THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RANDOLPH X-A000(211), 13602A COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JUNE 18, 2009 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: US ROUTE 2 IN RANDOLPH COMPLETION DATE: AUGUST 27, 2010 A A. R. COUTURE CONST. CORP. 1803 RIVERSIDE DR., BERLIN, NH 03570 $ 2,127,113.00 B J.A. MCDONALD, INC. PO BOX 132, LYNDON CENTER, VT 05850 $ 2,181,809.00 C WINTERSET, INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 2,242,081.25 D ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,341,281.50 E PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,374,249.10 E R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,399,892.50 G MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 2,432,772.50 H NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,489,885.00 I F. L. MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,559,962.30 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.5 13,600.00 34,000.00 8,000.00 20,000.00 8,800.00 22,000.00 201.21 REMOVING SMALL TREES EA 10. 50.00 500.00 300.00 3,000.00 160.00 1,600.00 202.201 DEMOLISHING BUILDINGS U 1. 1,570.00 1,570.00 15,000.00 15,000.00 5,700.00 5,700.00 202.301 BUILDING ASBESTOS ABATEMENT U 1. 1,000.00 1,000.00 3,000.00 3,000.00 2,000.00 2,000.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 40. 20.00 800.00 25.00 1,000.00 8.00 320.00 203.1 COMMON EXCAVATION CY 27,500. 7.30 200,750.00 7.00 192,500.00 3.90 107,250.00 203.2 ROCK EXCAVATION CY 2,300. 20.00 46,000.00 35.00 80,500.00 23.00 52,900.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 4. 1,500.00 6,000.00 1,000.00 4,000.00 1,300.00 5,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 13,000. 5.50 71,500.00 3.00 39,000.00 1.10 14,300.00 206.1 COMMON STRUCTURE EXCAVATION CY 410. 12.00 4,920.00 20.00 8,200.00 10.10 4,141.00 206.2 ROCK STRUCTURE EXCAVATION CY 195. 100.00 19,500.00 100.00 19,500.00 30.00 5,850.00 214. FINE GRADING U 1. 8,000.00 8,000.00 43,000.00 43,000.00 30,000.00 30,000.00 304.1 SAND (F) CY 11,200. 13.40 150,080.00 12.00 134,400.00 20.50 229,600.00 304.2 GRAVEL (F) CY 8,450. 13.00 109,850.00 13.00 109,850.00 20.50 173,225.00 13602A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.3 CRUSHED GRAVEL (F) CY 8,250. 18.00 148,500.00 16.00 132,000.00 24.00 198,000.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 280. 28.00 7,840.00 22.00 6,160.00 37.00 10,360.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 6,800. 77.00 523,600.00 74.00 503,200.00 75.00 510,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 130.00 9,100.00 128.00 8,960.00 125.00 8,750.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,500. .25 2,375.00 .25 2,375.00 .25 2,375.00 417. COLD PLANING BITUMINOUS SURFACES SY 300. 15.00 4,500.00 15.00 4,500.00 15.00 4,500.00 520.1 CONCRETE CLASS A CY 12. 600.00 7,200.00 600.00 7,200.00 600.00 7,200.00 570.4 MORTAR RUBBLE MASONRY (F) CY 35. 500.00 17,500.00 450.00 15,750.00 445.00 15,575.00 585.2 STONE FILL, CLASS B CY 80. 18.00 1,440.00 24.00 1,920.00 35.00 2,800.00 585.3 STONE FILL, CLASS C CY 320. 22.00 7,040.00 25.00 8,000.00 30.00 9,600.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 490. 2.00 980.00 1.00 490.00 2.00 980.00 603.00212 12" R.C. PIPE, 2000D LF 40. 41.25 1,650.00 60.00 2,400.00 31.40 1,256.00 603.00230 30" R.C. PIPE, 2000D LF 265. 80.00 21,200.00 75.00 19,875.00 49.00 12,985.00 603.14442 42" POLYMER COATED CORR. STEEL PIPE .109" THICK LF 100. 70.00 7,000.00 115.00 11,500.00 96.00 9,600.00 603.34112 12" STEEL END SECTIONS EA 4. 120.00 480.00 155.00 620.00 135.00 540.00 603.34115 15" STEEL END SECTIONS EA 2. 200.00 400.00 175.00 350.00 155.00 310.00 603.34130 30" STEEL END SECTIONS EA 1. 