24,000.00 1,100.00 26,400.00 206.1 COMMON STRUCTURE EXCAVATION CY 5,200. 15.35 79,820.00 8.00 41,600.00 6.50 33,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 60. 20.00 1,200.00 65.00 3,900.00 24.00 1,440.00 206.2 ROCK STRUCTURE EXCAVATION CY 8,500. 30.00 255,000.00 15.00 127,500.00 14.50 123,250.00 209.1 GRANULAR BACKFILL CY 5,500. 15.50 85,250.00 20.00 110,000.00 16.25 89,375.00 210.63 GROUNDWATER OBSERVATION WELL (SOIL DRILLING) LF 125. 35.00 4,375.00 40.00 5,000.00 36.00 4,500.00 210.64 GROUNDWATER OBSERVATION WELL (ROCK DRILLING) LF 375. 22.00 8,250.00 40.00 15,000.00 11.00 4,125.00 210.7 PROTECTIVE CASING WITH CAP AND LOCK EA 5. 1,155.00 5,775.00 600.00 3,000.00 1,250.00 6,250.00 214. FINE GRADING U 1. 60,000.00 60,000.00 440,000.00 440,000.00 190,000.00 190,000.00 224.1 HORIZONTAL DRAINS IN ROCK LF 7,500. 3.80 28,500.00 4.15 31,125.00 5.00 37,500.00 225.2 PRESTRESSED ROCK BOLTS LF 2,000. 85.00 170,000.00 105.00 210,000.00 115.00 230,000.00 225.3 ROCK DOWELS LF 2,000. 48.00 96,000.00 113.00 226,000.00 124.00 248,000.00 304.1 SAND (F) CY 69,535. 19.00 1,321,165.00 17.50 1,216,862.50 13.50 938,722.50 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 45,170. 12.75 575,917.50 17.00 767,890.00 14.50 654,965.00 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIM CY 800. 21.00 16,800.00 15.00 12,000.00 17.00 13,600.00 304.499 TEMPORARY CRUSHED STONE (FINE GRADATION) CY 60. 23.00 1,380.00 25.00 1,500.00 30.50 1,830.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 21,620. 12.75 275,655.00 17.00 367,540.00 14.00 302,680.00 315.5 CRUSHED STONE - ENERGY ABSORBING MATERIAL CY 850. 20.00 17,000.00 25.00 21,250.00 31.50 26,775.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 5,600. 70.80 396,480.00 68.00 380,800.00 74.00 414,400.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 45,300. 70.80 3,207,240.00 68.00 3,080,400.00 74.00 3,352,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 60. 115.00 6,900.00 120.00 7,200.00 121.00 7,260.00 403.6 PAVEMENT JOINT ADHESIVE LF 94,500. .26 24,570.00 .25 23,625.00 .30 28,350.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 3,800. 70.80 269,040.00 68.00 258,400.00 78.00 296,400.00 13933G PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 19,000. 2.60 49,400.00 2.50 47,500.00 3.00 57,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 23,000.00 23,000.00 75,000.00 75,000.00 36,000.00 36,000.00 503.102 WATER DIVERSION STRUCTURE U 1. 17,600.00 17,600.00 25,000.00 25,000.00 30,000.00 30,000.00 503.103 WATER DIVERSION STRUCTURE U 1. 17,600.00 17,600.00 3,000.00 3,000.00 51,400.00 51,400.00 503.104 WATER DIVERSION STRUCTURE U 1. 17,600.00 17,600.00 20,000.00 20,000.00 59,000.00 59,000.00 503.105 WATER DIVERSION STRUCTURE U 1. 23,000.00 23,000.00 10,000.00 10,000.00 94,000.00 94,000.00 503.106 WATER DIVERSION STRUCTURE U 1. 17,600.00 17,600.00 10,000.00 10,000.00 85,250.00 85,250.00 503.201 COFFERDAMS U 1. 35,400.00 35,400.00 41,500.00 41,500.00 38,000.00 38,000.00 503.202 COFFERDAMS U 1. 59,000.00 59,000.00 61,000.00 61,000.00 62,000.00 62,000.00 508. STRUCTURAL FILL CY 85. 52.50 4,462.50 35.00 2,975.00 46.00 3,910.00 520.1 CONCRETE CLASS A CY 120. 400.00 48,000.00 250.00 30,000.00 440.00 52,800.00 520.2 CONCRETE CLASS B CY 375. 260.00 97,500.00 275.00 103,125.00 303.00 113,625.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 156. 31.50 4,914.00 35.00 5,460.00 38.00 5,928.00 544.1 REINFORCING STEEL (ROADWAY) LB 40,000. 1.60 64,000.00 1.25 50,000.00 2.00 80,000.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 135. 100.00 13,500.00 100.00 13,500.00 110.00 14,850.00 565.222 BRIDGE APPROACH RAIL, T2 (STEEL POSTS) (F) LF 234. 145.00 33,930.00 128.00 29,952.00 200.00 46,800.00 585.2 STONE FILL, CLASS B CY 8,300. 10.00 83,000.00 17.00 141,100.00 34.00 282,200.00 585.3 STONE FILL, CLASS C CY 2,200. 18.00 39,600.00 22.00 48,400.00 38.00 83,600.00 585.4 STONE FILL, CLASS D CY 60. 32.00 1,920.00 30.00 1,800.00 41.00 2,460.00 585.5 STONE FILL, CLASS E CY 2,250. 26.00 58,500.00 25.00 56,250.00 42.00 94,500.00 585.7 STONE FILL, CLASS G CY 285. 27.00 7,695.00 40.00 11,400.00 43.00 12,255.00 593.231 GEOTEXTILE; SEPARATION CL.3, NON-WOVEN SY 36,000. 1.40 50,400.00 1.25 45,000.00 2.50 90,000.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 23,000. 1.65 37,950.00 2.30 52,900.00 2.50 57,500.00 602.32412 CURED-IN-PLACE LINER FOR 24" DRAINAGE PIPE LF 170. 242.00 41,140.00 236.00 40,120.00 253.00 43,010.00 602.33012 CURED-IN-PLACE LINER FOR 30" DRAINAGE PIPE LF 270. 305.00 82,350.00 295.00 79,650.00 319.00 86,130.00 602.33612 CURED-IN-PLACE LINER FOR 36" DRAINAGE PIPE LF 200. 400.00 80,000.00 385.00 77,000.00 418.00 83,600.00 602.34812 CURED-IN-PLACE LINER FOR 48" DRAINAGE PIPE LF 220. 540.00 118,800.00 520.00 114,400.00 566.00 124,520.00 603.00215 15" R.C. PIPE, 2000D LF 970. 38.00 36,860.00 35.00 33,950.00 38.00 36,860.00 603.00218 18" R.C. PIPE, 2000D LF 200. 41.00 8,200.00 40.00 8,000.00 42.00 8,400.00 603.00224 24" R.C. PIPE, 2000D LF 475. 50.00 23,750.00 60.00 28,500.00 54.00 25,650.00 603.00230 30" R.C. PIPE, 2000D LF 310. 60.00 18,600.00 70.00 21,700.00 66.00 20,460.00 603.00236 36" R.C. PIPE, 2000D LF 100. 86.00 8,600.00 92.00 9,200.00 93.00 9,300.00 603.00248 48" R.C. PIPE, 2000D LF 100. 122.00 12,200.00 120.00 12,000.00 134.00 13,400.00 603.00318 18" R.C. PIPE, 3000D LF 80. 42.00 3,360.00 40.00 3,200.00 43.00 3,440.00 603.00324 24" R.C. PIPE, 3000D LF 890. 50.00 44,500.00 60.00 53,400.00 55.00 48,950.00 603.00330 30" R.C. PIPE, 3000D LF 50. 75.00 3,750.00 85.00 4,250.00 78.00 3,900.00 603.00336 36" R.C. PIPE, 3000D LF 50. 86.00 4,300.00 95.00 4,750.00 95.00 4,750.00 603.00436 36" R.C. PIPE, 3750D LF 100. 86.00 8,600.00 100.00 10,000.00 102.00 10,200.00 603.00448 48" R.C. PIPE, 3750D LF 220. 122.00 26,840.00 145.00 31,900.00 170.00 37,400.00 13933G PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.21324 24" R.C. PIPE, 3000D PIPE SLEEVE LF 280. 