THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: DOVER BRF-X-T-2220(001), 13042 COUNTIES AND CODES: STRAFFORD 017 DATE BIDS OPEN: OCTOBER 22, 2009 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: NH ROUTE 9 AND THE EXISTING BRIDGE OVER THE PAN AM RAILWAYS COMPLETION DATE: DECEMBER 2, 2011 A ALVIN J COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 4,193,296.65 B WYMAN & SIMPSON, INC. 910 MAIN STREET, RICHMOND, ME 04357 $ 4,244,767.60 C R.S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 4,334,735.49 D R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,536,636.45 E T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 4,695,922.00 F E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,700,167.23 G CPM CONSTRUCTORS PO BOX B, 30 BONNEY STREET, FREEPORT, ME 04032 $ 4,788,823.83 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .22 114,000.00 25,080.00 35,000.00 7,700.00 25,000.00 5,500.00 201.21 REMOVING SMALL TREES EA 16. 400.00 6,400.00 250.00 4,000.00 300.00 4,800.00 201.22 REMOVING LARGE TREES EA 3. 800.00 2,400.00 500.00 1,500.00 1,200.00 3,600.00 201.32 TREE PRUNING, LARGE TREES EA 2. 1,000.00 2,000.00 500.00 1,000.00 500.00 1,000.00 201.8812 INVASIVE SPECIES CONTROL TYPE I M2 1,575. 2.50 3,937.50 2.00 3,150.00 4.00 6,300.00 201.8822 INVASIVE SPECIES CONTROL TYPE II M2 326. 2.50 815.00 2.50 815.00 4.00 1,304.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 25. 32.80 820.00 70.00 1,750.00 35.00 875.00 202.7 REMOVAL OF GUARDRAIL (F) LM 285. 5.10 1,453.50 7.00 1,995.00 7.55 2,151.75 203.1 COMMON EXCAVATION M3 7,750. 10.00 77,500.00 16.00 124,000.00 8.50 65,875.00 203.321 COMMON EXCAVATION - SOLID WASTE M3 50. 65.00 3,250.00 40.00 2,000.00 8.50 425.00 203.35 HANDLING OF EXCAVATED CONTAMINATED SOILS M3 100. 65.00 6,500.00 40.00 4,000.00 8.50 850.00 203.36 HANDLING/SEGREGATING EXCAVATED SOLID WASTE M3 50. 65.00 3,250.00 52.00 2,600.00 8.50 425.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LM 20. 30.00 600.00 60.00 1,200.00 65.00 1,300.00 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 3. 515.00 1,545.00 800.00 2,400.00 1,150.00 3,450.00 13042 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) M3 7,482. 12.00 89,784.00 11.00 82,302.00 8.50 63,597.00 206.1 COMMON STRUCTURE EXCAVATION M3 25. 50.00 1,250.00 50.00 1,250.00 38.00 950.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 55. 130.00 7,150.00 100.00 5,500.00 75.00 4,125.00 206.2 ROCK STRUCTURE EXCAVATION M3 20. 100.00 2,000.00 130.00 2,600.00 125.00 2,500.00 209.1 GRANULAR BACKFILL M3 75. 30.00 2,250.00 50.00 3,750.00 25.00 1,875.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) M3 1,270. 30.00 38,100.00 60.00 76,200.00 26.00 33,020.00 209.3 GRANULAR BACKFILL (SAND) M3 23. 26.00 598.00 35.00 805.00 20.00 460.00 211.11 VIBRATION MONITORING SERVICES HR 100. 99.75 9,975.00 65.00 6,500.00 75.00 7,500.00 211.12 DEFORMATION MONITORING SERVICES HR 100. 95.00 9,500.00 65.00 6,500.00 45.00 4,500.00 214. FINE GRADING U 1. 35,000.00 35,000.00 30,000.00 30,000.00 28,000.00 28,000.00 304.1 SAND (F) M3 2,685. 26.00 69,810.00 17.00 45,645.00 19.00 51,015.00 304.2 GRAVEL (F) M3 2,569. 