300.00 300.00 450.00 450.00 400.00 400.00 603.34136 36" STEEL END SECTIONS EA 1. 350.00 350.00 650.00 650.00 425.00 425.00 603.34142 42" STEEL END SECTIONS EA 2. 500.00 1,000.00 750.00 1,500.00 500.00 1,000.00 603.83124 24" PLASTIC PIPE (CORR. INTERIOR) LF 180. 40.00 7,200.00 45.00 8,100.00 21.00 3,780.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 65. 20.00 1,300.00 40.00 2,600.00 23.90 1,553.50 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 115. 43.00 4,945.00 48.00 5,520.00 40.00 4,600.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 100. 56.00 5,600.00 55.00 5,500.00 50.00 5,000.00 603.83242 42" PLASTIC PIPE (SMOOTH INTERIOR) LF 90. 86.00 7,740.00 80.00 7,200.00 73.00 6,570.00 604.22 DROP INLETS TYPE B U 1. 2,000.00 2,000.00 2,500.00 2,500.00 2,500.00 2,500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 4,350. 17.00 73,950.00 15.00 65,250.00 17.00 73,950.00 605.79 UNDERDRAIN FLUSHING BASINS EA 16. 350.00 5,600.00 400.00 6,400.00 340.00 5,440.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 675. 20.00 13,500.00 15.00 10,125.00 15.25 10,293.75 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 4. 2,500.00 10,000.00 2,000.00 8,000.00 2,000.00 8,000.00 608.36 6" REINFORCED SY 250. 44.00 11,000.00 40.00 10,000.00 38.00 9,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 108. 50.00 5,400.00 38.00 4,104.00 39.00 4,212.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8. 20.00 160.00 20.00 160.00 20.00 160.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 618.7 FLAGGERS HR 6,000. 17.00 102,000.00 9.00 54,000.00 21.00 126,000.00 13602A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 45,000.00 45,000.00 11,000.00 11,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 250.00 5,000.00 200.00 4,000.00 345.00 6,900.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 4.00 48.00 5.00 60.00 5.00 60.00 621.31 SINGLE DELINEATOR WITH POST EA 70. 30.00 2,100.00 30.00 2,100.00 30.00 2,100.00 622.1 STEEL WITNESS MARKERS EA 40. 30.00 1,200.00 22.00 880.00 22.00 880.00 622.2 CONCRETE BOUNDS EA 10. 250.00 2,500.00 100.00 1,000.00 102.00 1,020.00 628.1 SAWED CONCRETE PAVEMENT LF 25. 8.00 200.00 10.00 250.00 15.00 375.00 628.2 SAWED BITUMINOUS PAVEMENT LF 160. 1.50 240.00 5.00 800.00 2.00 320.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 36,600. .10 3,660.00 .15 5,490.00 .15 5,490.00 641. LOAM CY 250. 35.00 8,750.00 40.00 10,000.00 20.00 5,000.00 645.3 EROSION STONE TON 500. 30.00 15,000.00 30.00 15,000.00 60.00 30,000.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 3,500. 2.00 7,000.00 1.45 5,075.00 1.10 3,850.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 3,500. 2.50 8,750.00 1.40 4,900.00 1.00 3,500.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 750. 3.60 2,700.00 3.30 2,475.00 3.90 2,925.00 645.531 SILT FENCE LF 2,200. .75 1,650.00 3.00 6,600.00 2.50 5,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 4,000.00 4,000.00 7,400.00 7,400.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 192. 100.00 19,200.00 75.00 14,400.00 25.00 4,800.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.7 1,650.00 9,405.00 1,600.00 9,120.00 2,300.00 13,110.00 647.1 HUMUS CY 2,500. 10.00 25,000.00 16.00 40,000.00 16.00 40,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 200.00 600.00 250.00 750.00 250.00 750.00 692. MOBILIZATION U 1. 81,500.00 81,500.00 196,000.00 196,000.00 181,000.00 181,000.00 698.13 FIELD OFFICE TYPE C MON 17. 1,500.00 25,500.00 1,200.00 20,400.00 600.00 10,200.00 698.2 PHYSICAL TESTING LABORATORY MON 12. 