66.00 18,480.00 100.00 28,000.00 55.00 15,400.00 603.30115 15" R.C. END SECTIONS EA 1. 650.00 650.00 600.00 600.00 800.00 800.00 603.30124 24" R.C. END SECTIONS EA 6. 800.00 4,800.00 730.00 4,380.00 1,500.00 9,000.00 603.30136 36" R.C. END SECTIONS EA 3. 1,225.00 3,675.00 1,200.00 3,600.00 2,000.00 6,000.00 603.36112 12" ALUMINIZED STEEL END SECTION EA 12. 245.00 2,940.00 185.00 2,220.00 350.00 4,200.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 6. 250.00 1,500.00 220.00 1,320.00 400.00 2,400.00 603.36118 18" ALUMINIZED STEEL END SECTION EA 9. 275.00 2,475.00 270.00 2,430.00 650.00 5,850.00 603.36124 24" ALUMINIZED STEEL END SECTION EA 7. 382.00 2,674.00 430.00 3,010.00 725.00 5,075.00 603.36130 30" ALUMINIZED STEEL END SECTION EA 3. 895.00 2,685.00 750.00 2,250.00 1,200.00 3,600.00 603.36136 36" ALUMINIZED STEEL END SECTION EA 2. 965.00 1,930.00 1,200.00 2,400.00 1,700.00 3,400.00 603.49012 12" PIPE FOR SLOPE DRAIN. (CONTRACTORS OPTION) LF 60. 32.00 1,920.00 38.00 2,280.00 21.00 1,260.00 603.61024 RELAYING 0-24" RCP DRAINAGE PIPE LF 24. 40.00 960.00 40.00 960.00 19.00 456.00 603.83204 4" PLASTIC PIPE (SMOOTH INTERIOR) LF 50. 28.00 1,400.00 25.00 1,250.00 24.00 1,200.00 603.83206 6" PLASTIC PIPE (SMOOTH INTERIOR) LF 100. 29.00 2,900.00 26.00 2,600.00 25.00 2,500.00 603.83210 10" PLASTIC PIPE (SMOOTH INTERIOR) LF 40. 30.00 1,200.00 30.00 1,200.00 29.00 1,160.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 490. 30.00 14,700.00 27.00 13,230.00 25.00 12,250.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 13,500. 33.00 445,500.00 29.00 391,500.00 28.00 378,000.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 4,600. 36.00 165,600.00 32.00 147,200.00 33.50 154,100.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,450. 42.00 60,900.00 43.00 62,350.00 42.00 60,900.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 215. 52.00 11,180.00 55.00 11,825.00 56.00 12,040.00 603.83236 36" PLASTIC PIPE (SMOOTH INTERIOR) LF 110. 72.00 7,920.00 65.00 7,150.00 58.00 6,380.00 604.0007 POLYETHYLENE LINER EA 126. 226.00 28,476.00 100.00 12,600.00 200.00 25,200.00 604.12 CATCH BASINS TYPE B U 105. 1,800.00 189,000.00 2,100.00 220,500.00 2,200.00 231,000.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 14. 2,370.00 33,180.00 2,550.00 35,700.00 2,800.00 39,200.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 4. 3,150.00 12,600.00 3,300.00 13,200.00 4,200.00 16,800.00 604.15 CATCH BASINS TYPE E U 51. 2,000.00 102,000.00 2,150.00 109,650.00 2,300.00 117,300.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 8. 2,575.00 20,600.00 2,875.00 23,000.00 2,900.00 23,200.00 604.16 CATCH BASINS TYPE F U 18. 1,900.00 34,200.00 2,000.00 36,000.00 2,000.00 36,000.00 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 4. 2,485.00 9,940.00 2,500.00 10,000.00 2,800.00 11,200.00 13933G PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.32 DRAINAGE MANHOLES U 5. 1,990.00 9,950.00 1,600.00 8,000.00 2,400.00 12,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 70. 200.00 14,000.00 350.00 24,500.00 400.00 28,000.00 604.6 MANHOLE COVERS & FRAMES EA 1. 530.00 530.00 750.00 750.00 400.00 400.00 604.9101 OUTLET CONTROL STRUCTURE 4'X4' U 1. 15,355.80 15,355.80 17,840.00 17,840.00 4,400.00 4,400.00 604.9102 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 3,255.80 3,255.80 4,036.00 4,036.00 2,800.00 2,800.00 604.9103 OUTLET CONTROL STRUCTURE 4'X4' U 1. 15,025.80 15,025.80 18,345.00 18,345.00 5,000.00 5,000.00 604.9104 OUTLET CONTROL STRUCTURE 5'X10' U 1. 19,590.80 19,590.80 22,700.00 22,700.00 11,000.00 11,000.00 604.9105 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 3,255.80 3,255.80 2,450.00 2,450.00 3,600.00 3,600.00 604.9106 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 3,255.80 3,255.80 2,450.00 2,450.00 3,600.00 3,600.00 604.9107 OUTLET CONTROL STRUCTURE 5'X10' U 1. 18,875.80 18,875.80 20,905.00 20,905.00 11,000.00 11,000.00 604.9108 OUTLET CONTROL STRUCTURE 5'X10' U 1. 18,875.80 18,875.80 20,905.00 20,905.00 11,000.00 11,000.00 604.9113 OUTLET CONTROL STRUCTURE 4' X 4' U 1. 15,713.30 15,713.30 15,465.00 15,465.00 3,600.00 3,600.00 604.921 LEACHING CHAMBER, TYPE 1 EA 10. 3,805.80 38,058.00 1,350.00 13,500.00 1,500.00 15,000.00 604.922 LEACHING CHAMBER, TYPE 2 EA 5. 4,355.80 21,779.00 1,250.00 6,250.00 1,200.00 6,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 25,700. 24.77 636,589.00 12.75 327,675.00 18.75 481,875.00 605.508 8" PERF. CORR. POLYETHYL PIPE UND. LF 1,000. 26.15 26,150.00 13.00 13,000.00 22.00 22,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 38. 347.00 13,186.00 590.00 22,420.00 400.00 15,200.00 605.798 UNDERDRAIN FLUSHING BASINS, 8" EA 16. 369.00 5,904.00 680.00 10,880.00 400.00 6,400.00 605.82251 24 " AGGREGATE UNDERDRAIN TYPE 2 WITH PERFORATED CORRUGATED POLY. PIPE LF 8,000. 30.65 245,200.00 20.00 160,000.00 21.00 168,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 12,000. 16.50 198,000.00 15.58 186,960.00 19.00 228,000.00 606.1403 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRANSITION SECTION LF 6,575. 25.00 164,375.00 23.48 154,381.00 25.00 164,375.00 606.1442 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRAN. SECTION LF 37.5 40.00 1,500.00 38.00 1,425.00 28.00 1,050.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 13. 2,220.00 28,860.00 2,012.00 26,156.00 2,200.00 28,600.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 5. 490.00 2,450.00 416.00 2,080.00 550.00 2,750.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POST (F) U 1. 2,500.00 2,500.00 2,386.00 2,386.00 2,700.00 2,700.00 606.412 CONCRETE BARRIER, DOUBLE- FACED, PRECAST LF 940. 69.00 64,860.00 67.30 63,262.00 39.00 36,660.00 13933G PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.41211 TRANSITION MEDIAN CONCRETE BARRIER, PRECAST U 1. 