26.00 66,794.00 22.00 56,518.00 24.00 61,656.00 304.3 CRUSHED GRAVEL (F) M3 2,517. 30.00 75,510.00 30.00 75,510.00 30.00 75,510.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 210. 32.70 6,867.00 40.00 8,400.00 35.00 7,350.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD T 2,700. 69.30 187,110.00 68.00 183,600.00 64.00 172,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 120. 120.00 14,400.00 125.00 15,000.00 110.00 13,200.00 403.6 PAVEMENT JOINT ADHESIVE LM 1,500. .85 1,275.00 1.00 1,500.00 .80 1,200.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 25 MM BASE COURSE (F) T 43. 170.00 7,310.00 170.00 7,310.00 160.00 6,880.00 403.99 TEMPORARY BITUMINOUS PAVEMENT T 1,750. 69.30 121,275.00 70.00 122,500.00 64.00 112,000.00 417. COLD PLANING BITUMINOUS SURFACES M2 575. 12.55 7,216.25 15.00 8,625.00 11.50 6,612.50 501.1 TEMPORARY BRIDGE U 1. 179,000.00 179,000.00 110,000.00 110,000.00 180,000.00 180,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 135,000.00 135,000.00 75,000.00 75,000.00 135,000.00 135,000.00 503.201 COFFERDAMS U 1. 103,000.00 103,000.00 120,000.00 120,000.00 122,000.00 122,000.00 503.202 COFFERDAMS U 1. 44,100.00 44,100.00 10,000.00 10,000.00 9,000.00 9,000.00 504.1 COMMON BRIDGE EXCAVATION (F) M3 2,900. 20.00 58,000.00 22.00 63,800.00 16.00 46,400.00 504.2 ROCK BRIDGE EXCAVATION M3 525. 65.00 34,125.00 65.00 34,125.00 75.00 39,375.00 508. STRUCTURAL FILL M3 575. 32.00 18,400.00 50.00 28,750.00 35.00 20,125.00 520.01 CONCRETE CLASS AA M3 165. 475.00 78,375.00 635.00 104,775.00 1,172.00 193,380.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) M3 118. 380.00 44,840.00 500.00 59,000.00 590.00 69,620.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 135. 585.00 78,975.00 900.00 121,500.00 680.00 91,800.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) M3 168. 305.00 51,240.00 315.00 52,920.00 415.00 69,720.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION) (F M3 219. 880.00 192,720.00 900.00 197,100.00 1,120.00 245,280.00 13042 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 534.3 WATER REPELLENT (SILANE- SILOXANE) L 310. 27.85 8,633.50 16.00 4,960.00 27.00 8,370.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 5. 65.10 325.50 135.00 675.00 48.00 240.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH MACHINE METHOD (F) M2 715. 20.70 14,800.50 20.00 14,300.00 24.00 17,160.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LM 32.4 26.25 850.50 11.00 356.40 16.00 518.40 544. REINFORCING STEEL (F) KG 31,529. 2.00 63,058.00 2.25 70,940.25 2.54 80,083.66 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 36,706. 2.50 91,765.00 2.25 82,588.50 2.29 84,056.74 544.7 SYNTHETIC FIBER REINFORCEMENT (F) KG 378. 18.25 6,898.50 12.00 4,536.00 13.25 5,008.50 547. SHEAR CONNECTORS (F) EA 3,136. 4.20 13,171.20 3.50 10,976.00 4.00 12,544.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 28. 655.00 18,340.00 800.00 22,400.00 750.00 21,000.00 550.101 STRUCTURAL STEEL (F) KG 57,920. 3.65 211,408.00 3.23 187,081.60 3.80 220,096.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LM 27.6 355.00 9,798.00 400.00 11,040.00 340.00 9,384.00 562.1 SILICONE JOINT SEALANT (F) LM 12. 