600.00 7,200.00 1,100.00 13,200.00 300.00 3,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 $2,127,023.00 $2,181,809.00 $2,242,081.25 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RANDOLPH X-A000(211), 13602A COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JUNE 18, 2009 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: US ROUTE 2 IN RANDOLPH COMPLETION DATE: AUGUST 27, 2010 A A. R. COUTURE CONST. CORP. 1803 RIVERSIDE DR., BERLIN, NH 03570 $ 2,127,113.00 B J.A. MCDONALD, INC. PO BOX 132, LYNDON CENTER, VT 05850 $ 2,181,809.00 C WINTERSET, INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 2,242,081.25 D ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,341,281.50 E PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,374,249.10 E R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,399,892.50 G MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 2,432,772.50 H NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,489,885.00 I F. L. MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,559,962.30 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.5 7,000.00 17,500.00 7,200.00 18,000.00 7,000.00 17,500.00 201.21 REMOVING SMALL TREES EA 10. 250.00 2,500.00 112.00 1,120.00 325.00 3,250.00 202.201 DEMOLISHING BUILDINGS U 1. 9,000.00 9,000.00 8,320.00 8,320.00 7,500.00 7,500.00 202.301 BUILDING ASBESTOS ABATEMENT U 1. 1,000.00 1,000.00 1,690.00 1,690.00 2,650.00 2,650.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 40. 10.00 400.00 17.50 700.00 18.00 720.00 203.1 COMMON EXCAVATION CY 27,500. 6.00 165,000.00 5.80 159,500.00 5.00 137,500.00 203.2 ROCK EXCAVATION CY 2,300. 53.00 121,900.00 69.00 158,700.00 50.00 115,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 4. 2,500.00 10,000.00 1,070.00 4,280.00 1,800.00 7,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 13,000. 5.00 65,000.00 2.80 36,400.00 3.50 45,500.00 206.1 COMMON STRUCTURE EXCAVATION CY 410. 14.00 5,740.00 14.50 5,945.00 9.00 3,690.00 206.2 ROCK STRUCTURE EXCAVATION CY 195. 80.00 15,600.00 64.50 12,577.50 75.00 14,625.00 214. FINE GRADING U 1. 20,000.00 20,000.00 17,000.00 17,000.00 50,000.00 50,000.00 304.1 SAND (F) CY 11,200. 14.00 156,800.00 16.00 179,200.00 14.00 156,800.00 304.2 GRAVEL (F) CY 8,450. 20.00 169,000.00 13.00 109,850.00 20.00 169,000.00 13602A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.3 CRUSHED GRAVEL (F) CY 8,250. 23.00 189,750.00 25.50 210,375.00 23.00 189,750.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 280. 24.00 6,720.00 38.00 10,640.00 30.00 8,400.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 6,800. 78.75 535,500.00 77.00 523,600.00 75.00 510,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 120.00 8,400.00 115.00 8,050.00 130.00 9,100.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,500. .27 2,565.00 .37 3,515.00 .25 2,375.00 417. COLD PLANING BITUMINOUS SURFACES SY 300. 21.00 6,300.00 17.00 5,100.00 16.00 4,800.00 520.1 CONCRETE CLASS A CY 12. 400.00 4,800.00 815.00 9,780.00 750.00 9,000.00 570.4 MORTAR RUBBLE MASONRY (F) CY 35. 450.00 15,750.00 462.00 16,170.00 450.00 15,750.00 585.2 STONE FILL, CLASS B CY 80. 22.00 1,760.00 16.00 1,280.00 30.00 2,400.00 585.3 STONE FILL, CLASS C CY 320. 26.00 8,320.00 42.50 13,600.00 30.00 9,600.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 490. 2.00 980.00 .86 421.40 2.50 1,225.00 603.00212 12" R.C. PIPE, 2000D LF 40. 40.00 1,600.00 32.00 1,280.00 42.00 1,680.00 603.00230 30" R.C. PIPE, 2000D LF 265. 60.00 15,900.00 76.50 20,272.50 100.00 26,500.00 603.14442 42" POLYMER COATED CORR. STEEL PIPE .109" THICK LF 100. 90.00 9,000.00 129.00 12,900.00 120.00 12,000.00 603.34112 12" STEEL END SECTIONS EA 4. 200.00 800.00 114.00 456.00 275.00 1,100.00 603.34115 15" STEEL END SECTIONS EA 2. 225.00 450.00 131.00 262.00 300.00 600.00 603.34130 30" STEEL END SECTIONS EA 1. 400.00 400.00 379.00 379.00 580.00 580.00 603.34136 36" STEEL END SECTIONS EA 1. 