1,800.00 1,800.00 4,300.00 4,300.00 12,500.00 12,500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 7,500. 52.00 390,000.00 36.00 270,000.00 34.00 255,000.00 606.91 RESETTING OR SETTING GUARDRAIL LF 250. 15.60 3,900.00 15.00 3,750.00 11.00 2,750.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 4. 3,600.00 14,400.00 6,500.00 26,000.00 3,400.00 13,600.00 607.1 WOVEN WIRE FENCE LF 2,250. 7.50 16,875.00 5.00 11,250.00 9.00 20,250.00 607.41 POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 16. 200.00 3,200.00 350.00 5,600.00 240.00 3,840.00 607.652 CHAIN LINK FENCE WITH ALUMINUM-COATED STEEL FABRIC, 5 FEET HIGH LF 1,600. 24.00 38,400.00 15.00 24,000.00 19.00 30,400.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 14. 240.00 3,360.00 213.00 2,982.00 125.00 1,750.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 45. 31.00 1,395.00 35.00 1,575.00 26.00 1,170.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 15. 255.00 3,825.00 230.00 3,450.00 30.00 450.00 607.81862 18 FT. OPENING CHAIN LINK DOUBLE GATES W/ALUM. CTD STEEL FABRIC, 6 FT. HIGH EA 6. 1,560.00 9,360.00 1,500.00 9,000.00 1,900.00 11,400.00 608.28 8" CONCRETE SIDEWALK (F) SY 615. 54.00 33,210.00 60.00 36,900.00 56.50 34,747.50 609.01 STRAIGHT GRANITE CURB LF 685. 16.55 11,336.75 15.75 10,788.75 19.00 13,015.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 1,520. 11.30 17,176.00 10.50 15,960.00 16.00 24,320.00 609.23 CURVED GRANITE SLOPE CURB LF 9. 54.00 486.00 52.00 468.00 55.00 495.00 609.5 RESET GRANITE CURB LF 1,000. 5.25 5,250.00 6.00 6,000.00 9.00 9,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 17,800. 3.60 64,080.00 3.50 62,300.00 4.00 71,200.00 614.331 3" STEEL CONDUIT LF 125. 20.00 2,500.00 18.00 2,250.00 21.00 2,625.00 614.341 4" STEEL CONDUIT LF 160. 26.00 4,160.00 19.50 3,120.00 27.50 4,400.00 614.511 CONCRETE PULL BOX 14" EA 11. 312.00 3,432.00 290.00 3,190.00 327.00 3,597.00 614.523 MOLDED PULL BOX 17"X30" EA 9. 460.00 4,140.00 312.00 2,808.00 484.00 4,356.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 460. 7.60 3,496.00 6.63 3,049.80 9.00 4,140.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 30. 18.00 540.00 15.00 450.00 19.00 570.00 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 300. 8.40 2,520.00 8.00 2,400.00 10.00 3,000.00 614.7424 4" 2-DUCT PLASTIC CONDUIT SCHEDULE 40 LF 3,700. 10.70 39,590.00 9.00 33,300.00 12.00 44,400.00 614.7428 4" 2-DUCT PLASTIC CONDUIT SCHEDULE 80 LF 290. 15.35 4,451.50 16.00 4,640.00 16.50 4,785.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 491. 73.00 35,843.00 70.00 34,370.00 77.00 37,807.00 13933G PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.013 REMOVING TRAFFIC SIGN TYPE A U 6. 525.00 3,150.00 400.00 2,400.00 440.00 2,640.00 615.02 TRAFFIC SIGN TYPE B (F) SF 1,591.5 20.00 31,830.00 25.00 39,787.50 28.00 44,562.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 97. 120.00 11,640.00 110.00 10,670.00 125.00 12,125.00 615.023 REMOVING TRAFFIC SIGN TYPE B U 180. 31.00 5,580.00 10.00 1,800.00 12.00 2,160.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 6. 1,575.00 9,450.00 600.00 3,600.00 660.00 3,960.00 615.03 TRAFFIC SIGN TYPE C (F) SF 44. 50.00 2,200.00 40.00 1,760.00 44.00 1,936.00 615.032 TRAFFIC SIGN TYPE C, BREAKAWAY MOUNTS (F) SF 77. 155.00 11,935.00 125.00 9,625.00 138.00 10,626.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 3. 265.00 795.00 100.00 300.00 110.00 330.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 521. 16.80 8,752.80 16.00 8,336.00 18.00 9,378.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 158.67 65.00 10,313.55 35.00 5,553.45 38.50 6,108.80 615.06 TRAFFIC SIGN TYPE CC (F) SF 12. 9.50 114.00 10.00 120.00 11.00 132.00 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 50,400.00 50,400.00 55,000.00 55,000.00 57,300.00 57,300.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 55,650.00 55,650.00 64,500.00 64,500.00 67,650.00 67,650.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 30,450.00 30,450.00 36,500.00 36,500.00 38,500.00 38,500.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 34,900.00 34,900.00 36,500.00 36,500.00 38,500.00 38,500.00 615.20003 CANTILEVER TRAFFICS SIGN STRUCTURE U 1. 37,275.00 37,275.00 46,500.00 46,500.00 49,500.00 49,500.00 615.20004 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 49,000.00 49,000.00 46,000.00 46,000.00 48,950.00 48,950.00 616.101 TRAFFIC SIGNALS U 1. 46,460.00 46,460.00 29,900.00 29,900.00 48,675.00 48,675.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 625,000.00 625,000.00 625,000.00 625,000.00 625,000.00 625,000.00 618.7 FLAGGERS HR 250. 42.00 10,500.00 20.00 5,000.00 24.00 6,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 110,000.00 110,000.00 200,000.00 200,000.00 180,000.00 180,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 19,250.00 57,750.00 20,000.00 60,000.00 16,500.00 49,500.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 8,650.00 17,300.00 3,500.00 7,000.00 3,300.00 6,600.00 619.501 ASTI TRANSPORTATION SYSTEMS TRAFFIC SMART WORK ZONE U 1. 152,000.00 152,000.00 145,000.00 145,000.00 160,000.00 160,000.00 619.51 PORTABLE QUEUE TRAILER/SENSOR (PQT) MON 174. 630.00 109,620.00 600.00 104,400.00 660.00 114,840.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 116. 1,050.00 121,800.00 1,000.00 116,000.00 1,100.00 127,600.00 619.54 MOBILE VIDEO TRAILER WITH PAN TILT ZOOM (PTZ) MON 58. 1,890.00 109,620.00 1,800.00 104,400.00 2,000.00 116,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 13,500.00 27,000.00 25,000.00 50,000.00 16,500.00 33,000.00 13933G PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 15. 9.50 142.50 20.00 300.00 22.00 330.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 220. 4.50 990.00 5.00 1,100.00 4.50 990.00 621.31 SINGLE DELINEATOR WITH POST EA 350. 