52.50 630.00 28.00 336.00 33.00 396.00 563.73 BRIDGE RAIL F (3-BAR) (F) LM 28.7 395.00 11,336.50 410.00 11,767.00 479.00 13,747.30 563.731 BRIDGE RAIL F (3-BAR) W/ PROTECTIVE SCREENING (F) LM 76.5 625.00 47,812.50 600.00 45,900.00 676.00 51,714.00 565.73 BRIDGE APPROACH RAIL F (3-BAR) (F) LM 42. 580.00 24,360.00 600.00 25,200.00 600.00 25,200.00 570.4 MORTAR RUBBLE MASONRY (F) M3 4.1 565.00 2,316.50 650.00 2,665.00 560.00 2,296.00 585.2 STONE FILL, CLASS B M3 45. 30.00 1,350.00 40.00 1,800.00 38.00 1,710.00 585.21 STONE FILL, CLASS B (BRIDGE) M3 365. 30.00 10,950.00 35.00 12,775.00 38.00 13,870.00 585.3 STONE FILL, CLASS C M3 50. 30.00 1,500.00 50.00 2,500.00 52.00 2,600.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN M2 2,250. 3.60 8,100.00 2.00 4,500.00 4.00 9,000.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN M2 580. 2.75 1,595.00 3.00 1,740.00 4.50 2,610.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 140. 2.75 385.00 6.00 840.00 4.50 630.00 603.00204 375 MM R.C. PIPE, CLASS III LM 90. 90.00 8,100.00 115.00 10,350.00 125.00 11,250.00 603.00206 600 MM R.C. PIPE, CLASS III LM 20. 210.00 4,200.00 160.00 3,200.00 160.00 3,200.00 603.00304 375 MM R.C. PIPE, CLASS IV LM 30. 90.00 2,700.00 140.00 4,200.00 130.00 3,900.00 603.00306 600 MM R.C. PIPE, CLASS IV LM 55. 210.00 11,550.00 220.00 12,100.00 170.00 9,350.00 603.29903 250 MM STEEL PIPE SLEEVE LM 17. 350.00 5,950.00 220.00 3,740.00 550.00 9,350.00 603.29906 600 MM STEEL PIPE SLEEVE LM 18. 450.00 8,100.00 250.00 4,500.00 52.00 936.00 603.36103 300MM ALUMINIZED STEEL END SECTION EA 4. 225.00 900.00 220.00 880.00 240.00 960.00 13042 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.36104 375MM ALUMINIZED STEEL END SECTION EA 2. 275.00 550.00 250.00 500.00 250.00 500.00 603.36105 450MM ALUMINIZED STEEL END SECTION EA 1. 300.00 300.00 330.00 330.00 300.00 300.00 603.36108 750MM ALUMINIZED STEEL END SECTION EA 4. 525.00 2,100.00 800.00 3,200.00 700.00 2,800.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 30. 65.00 1,950.00 130.00 3,900.00 94.00 2,820.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 225. 70.00 15,750.00 115.00 25,875.00 96.00 21,600.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 190. 78.00 14,820.00 115.00 21,850.00 120.00 22,800.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 4. 105.00 420.00 150.00 600.00 140.00 560.00 604.0007 POLYETHYLENE LINER EA 14. 180.00 2,520.00 220.00 3,080.00 200.00 2,800.00 604.12 CATCH BASINS TYPE B U 11. 2,100.00 23,100.00 2,500.00 27,500.00 2,050.00 22,550.00 604.1218 CATCH BASINS TYPE B, 1.8 M DIA U 2. 2,800.00 5,600.00 3,500.00 7,000.00 3,400.00 6,800.00 604.16 CATCH BASINS TYPE F U 4.5 2,000.00 9,000.00 2,200.00 9,900.00 2,100.00 9,450.00 604.1615 CATCH BASINS TYPE F, 1.5 M DIA U 1.5 2,500.00 3,750.00 2,500.00 3,750.00 3,000.00 4,500.00 604.32 DRAINAGE MANHOLES U 2.5 2,100.00 5,250.00 2,000.00 5,000.00 2,000.00 5,000.00 604.3215 DRAINAGE MANHOLES, 1.5 M DIA U 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,700.00 2,700.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 375. 38.00 14,250.00 50.00 18,750.00 66.00 24,750.