450.00 450.00 491.00 491.00 900.00 900.00 603.34142 42" STEEL END SECTIONS EA 2. 675.00 1,350.00 775.00 1,550.00 1,250.00 2,500.00 603.83124 24" PLASTIC PIPE (CORR. INTERIOR) LF 180. 45.00 8,100.00 38.50 6,930.00 35.00 6,300.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 65. 25.00 1,625.00 36.50 2,372.50 28.00 1,820.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 115. 35.00 4,025.00 64.00 7,360.00 75.00 8,625.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 100. 50.00 5,000.00 80.50 8,050.00 110.00 11,000.00 603.83242 42" PLASTIC PIPE (SMOOTH INTERIOR) LF 90. 65.00 5,850.00 108.00 9,720.00 200.00 18,000.00 604.22 DROP INLETS TYPE B U 1. 1,250.00 1,250.00 1,760.00 1,760.00 1,500.00 1,500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 4,350. 14.00 60,900.00 18.00 78,300.00 18.00 78,300.00 605.79 UNDERDRAIN FLUSHING BASINS EA 16. 400.00 6,400.00 505.00 8,080.00 350.00 5,600.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 675. 16.00 10,800.00 17.00 11,475.00 17.00 11,475.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 4. 2,050.00 8,200.00 2,190.00 8,760.00 2,300.00 9,200.00 608.36 6" REINFORCED SY 250. 40.00 10,000.00 45.00 11,250.00 40.00 10,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 108. 42.00 4,536.00 42.50 4,590.00 40.00 4,320.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8. 22.00 176.00 22.50 180.00 21.00 168.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 618.7 FLAGGERS HR 6,000. 19.50 117,000.00 23.50 141,000.00 20.00 120,000.00 13602A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.1 MAINTENANCE OF TRAFFIC U 1. 30,000.00 30,000.00 35,000.00 35,000.00 60,000.00 60,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 200.00 4,000.00 310.00 6,200.00 500.00 10,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 5.50 66.00 5.60 67.20 5.50 66.00 621.31 SINGLE DELINEATOR WITH POST EA 70. 31.50 2,205.00 33.50 2,345.00 32.00 2,240.00 622.1 STEEL WITNESS MARKERS EA 40. 26.00 1,040.00 25.00 1,000.00 26.00 1,040.00 622.2 CONCRETE BOUNDS EA 10. 275.00 2,750.00 112.00 1,120.00 350.00 3,500.00 628.1 SAWED CONCRETE PAVEMENT LF 25. 20.00 500.00 5.60 140.00 5.50 137.50 628.2 SAWED BITUMINOUS PAVEMENT LF 160. 2.00 320.00 1.70 272.00 2.00 320.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 36,600. .16 5,856.00 .17 6,222.00 .16 5,856.00 641. LOAM CY 250. 25.00 6,250.00 18.50 4,625.00 25.00 6,250.00 645.3 EROSION STONE TON 500. 28.00 14,000.00 21.50 10,750.00 20.00 10,000.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 3,500. 1.60 5,600.00 2.50 8,750.00 1.75 6,125.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 3,500. 1.55 5,425.00 2.10 7,350.00 1.75 6,125.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 750. 3.95 2,962.50 3.70 2,775.00 3.50 2,625.00 645.531 SILT FENCE LF 2,200. 12.00 26,400.00 3.00 6,600.00 3.00 6,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 1,860.00 1,860.00 6,500.00 6,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 192. 100.00 19,200.00 67.50 12,960.00 100.00 19,200.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.7 1,800.00 10,260.00 2,640.00 15,048.00 1,750.00 9,975.00 647.1 HUMUS CY 2,500. 18.00 45,000.00 13.50 33,750.00 10.00 25,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 250.00 750.00 281.00 843.00 160.00 480.00 692. MOBILIZATION U 1. 100,000.00 100,000.00 140,000.00 140,000.00 175,000.00 175,000.00 698.13 FIELD OFFICE TYPE C MON 17. 2,500.00 42,500.00 1,460.00 24,820.00 1,150.00 19,550.00 698.2 PHYSICAL TESTING LABORATORY MON 12. 