26.00 9,100.00 23.00 8,050.00 30.00 10,500.00 621.32 DOUBLE DELINEATOR WITH POST EA 20. 31.00 620.00 28.00 560.00 35.00 700.00 622.1 STEEL WITNESS MARKERS EA 130. 30.00 3,900.00 30.00 3,900.00 28.00 3,640.00 622.2 CONCRETE BOUNDS EA 18. 265.00 4,770.00 300.00 5,400.00 375.00 6,750.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 3. 830.00 2,490.00 590.00 1,770.00 850.00 2,550.00 625.52 LIGHT POLE (HIGHWAY) U 3. 1,900.00 5,700.00 1,925.00 5,775.00 2,100.00 6,300.00 628.1 SAWED CONCRETE PAVEMENT LF 180. 3.25 585.00 6.00 1,080.00 5.00 900.00 628.2 SAWED BITUMINOUS PAVEMENT LF 175. 2.70 472.50 2.00 350.00 2.00 350.00 631.024 MODULAR GLARE SCREEN LF 940. 29.50 27,730.00 20.00 18,800.00 28.00 26,320.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 22,500. .10 2,250.00 .09 2,025.00 .12 2,700.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 249,000. .14 34,860.00 .13 32,370.00 .15 37,350.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 25,500. .40 10,200.00 .26 6,630.00 .50 12,750.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 130. .80 104.00 2.20 286.00 1.00 130.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 950. 1.30 1,235.00 1.35 1,282.50 1.50 1,425.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 4.20 1,470.00 3.75 1,312.50 5.00 1,750.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 21,300. .30 6,390.00 .28 5,964.00 .30 6,390.00 632.9112 OBLITERATE PAVEMENT MARKING, 12" LINE LF 650. 1.05 682.50 .70 455.00 1.25 812.50 645.0001 EROSION CONTROL TURBIDITY BARRIER LF 1,000. 23.00 23,000.00 12.00 12,000.00 40.00 40,000.00 645.11 MULCH A 30. 1,575.00 47,250.00 800.00 24,000.00 1,650.00 49,500.00 645.3 EROSION STONE TON 20,000. 14.00 280,000.00 20.00 400,000.00 14.00 280,000.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 373,000. .90 335,700.00 1.50 559,500.00 1.00 373,000.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 9,200. 2.50 23,000.00 3.50 32,200.00 2.50 23,000.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 5,000. 9.20 46,000.00 18.00 90,000.00 10.00 50,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 5,000. 9.00 45,000.00 12.00 60,000.00 9.00 45,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL LB 3,500. 1.05 3,675.00 2.00 7,000.00 1.10 3,850.00 645.531 SILT FENCE LF 22,000. 4.50 99,000.00 3.25 71,500.00 2.50 55,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 11,500.00 11,500.00 8,000.00 8,000.00 10,000.00 10,000.00 13933G PAGE 9 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 3,750. 50.00 187,500.00 50.00 187,500.00 54.00 202,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 77. 2,310.00 177,870.00 1,610.00 123,970.00 2,420.00 186,340.00 647.1 HUMUS CY 34,620. 10.80 373,896.00 25.00 865,500.00 9.00 311,580.00 647.22 HUMUS, INTERMIXED, 2" DEE CY 53. 18.00 954.00 30.00 1,590.00 12.00 636.00 647.29 WETLAND HUMUS CY 4,400. 11.00 48,400.00 12.00 52,800.00 12.00 52,800.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 6. 700.00 4,200.00 350.00 2,100.00 500.00 3,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 42,000.00 42,000.00 7,000.00 7,000.00 2,500.00 2,500.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 30,000.00 30,000.00 45,000.00 45,000.00 33,000.00 33,000.00 670.0462 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 30,000.00 30,000.00 28,000.00 28,000.00 12,000.00 12,000.00 670.048 CONSTRUCT EMERGENCY ACCESS ROAD U 1. 500,000.00 500,000.00 300,000.00 300,000.00 452,400.00 452,400.00 670.101 TEMPORARY LIGHTING U 1. 20,000.00 20,000.00 47,850.00 47,850.00 22,000.00 22,000.00 670.95 TEMPORARY SAFETY FENCE LF 2,200. 3.80 8,360.00 4.00 8,800.00 4.00 8,800.00 692. MOBILIZATION U 1. 915,500.00 915,500.00 2,450,000.00 2,450,000.00 2,789,390.00 2,789,390.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 698.11913 FIELD OFFICE EQUIPMENT AND SUPPLIES MON 30. 500.00 15,000.00 1,250.00 37,500.00 2,000.00 60,000.00 698.2 PHYSICAL TESTING LABORATORY MON 30. 300.00 9,000.00 700.00 21,000.00 1,500.00 45,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 802.11 BUILDING RENOVATIONS (CORRIDOR FIELD OFFICE) U 1. 472,500.00 472,500.00 495,000.00 495,000.00 552,000.00 552,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.6 ALTERATIONS AND ADDITIONS AS NEEDED- DRINKING WATER RESOURCE PROT. $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 $25,969,102.80 $27,575,534.00 $27,946,970.30 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-MANCHESTER A000(127), 13933G COUNTIES AND CODES: ROCKINGHAM 015 HILLSBOROUGH 011 DATE BIDS OPEN: APRIL 15, 2009 SCOPE OF WORK: ROADWAY AND BRIDGE RECONSTRUCTION LOCATION: I-93, NH ROUTES 11 AND 111A COMPLETION DATE: NOVEMBER 1, 2011 A GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE RD., WINDHAM, NH 03087 $25,969,102.80 B SEVERINO TRUCKING CO, INC. 512 RAYMOND ROAD, CANDIA, NH 03034 $27,575,534.00 C SARGENT CORPORATION 378 BENNOCH RD., STILLWATER, ME 04489 $27,946,970.30 D PARK CONSTRUCTION CORP. PO BOX 600, FITZWILLIAM, NH 03447 $29,226,154.22 E THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $31,355,880.20 F ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $31,718,300.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 55.5 4,000.00 222,000.00 4,000.00 222,000.00 7,000.00 388,500.00 201.6 CLEARING FOR FENCE LINES (F) A .4 3,500.00 1,400.00 10,000.00 4,000.00 8,000.00 3,200.00 201.8811 INVASIVE SPECIES CONTROL TYPE 1 A 3.3 1,800.00 5,940.00 1,000.00 3,300.00 1,700.00 5,610.00 201.8821 INVASIVE SPECIES CONTROL TYPE 2 A 3.25 4,500.00 14,625.00 2,000.00 6,500.00 1,700.00 5,525.00 202.31 FILL ABANDONED PIPE CY 90. 170.00 15,300.00 200.00 18,000.00 150.00 13,500.00 202.32 FILL ABANDONED STRUCTURE CY 20. 150.00 3,000.00 250.00 5,000.00 150.00 3,000.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 3,000. 10.00 30,000.00 13.00 39,000.00 11.00 33,000.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 11. 