800.00 9,600.00 710.00 8,520.00 650.00 7,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 $2,341,281.50 $2,374,249.10 $2,399,892.50 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RANDOLPH X-A000(211), 13602A COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JUNE 18, 2009 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: US ROUTE 2 IN RANDOLPH COMPLETION DATE: AUGUST 27, 2010 A A. R. COUTURE CONST. CORP. 1803 RIVERSIDE DR., BERLIN, NH 03570 $ 2,127,113.00 B J.A. MCDONALD, INC. PO BOX 132, LYNDON CENTER, VT 05850 $ 2,181,809.00 C WINTERSET, INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 2,242,081.25 D ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,341,281.50 E PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,374,249.10 E R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,399,892.50 G MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 2,432,772.50 H NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,489,885.00 I F. L. MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,559,962.30 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.5 15,000.00 37,500.00 5,000.00 12,500.00 6,000.00 15,000.00 201.21 REMOVING SMALL TREES EA 10. 150.00 1,500.00 250.00 2,500.00 380.00 3,800.00 202.201 DEMOLISHING BUILDINGS U 1. 7,500.00 7,500.00 10,000.00 10,000.00 5,900.00 5,900.00 202.301 BUILDING ASBESTOS ABATEMENT U 1. 2,500.00 2,500.00 10,000.00 10,000.00 3,240.00 3,240.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 40. 9.00 360.00 10.00 400.00 11.60 464.00 203.1 COMMON EXCAVATION CY 27,500. 7.00 192,500.00 5.00 137,500.00 7.30 200,750.00 203.2 ROCK EXCAVATION CY 2,300. 52.00 119,600.00 50.00 115,000.00 39.00 89,700.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 4. 1,200.00 4,800.00 2,500.00 10,000.00 1,180.00 4,720.00 203.6 EMBANKMENT-IN-PLACE (F) CY 13,000. 3.75 48,750.00 5.00 65,000.00 2.20 28,600.00 206.1 COMMON STRUCTURE EXCAVATION CY 410. 10.00 4,100.00 10.00 4,100.00 44.70 18,327.00 206.2 ROCK STRUCTURE EXCAVATION CY 195. 100.00 19,500.00 80.00 15,600.00 62.00 12,090.00 214. FINE GRADING U 1. 50,000.00 50,000.00 50,000.00 50,000.00 15,700.00 15,700.00 304.1 SAND (F) CY 11,200. 16.00 179,200.00 16.00 179,200.00 18.50 207,200.00 304.2 GRAVEL (F) CY 8,450. 21.00 177,450.00 20.00 169,000.00 22.00 185,900.00 13602A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.3 CRUSHED GRAVEL (F) CY 8,250. 23.00 189,750.00 22.00 181,500.00 29.00 239,250.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 280. 30.00 8,400.00 25.00 7,000.00 34.00 9,520.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 6,800. 77.00 523,600.00 80.00 544,000.00 83.40 567,120.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 130.00 9,100.00 150.00 10,500.00 140.00 9,800.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,500. .25 2,375.00 1.00 9,500.00 .38 3,610.00 417. COLD PLANING BITUMINOUS SURFACES SY 300. 15.00 4,500.00 25.00 7,500.00 16.30 4,890.00 520.1 CONCRETE CLASS A CY 12. 650.00 7,800.00 500.00 6,000.00 435.00 5,220.00 570.4 MORTAR RUBBLE MASONRY (F) CY 35. 450.00 15,750.00 500.00 17,500.00 1,190.00 41,650.00 585.2 STONE FILL, CLASS B CY 80. 30.00 2,400.00 50.00 4,000.00 55.00 4,400.00 585.3 STONE FILL, CLASS C CY 320. 32.00 10,240.00 50.00 16,000.00 55.00 17,600.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 490. 2.50 1,225.00 2.00 980.00 3.20 1,568.00 603.00212 12" R.C. PIPE, 2000D LF 40. 55.00 2,200.00 35.00 1,400.00 26.00 1,040.00 603.00230 30" R.C. PIPE, 2000D LF 265. 75.00 19,875.00 65.00 17,225.00 88.00 23,320.00 603.14442 42" POLYMER COATED CORR. STEEL PIPE .109" THICK LF 100. 105.00 10,500.00 100.00 10,000.00 89.00 8,900.00 603.34112 12" STEEL END SECTIONS EA 4. 650.00 2,600.00 200.00 800.00 210.00 840.00 603.34115 15" STEEL END SECTIONS EA 2. 675.00 1,350.00 250.00 500.00 230.00 460.00 603.34130 30" STEEL END SECTIONS EA 1. 