350.00 3,850.00 270.00 2,970.00 325.00 3,575.00 202.7 REMOVAL OF GUARDRAIL (F) LF 17,720. 1.10 19,492.00 1.50 26,580.00 1.15 20,378.00 203.1 COMMON EXCAVATION CY 355,000. 4.00 1,420,000.00 4.00 1,420,000.00 4.75 1,686,250.00 203.2 ROCK EXCAVATION CY 417,000. 11.00 4,587,000.00 11.70 4,878,900.00 12.00 5,004,000.00 203.4 MUCK EXCAVATION CY 37,820. 7.00 264,740.00 7.40 279,868.00 10.00 378,200.00 203.52 IMPERVIOUS MATERIAL (F) CY 15,995. 12.00 191,940.00 11.00 175,945.00 15.00 239,925.00 203.5525 PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM U 3. 1,500.00 4,500.00 600.00 1,800.00 1,500.00 4,500.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 13. 1,800.00 23,400.00 900.00 11,700.00 650.00 8,450.00 13933G PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) CY 532,000. 3.00 1,596,000.00 4.60 2,447,200.00 4.75 2,527,000.00 203.62 EMBANKMENT-IN-PLACE REPLACEMENT MATERIAL CY 9,600. 8.00 76,800.00 8.00 76,800.00 12.00 115,200.00 203.81 PRESPLITTING HOLES LF 40,700. 5.00 203,500.00 5.20 211,640.00 5.25 213,675.00 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 6,000. 3.00 18,000.00 3.00 18,000.00 2.90 17,400.00 203.91 ROCK SCALING- HAND METHOD HR 300. 260.00 78,000.00 240.00 72,000.00 236.30 70,890.00 203.92 ROCK SCALING- MACHINE METHOD HR 450. 250.00 112,500.00 260.00 117,000.00 262.50 118,125.00 203.93 HYDROGEOLOGIST U 1. 30,000.00 30,000.00 60,000.00 60,000.00 29,400.00 29,400.00 203.94 BASELINE WATER SAMPLING EA 208. 300.00 62,400.00 335.00 69,680.00 315.00 65,520.00 203.95 EXTENDED WATER SAMPLING EA 24. 1,100.00 26,400.00 840.00 20,160.00 1,050.00 25,200.00 206.1 COMMON STRUCTURE EXCAVATION CY 5,200. 10.00 52,000.00 13.50 70,200.00 10.00 52,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 60. 25.00 1,500.00 100.00 6,000.00 35.00 2,100.00 206.2 ROCK STRUCTURE EXCAVATION CY 8,500. 35.00 297,500.00 40.00 340,000.00 50.00 425,000.00 209.1 GRANULAR BACKFILL CY 5,500. 25.00 137,500.00 20.00 110,000.00 18.00 99,000.00 210.63 GROUNDWATER OBSERVATION WELL (SOIL DRILLING) LF 125. 35.00 4,375.00 34.00 4,250.00 34.65 4,331.25 210.64 GROUNDWATER OBSERVATION WELL (ROCK DRILLING) LF 375. 22.00 8,250.00 10.00 3,750.00 10.50 3,937.50 210.7 PROTECTIVE CASING WITH CAP AND LOCK EA 5. 350.00 1,750.00 1,200.00 6,000.00 1,207.00 6,035.00 214. FINE GRADING U 1. 135,000.00 135,000.00 150,000.00 150,000.00 350,000.00 350,000.00 224.1 HORIZONTAL DRAINS IN ROCK LF 7,500. 4.00 30,000.00 3.20 24,000.00 4.35 32,625.00 225.2 PRESTRESSED ROCK BOLTS LF 2,000. 135.00 270,000.00 140.00 280,000.00 110.30 220,600.00 225.3 ROCK DOWELS LF 2,000. 104.00 208,000.00 80.00 160,000.00 118.70 237,400.00 304.1 SAND (F) CY 69,535. 16.00 1,112,560.00 20.00 1,390,700.00 15.50 1,077,792.50 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 45,170. 15.00 677,550.00 17.00 767,890.00 20.00 903,400.00 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIM CY 800. 18.00 14,400.00 29.00 23,200.00 25.00 20,000.00 304.499 TEMPORARY CRUSHED STONE (FINE GRADATION) CY 60. 25.00 1,500.00 26.00 1,560.00 25.00 1,500.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 21,620. 15.00 324,300.00 20.00 432,400.00 20.00 432,400.00 315.5 CRUSHED STONE - ENERGY ABSORBING MATERIAL CY 850. 25.00 21,250.00 32.00 27,200.00 25.00 21,250.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 5,600. 68.00 380,800.00 70.00 392,000.00 70.75 396,200.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 45,300. 68.00 3,080,400.00 70.00 3,171,000.00 70.75 3,204,975.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 60. 110.00 6,600.00 115.00 6,900.00 115.50 6,930.00 403.6 PAVEMENT JOINT ADHESIVE LF 94,500. .25 23,625.00 .26 24,570.00 .25 23,625.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 3,800. 68.00 258,400.00 68.00 258,400.00 70.75 268,850.00 13933G PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 19,000. 2.50 47,500.00 3.00 57,000.00 3.55 67,450.00 503.101 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 85,000.00 85,000.00 25,000.00 25,000.00 503.102 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 50,000.00 50,000.00 25,000.00 25,000.00 503.103 WATER DIVERSION STRUCTURE U 1. 12,000.00 12,000.00 35,000.00 35,000.00 25,000.00 25,000.00 503.104 WATER DIVERSION STRUCTURE U 1. 14,000.00 14,000.00 40,000.00 40,000.00 25,000.00 25,000.00 503.105 WATER DIVERSION STRUCTURE U 1. 18,000.00 18,000.00 45,000.00 45,000.00 25,000.00 25,000.00 503.106 WATER DIVERSION STRUCTURE U 1. 15,000.00 15,000.00 70,000.00 70,000.00 25,000.00 25,000.00 503.201 COFFERDAMS U 1. 35,000.00 35,000.00 54,000.00 54,000.00 39,690.00 39,690.00 503.202 COFFERDAMS U 1. 35,000.00 35,000.00 78,000.00 78,000.00 27,300.00 27,300.00 508. STRUCTURAL FILL CY 85. 26.00 2,210.00 32.00 2,720.00 35.00 2,975.00 520.1 CONCRETE CLASS A CY 120. 450.00 54,000.00 1,000.00 120,000.00 600.00 72,000.00 520.2 CONCRETE CLASS B CY 375. 275.00 103,125.00 248.00 93,000.00 300.00 112,500.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 156. 35.00 5,460.00 20.00 3,120.00 33.60 5,241.60 544.1 REINFORCING STEEL (ROADWAY) LB 40,000. 1.50 60,000.00 1.50 60,000.00 1.65 66,000.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 135. 100.00 13,500.00 108.00 14,580.00 102.40 13,824.00 565.222 BRIDGE APPROACH RAIL, T2 (STEEL POSTS) (F) LF 234. 140.00 32,760.00 140.00 32,760.00 144.90 33,906.60 585.2 STONE FILL, CLASS B CY 8,300. 20.00 166,000.00 24.00 199,200.00 26.00 215,800.00 585.3 STONE FILL, CLASS C CY 2,200. 20.00 44,000.00 34.00 74,800.00 26.00 57,200.00 585.4 STONE FILL, CLASS D CY 60. 25.00 1,500.00 60.00 3,600.00 35.00 2,100.00 585.5 STONE FILL, CLASS E CY 2,250. 25.00 56,250.00 38.00 85,500.00 35.00 78,750.00 585.7 STONE FILL, CLASS G CY 285. 25.00 7,125.00 41.00 11,685.00 35.00 9,975.00 593.231 GEOTEXTILE; SEPARATION CL.3, NON-WOVEN SY 36,000. 3.00 108,000.00 3.00 108,000.00 1.75 63,000.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 23,000. 3.00 69,000.00 3.60 82,800.00 2.00 46,000.00 602.32412 CURED-IN-PLACE LINER FOR 24" DRAINAGE PIPE LF 170. 230.00 39,100.00 200.00 34,000.00 241.50 41,055.00 602.33012 CURED-IN-PLACE LINER FOR 30" DRAINAGE PIPE LF 270. 290.00 78,300.00 210.00 56,700.00 304.50 82,215.00 602.33612 CURED-IN-PLACE LINER FOR 36" DRAINAGE PIPE LF 200. 380.00 76,000.00 300.00 60,000.00 399.00 79,800.00 602.34812 CURED-IN-PLACE LINER FOR 48" DRAINAGE PIPE LF 220. 515.00 113,300.00 450.00 99,000.00 540.70 118,954.00 603.00215 15" R.C. PIPE, 2000D LF 970. 40.00 38,800.00 40.00 38,800.00 37.00 35,890.00 603.00218 18" R.C. PIPE, 2000D LF 200. 44.00 8,800.00 47.00 9,400.00 48.00 9,600.00 603.00224 24" R.C. PIPE, 2000D LF 475. 50.00 23,750.00 80.00 38,000.00 231.60 110,010.00 603.00230 30" R.C. PIPE, 2000D LF 310. 60.00 18,600.00 64.00 19,840.00 73.00 22,630.00 603.00236 36" R.C. PIPE, 2000D LF 100. 80.00 8,000.00 65.00 6,500.00 84.00 8,400.00 603.00248 48" R.C. PIPE, 2000D LF 100. 170.00 17,000.00 122.00 12,200.00 115.00 11,500.00 603.00318 18" R.C. PIPE, 3000D LF 80. 46.00 3,680.00 40.00 3,200.00 60.00 4,800.00 603.00324 24" R.C. PIPE, 3000D LF 890. 55.00 48,950.00 81.00 72,090.00 151.60 134,924.00 603.00330 30" R.C. PIPE, 3000D LF 50. 70.00 3,500.00 65.00 3,250.00 83.00 4,150.00 603.00336 36" R.C. PIPE, 3000D LF 50. 85.00 4,250.00 82.00 4,100.00 95.00 4,750.00 603.00436 36" R.C. PIPE, 3750D LF 100. 90.00 9,000.00 82.00 8,200.00 120.00 12,000.00 603.00448 48" R.C. PIPE, 3750D LF 220. 175.00 38,500.00 138.00 30,360.00 150.00 33,000.00 13933G PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.21324 24" R.C. PIPE, 3000D PIPE SLEEVE LF 280. 65.00 18,200.00 100.00 28,000.00 150.00 42,000.00 603.30115 15" R.C. END SECTIONS EA 1. 600.00 600.00 800.00 800.00 575.00 575.00 603.30124 24" R.C. END SECTIONS EA 6. 850.00 5,100.00 1,000.00 6,000.00 950.00 5,700.00 603.30136 36" R.C. END SECTIONS EA 3. 1,500.00 4,500.00 1,400.00 4,200.00 1,400.00 4,200.00 603.36112 12" ALUMINIZED STEEL END SECTION EA 12. 300.00 3,600.00 300.00 3,600.00 225.00 2,700.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 6. 350.00 2,100.00 350.00 2,100.00 235.00 1,410.00 603.36118 18" ALUMINIZED STEEL END SECTION EA 9. 500.00 4,500.00 400.00 3,600.00 295.00 2,655.00 603.36124 24" ALUMINIZED STEEL END SECTION EA 7. 650.00 4,550.00 500.00 3,500.00 340.00 2,380.00 603.36130 30" ALUMINIZED STEEL END SECTION EA 3. 900.00 2,700.00 900.00 2,700.00 450.00 1,350.00 603.36136 36" ALUMINIZED STEEL END SECTION EA 2. 1,400.00 2,800.00 1,000.00 2,000.00 500.00 1,000.00 603.49012 12" PIPE FOR SLOPE DRAIN. (CONTRACTORS OPTION) LF 60. 35.00 2,100.00 32.00 1,920.00 28.00 1,680.00 603.61024 RELAYING 0-24" RCP DRAINAGE PIPE LF 24. 40.00 960.00 47.00 1,128.00 60.00 1,440.00 603.83204 4" PLASTIC PIPE (SMOOTH INTERIOR) LF 50. 25.00 1,250.00 14.00 700.00 18.00 900.00 603.83206 6" PLASTIC PIPE (SMOOTH INTERIOR) LF 100. 27.00 2,700.00 16.00 1,600.00 22.00 2,200.00 603.83210 10" PLASTIC PIPE (SMOOTH INTERIOR) LF 40. 30.00 1,200.00 30.00 1,200.00 22.00 880.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 490. 35.00 17,150.00 25.00 12,250.00 24.00 11,760.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 13,500. 37.00 499,500.00 27.00 364,500.00 30.00 405,000.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 4,600. 39.00 179,400.00 32.00 147,200.00 36.00 165,600.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,450. 45.00 65,250.00 41.00 59,450.00 42.00 60,900.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 215. 55.00 11,825.00 57.00 12,255.00 55.00 11,825.00 603.83236 36" PLASTIC PIPE (SMOOTH INTERIOR) LF 110. 65.00 7,150.00 62.00 6,820.00 65.00 7,150.00 604.0007 POLYETHYLENE LINER EA 126. 155.00 19,530.00 160.00 20,160.00 225.00 28,350.00 604.12 CATCH BASINS TYPE B U 105. 1,500.00 157,500.00 1,800.00 189,000.00 1,900.00 199,500.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 14. 2,000.00 28,000.00 2,100.00 29,400.00 3,400.00 47,600.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 4. 2,700.00 10,800.00 3,000.00 12,000.00 3,500.00 14,000.00 604.15 CATCH BASINS TYPE E U 51. 1,700.00 86,700.00 2,100.00 107,100.00 2,000.00 102,000.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 8. 2,200.00 17,600.00 2,500.00 20,000.00 2,800.00 22,400.00 604.16 CATCH BASINS TYPE F U 18. 1,900.00 34,200.00 1,900.00 34,200.00 2,000.00 36,000.00 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 4. 2,400.00 9,600.00 2,400.00 9,600.00 2,800.00 11,200.00 13933G PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.32 DRAINAGE MANHOLES U 5. 2,000.00 10,000.00 2,000.00 10,000.00 1,950.00 9,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 70. 250.00 17,500.00 480.00 33,600.00 325.00 22,750.00 604.6 MANHOLE COVERS & FRAMES EA 1. 350.00 350.00 600.00 600.00 400.00 400.00 604.9101 OUTLET CONTROL STRUCTURE 4'X4' U 1. 16,500.00 16,500.00 25,000.00 25,000.00 3,685.00 3,685.00 604.9102 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 2,500.00 2,500.00 5,000.00 5,000.00 2,500.00 2,500.00 604.9103 OUTLET CONTROL STRUCTURE 4'X4' U 1. 16,000.00 16,000.00 25,000.00 25,000.00 3,390.00 3,390.00 604.9104 OUTLET CONTROL STRUCTURE 5'X10' U 1. 21,000.00 21,000.00 32,000.00 32,000.00 7,510.00 7,510.00 604.9105 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 2,500.00 2,500.00 5,000.00 5,000.00 2,300.00 2,300.00 604.9106 OUTLET CONTROL STRUCTURE 4' DIA. U 1. 2,500.00 2,500.00 5,000.00 5,000.00 2,300.00 2,300.00 604.9107 OUTLET CONTROL STRUCTURE 5'X10' U 1. 21,000.00 21,000.00 30,000.00 30,000.00 6,790.00 6,790.00 604.9108 OUTLET CONTROL STRUCTURE 5'X10' U 1. 21,000.00 21,000.00 30,000.00 30,000.00 6,790.00 6,790.00 604.9113 OUTLET CONTROL STRUCTURE 4' X 4' U 1. 15,000.00 15,000.00 22,000.00 22,000.00 3,015.00 3,015.00 604.921 LEACHING CHAMBER, TYPE 1 EA 10. 