850.00 850.00 500.00 500.00 580.00 580.00 603.34136 36" STEEL END SECTIONS EA 1. 900.00 900.00 600.00 600.00 700.00 700.00 603.34142 42" STEEL END SECTIONS EA 2. 1,100.00 2,200.00 1,000.00 2,000.00 1,170.00 2,340.00 603.83124 24" PLASTIC PIPE (CORR. INTERIOR) LF 180. 50.00 9,000.00 45.00 8,100.00 69.00 12,420.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 65. 45.00 2,925.00 30.00 1,950.00 60.00 3,900.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 115. 55.00 6,325.00 45.00 5,175.00 69.00 7,935.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 100. 70.00 7,000.00 65.00 6,500.00 78.00 7,800.00 603.83242 42" PLASTIC PIPE (SMOOTH INTERIOR) LF 90. 90.00 8,100.00 80.00 7,200.00 99.00 8,910.00 604.22 DROP INLETS TYPE B U 1. 1,350.00 1,350.00 2,000.00 2,000.00 1,740.00 1,740.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 4,350. 18.00 78,300.00 20.00 87,000.00 18.00 78,300.00 605.79 UNDERDRAIN FLUSHING BASINS EA 16. 500.00 8,000.00 500.00 8,000.00 380.00 6,080.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 675. 16.00 10,800.00 16.00 10,800.00 16.00 10,800.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 4. 2,100.00 8,400.00 2,500.00 10,000.00 2,100.00 8,400.00 608.36 6" REINFORCED SY 250. 38.00 9,500.00 50.00 12,500.00 85.00 21,250.00 615.03 TRAFFIC SIGN TYPE C (F) SF 108. 45.00 4,860.00 40.00 4,320.00 41.00 4,428.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8. 25.00 200.00 15.00 120.00 22.00 176.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 618.7 FLAGGERS HR 6,000. 25.00 150,000.00 25.00 150,000.00 27.00 162,000.00 13602A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.1 MAINTENANCE OF TRAFFIC U 1. 72,000.00 72,000.00 75,000.00 75,000.00 41,500.00 41,500.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 330.00 6,600.00 300.00 6,000.00 270.00 5,400.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 5.00 60.00 10.00 120.00 5.40 64.80 621.31 SINGLE DELINEATOR WITH POST EA 70. 30.00 2,100.00 35.00 2,450.00 32.00 2,240.00 622.1 STEEL WITNESS MARKERS EA 40. 25.00 1,000.00 25.00 1,000.00 33.00 1,320.00 622.2 CONCRETE BOUNDS EA 10. 325.00 3,250.00 100.00 1,000.00 108.00 1,080.00 628.1 SAWED CONCRETE PAVEMENT LF 25. 9.00 225.00 5.00 125.00 3.00 75.00 628.2 SAWED BITUMINOUS PAVEMENT LF 160. 5.00 800.00 3.00 480.00 3.00 480.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 36,600. .15 5,490.00 .20 7,320.00 .22 8,052.00 641. LOAM CY 250. 25.00 6,250.00 25.00 6,250.00 19.00 4,750.00 645.3 EROSION STONE TON 500. 40.00 20,000.00 50.00 25,000.00 25.00 12,500.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 3,500. 1.65 5,775.00 2.00 7,000.00 1.80 6,300.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 3,500. 1.65 5,775.00 2.00 7,000.00 1.80 6,300.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 750. 3.25 2,437.50 5.00 3,750.00 2.75 2,062.50 645.531 SILT FENCE LF 2,200. 2.75 6,050.00 3.00 6,600.00 2.50 5,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,500.00 7,500.00 5,000.00 5,000.00 4,400.00 4,400.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 192. 85.00 16,320.00 60.00 11,520.00 120.00 23,040.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.7 1,650.00 9,405.00 2,000.00 11,400.00 1,700.00 9,690.00 647.1 HUMUS CY 2,500. 15.00 37,500.00 20.00 50,000.00 15.80 39,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 200.00 600.00 300.00 900.00 270.00 810.00 692. MOBILIZATION U 1. 45,000.00 45,000.00 100,000.00 100,000.00 91,000.00 91,000.00 698.13 FIELD OFFICE TYPE C MON 17. 1,000.00 17,000.00 2,000.00 34,000.00 1,400.00 23,800.00 698.2 PHYSICAL TESTING LABORATORY MON 12. 500.00 6,000.00 500.00 6,000.00 980.00 11,760.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 $2,432,772.50 $2,489,885.00 $2,559,962.30