1,500.00 15,000.00 1,800.00 18,000.00 580.00 5,800.00 604.922 LEACHING CHAMBER, TYPE 2 EA 5. 1,300.00 6,500.00 1,800.00 9,000.00 465.00 2,325.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 25,700. 20.00 514,000.00 14.00 359,800.00 15.00 385,500.00 605.508 8" PERF. CORR. POLYETHYL PIPE UND. LF 1,000. 24.00 24,000.00 18.00 18,000.00 16.00 16,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 38. 550.00 20,900.00 520.00 19,760.00 600.00 22,800.00 605.798 UNDERDRAIN FLUSHING BASINS, 8" EA 16. 600.00 9,600.00 600.00 9,600.00 600.00 9,600.00 605.82251 24 " AGGREGATE UNDERDRAIN TYPE 2 WITH PERFORATED CORRUGATED POLY. PIPE LF 8,000. 45.00 360,000.00 25.00 200,000.00 25.00 200,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 12,000. 15.70 188,400.00 16.00 192,000.00 16.45 197,400.00 606.1403 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRANSITION SECTION LF 6,575. 24.00 157,800.00 24.00 157,800.00 24.95 164,046.25 606.1442 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRAN. SECTION LF 37.5 40.00 1,500.00 40.00 1,500.00 39.90 1,496.25 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 13. 2,150.00 27,950.00 2,150.00 27,950.00 2,218.00 28,834.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 5. 470.00 2,350.00 470.00 2,350.00 489.30 2,446.50 606.312 SINGLE FACED TRANSITION RAIL, STEEL POST (F) U 1. 2,400.00 2,400.00 2,400.00 2,400.00 2,505.00 2,505.00 606.412 CONCRETE BARRIER, DOUBLE- FACED, PRECAST LF 940. 60.00 56,400.00 75.00 70,500.00 80.00 75,200.00 13933G PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.41211 TRANSITION MEDIAN CONCRETE BARRIER, PRECAST U 1. 3,500.00 3,500.00 1,600.00 1,600.00 3,500.00 3,500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 7,500. 30.00 225,000.00 36.00 270,000.00 28.00 210,000.00 606.91 RESETTING OR SETTING GUARDRAIL LF 250. 15.00 3,750.00 15.00 3,750.00 15.65 3,912.50 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 4. 5,200.00 20,800.00 5,500.00 22,000.00 5,460.00 21,840.00 607.1 WOVEN WIRE FENCE LF 2,250. 7.20 16,200.00 7.20 16,200.00 7.45 16,762.50 607.41 POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 16. 200.00 3,200.00 200.00 3,200.00 206.90 3,310.40 607.652 CHAIN LINK FENCE WITH ALUMINUM-COATED STEEL FABRIC, 5 FEET HIGH LF 1,600. 23.00 36,800.00 23.00 36,800.00 24.00 38,400.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 14. 230.00 3,220.00 220.00 3,080.00 233.10 3,263.40 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 45. 30.00 1,350.00 30.00 1,350.00 30.65 1,379.25 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 15. 250.00 3,750.00 240.00 3,600.00 254.10 3,811.50 607.81862 18 FT. OPENING CHAIN LINK DOUBLE GATES W/ALUM. CTD STEEL FABRIC, 6 FT. HIGH EA 6. 1,500.00 9,000.00 1,500.00 9,000.00 1,556.00 9,336.00 608.28 8" CONCRETE SIDEWALK (F) SY 615. 55.00 33,825.00 50.00 30,750.00 53.95 33,179.25 609.01 STRAIGHT GRANITE CURB LF 685. 15.00 10,275.00 18.00 12,330.00 18.90 12,946.50 609.21 STRAIGHT GRANITE SLOPE CURB LF 1,520. 15.00 22,800.00 13.00 19,760.00 13.65 20,748.00 609.23 CURVED GRANITE SLOPE CURB LF 9. 50.00 450.00 55.00 495.00 57.75 519.75 609.5 RESET GRANITE CURB LF 1,000. 6.00 6,000.00 12.00 12,000.00 8.95 8,950.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 17,800. 3.50 62,300.00 3.00 53,400.00 3.70 65,860.00 614.331 3" STEEL CONDUIT LF 125. 16.00 2,000.00 20.00 2,500.00 19.95 2,493.75 614.341 4" STEEL CONDUIT LF 160. 20.00 3,200.00 26.00 4,160.00 26.25 4,200.00 614.511 CONCRETE PULL BOX 14" EA 11. 290.00 3,190.00 300.00 3,300.00 311.80 3,429.80 614.523 MOLDED PULL BOX 17"X30" EA 9. 310.00 2,790.00 450.00 4,050.00 462.00 4,158.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 460. 7.00 3,220.00 7.50 3,450.00 7.55 3,473.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 30. 15.00 450.00 18.00 540.00 18.05 541.50 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 300. 8.00 2,400.00 8.00 2,400.00 8.40 2,520.00 614.7424 4" 2-DUCT PLASTIC CONDUIT SCHEDULE 40 LF 3,700. 9.00 33,300.00 10.50 38,850.00 10.70 39,590.00 614.7428 4" 2-DUCT PLASTIC CONDUIT SCHEDULE 80 LF 290. 16.00 4,640.00 15.00 4,350.00 15.35 4,451.50 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 491. 70.00 34,370.00 70.00 34,370.00 73.50 36,088.50 13933G PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.013 REMOVING TRAFFIC SIGN TYPE A U 6. 500.00 3,000.00 500.00 3,000.00 420.00 2,520.00 615.02 TRAFFIC SIGN TYPE B (F) SF 1,591.5 20.00 31,830.00 20.00 31,830.00 26.25 41,776.88 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 97. 115.00 11,155.00 116.00 11,252.00 115.50 11,203.50 615.023 REMOVING TRAFFIC SIGN TYPE B U 180. 30.00 5,400.00 30.00 5,400.00 10.50 1,890.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 6. 1,500.00 9,000.00 1,500.00 9,000.00 630.00 3,780.00 615.03 TRAFFIC SIGN TYPE C (F) SF 44. 52.00 2,288.00 50.00 2,200.00 42.00 1,848.00 615.032 TRAFFIC SIGN TYPE C, BREAKAWAY MOUNTS (F) SF 77. 148.00 11,396.00 150.00 11,550.00 131.30 10,110.10 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 3. 250.00 750.00 260.00 780.00 105.00 315.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 521. 16.00 8,336.00 16.00 8,336.00 16.80 8,752.80 615.05 TRAFFIC SIGN TYPE BB (F) SF 158.67 66.00 10,472.22 60.00 9,520.20 36.75 5,831.12 615.06 TRAFFIC SIGN TYPE CC (F) SF 12. 10.00 120.00 10.00 120.00 10.50 126.00 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,400.00 50,400.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 54,000.00 54,000.00 55,000.00 55,000.00 55,650.00 55,650.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 31,000.00 31,000.00 30,000.00 30,000.00 30,450.00 30,450.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 33,000.00 33,000.00 35,000.00 35,000.00 34,910.00 34,910.00 615.20003 CANTILEVER TRAFFICS SIGN STRUCTURE U 1. 36,000.00 36,000.00 38,000.00 38,000.00 37,275.00 37,275.00 615.20004 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 47,500.00 47,500.00 48,000.00 48,000.00 49,035.00 49,035.00 616.101 TRAFFIC SIGNALS U 1. 30,000.00 30,000.00 40,000.00 40,000.00 46,460.00 46,460.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 625,000.00 625,000.00 625,000.00 625,000.00 625,000.00 625,000.00 618.7 FLAGGERS HR 250. 24.00 6,000.00 24.00 6,000.00 26.00 6,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 412,000.00 412,000.00 240,000.00 240,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 15,000.00 45,000.00 20,000.00 60,000.00 30,000.00 90,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 8,200.00 16,400.00 8,000.00 16,000.00 2,500.00 5,000.00 619.501 ASTI TRANSPORTATION SYSTEMS TRAFFIC SMART WORK ZONE U 1. 145,000.00 145,000.00 170,000.00 170,000.00 152,200.00 152,200.00 619.51 PORTABLE QUEUE TRAILER/SENSOR (PQT) MON 174. 650.00 113,100.00 650.00 113,100.00 630.00 109,620.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 116. 1,100.00 127,600.00 1,000.00 116,000.00 1,050.00 121,800.00 619.54 MOBILE VIDEO TRAILER WITH PAN TILT ZOOM (PTZ) MON 58. 2,000.00 116,000.00 1,800.00 104,400.00 1,890.00 109,620.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 12,000.00 24,000.00 50,000.00 100,000.00 25,000.00 50,000.00 13933G PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 15. 6.00 90.00 20.00 300.00 9.00 135.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 220. 4.50 990.00 5.00 1,100.00 4.50 990.00 621.31 SINGLE DELINEATOR WITH POST EA 350. 30.00 10,500.00 28.00 9,800.00 29.40 10,290.00 621.32 DOUBLE DELINEATOR WITH POST EA 20. 40.00 800.00 40.00 800.00 39.90 798.00 622.1 STEEL WITNESS MARKERS EA 130. 25.00 3,250.00 25.00 3,250.00 25.20 3,276.00 622.2 CONCRETE BOUNDS EA 18. 252.00 4,536.00 275.00 4,950.00 264.60 4,762.80 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 3. 600.00 1,800.00 600.00 1,800.00 829.50 2,488.50 625.52 LIGHT POLE (HIGHWAY) U 3. 2,000.00 6,000.00 2,000.00 6,000.00 1,900.00 5,700.00 628.1 SAWED CONCRETE PAVEMENT LF 180. 5.00 900.00 5.00 900.00 4.50 810.00 628.2 SAWED BITUMINOUS PAVEMENT LF 175. 2.00 350.00 3.00 525.00 2.50 437.50 631.024 MODULAR GLARE SCREEN LF 940. 28.00 26,320.00 28.00 26,320.00 26.25 24,675.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 22,500. .14 3,150.00 .10 2,250.00 .10 2,250.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 249,000. .12 29,880.00 .12 29,880.00 .15 37,350.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 25,500. .18 4,590.00 .26 6,630.00 .35 8,925.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 130. 2.00 260.00 2.20 286.00 .80 104.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 950. 1.00 950.00 1.40 1,330.00 1.25 1,187.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 5.00 1,750.00 3.80 1,330.00 4.20 1,470.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 21,300. .38 8,094.00 .30 6,390.00 .30 6,390.00 632.9112 OBLITERATE PAVEMENT MARKING, 12" LINE LF 650. .80 520.00 .70 455.00 1.05 682.50 645.0001 EROSION CONTROL TURBIDITY BARRIER LF 1,000. 20.00 20,000.00 32.00 32,000.00 7.00 7,000.00 645.11 MULCH A 30. 800.00 24,000.00 1,300.00 39,000.00 950.00 28,500.00 645.3 EROSION STONE TON 20,000. 35.00 700,000.00 9.00 180,000.00 20.00 400,000.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 373,000. 1.50 559,500.00 .74 276,020.00 1.55 578,150.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 9,200. 3.00 27,600.00 2.25 20,700.00 3.00 27,600.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 5,000. 8.00 40,000.00 17.00 85,000.00 20.00 100,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 5,000. 6.00 30,000.00 10.00 50,000.00 8.00 40,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL LB 3,500. 3.00 10,500.00 1.20 4,200.00 1.50 5,250.00 645.531 SILT FENCE LF 22,000. 3.00 66,000.00 3.00 66,000.00 5.00 110,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 9,000.00 9,000.00 12,000.00 12,000.00 7,245.00 7,245.00 13933G PAGE 9 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 3,750. 55.00 206,250.00 48.00 180,000.00 51.45 192,937.50 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 77. 1,600.00 123,200.00 2,000.00 154,000.00 1,700.00 130,900.00 647.1 HUMUS CY 34,620. 15.00 519,300.00 8.00 276,960.00 16.00 553,920.00 647.22 HUMUS, INTERMIXED, 2" DEE CY 53. 25.00 1,325.00 40.00 2,120.00 20.00 1,060.00 647.29 WETLAND HUMUS CY 4,400. 20.00 88,000.00 20.00 88,000.00 25.00 110,000.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 6. 750.00 4,500.00 500.00 3,000.00 1,000.00 6,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 25,000.00 25,000.00 4,000.00 4,000.00 70,000.00 70,000.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 110,000.00 110,000.00 80,000.00 80,000.00 50,000.00 50,000.00 670.0462 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 115,000.00 115,000.00 60,000.00 60,000.00 40,000.00 40,000.00 670.048 CONSTRUCT EMERGENCY ACCESS ROAD U 1. 385,000.00 385,000.00 480,000.00 480,000.00 575,000.00 575,000.00 670.101 TEMPORARY LIGHTING U 1. 48,000.00 48,000.00 28,000.00 28,000.00 20,525.00 20,525.00 670.95 TEMPORARY SAFETY FENCE LF 2,200. 3.00 6,600.00 3.50 7,700.00 4.50 9,900.00 692. MOBILIZATION U 1. 2,100,000.00 2,100,000.00 3,000,000.00 3,000,000.00 1,630,000.00 1,630,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 698.11913 FIELD OFFICE EQUIPMENT AND SUPPLIES MON 30. 1,500.00 45,000.00 1,000.00 30,000.00 4,000.00 120,000.00 698.2 PHYSICAL TESTING LABORATORY MON 30. 900.00 27,000.00 800.00 24,000.00 3,000.00 90,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 802.11 BUILDING RENOVATIONS (CORRIDOR FIELD OFFICE) U 1. 551,000.00 551,000.00 470,000.00 470,000.00 562,200.00 562,200.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.6 ALTERATIONS AND ADDITIONS AS NEEDED- DRINKING WATER RESOURCE PROT. $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 $29,226,154.22 $31,355,880.20 $31,718,300.25