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 360.00 360.00 550.00 550.00 350.00 350.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LM 280. 61.30 17,164.00 60.00 16,800.00 52.00 14,560.00 606.1453 BEAM GUARDRAIL (TERMINAL UNIT TYPE FLEAT) U 1. 2,230.00 2,230.00 2,200.00 2,200.00 2,100.00 2,100.00 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT (7.6M)) U 3. 1,810.00 5,430.00 1,800.00 5,400.00 1,700.00 5,100.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 520. 90.00 46,800.00 60.00 31,200.00 65.00 33,800.00 606.93 TEMPORARY BEAM GUARDRAIL LM 325. 61.30 19,922.50 60.00 19,500.00 55.00 17,875.00 606.93455 TEMPORARY BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT - 7.6 METER) U 4. 1,820.00 7,280.00 1,800.00 7,200.00 1,680.00 6,720.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 3. 3,670.00 11,010.00 4,000.00 12,000.00 3,500.00 10,500.00 607.9 RESETTING RAILING AND FENCING LM 250. 37.35 9,337.50 36.00 9,000.00 35.00 8,750.00 607.994 TEMPORARY CHAIN LINK FENCE, 1.2 M HIGH LM 55. 52.50 2,887.50 60.00 3,300.00 52.00 2,860.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 438.5 17.60 7,717.60 20.00 8,770.00 14.50 6,358.25 608.210 100 MM CONCRETE SIDEWALK (F) M2 5. 42.00 210.00 50.00 250.00 60.00 300.00 13042 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.54 DETECTABLE WARNING DEVICES, CAST IRON M2 .5 440.00 220.00 600.00 300.00 350.00 175.00 609.01 STRAIGHT GRANITE CURB LM 575. 53.00 30,475.00 55.00 31,625.00 50.00 28,750.00 609.02 CURVED GRANITE CURB LM 9. 82.40 741.60 80.00 720.00 75.00 675.00 611.05215 150 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 15.24 215.00 3,276.60 200.00 3,048.00 240.00 3,657.60 611.05220 200 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 7.92 215.00 1,702.80 200.00 1,584.00 245.00 1,940.40 611.05225 250 MM CEMENT LINED DUCTILE IRON WATER PIPE, CL. 52 LM 10. 215.00 2,150.00 225.00 2,250.00 250.00 2,500.00 611.05230 300 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 374.29 215.00 80,472.35 165.00 61,757.85 260.00 97,315.40 611.35230 600MM CASING PIPE WITH 300MM DIA. CLASS 52 D.I. M.J. CARRIER PIPE LM 55.47 865.00 47,981.55 650.00 36,055.50 750.00 41,602.50 611.50103 25 MM COPPER WATER PIPE LM 67.06 100.00 6,706.00 100.00 6,706.00 60.00 4,023.60 611.51003 25MM CORPORATION STOP EA 5. 120.00 600.00 175.00 875.00 160.00 800.00 611.51005 50MM CORPORATION STOP EA 1. 150.00 150.00 250.00 250.00 200.00 200.00 611.52030 25MM CURB STOP EA 5. 120.00 600.00 210.00 1,050.00 180.00 900.00 611.70020 200 MM FITTINGS EA 2. 300.00 600.00 425.00 850.00 500.00 1,000.00 611.70025 250 MM FITTINGS EA 4. 350.00 1,400.00 500.00 2,000.00 600.00 2,400.00 611.70030 300 MM FITTINGS EA 21. 400.00 8,400.00 600.00 12,600.00 1,000.00 21,000.00 611.71015 150 MM GATE VALVES EA 2. 750.00 1,500.00 700.00 1,400.00 800.00 1,600.00 611.71020 200 MM GATE VALVES EA 4. 900.00 3,600.00 1,100.00 4,400.00 1,050.00 4,200.00 611.71030 300 MM GATE VALVES EA 4. 1,100.00 4,400.00 1,800.00 7,200.00 1,650.00 6,600.00 611.74 CHLORINE INJECTION TAP EA 4. 500.00 2,000.00 200.00 800.00 160.00 640.00 611.74220 200MM X 200MM TAPPING SLEEVE EA 2. 3,500.00 7,000.00 1,800.00 3,600.00 3,100.00 6,200.00 611.81 HYDRANTS EA 2. 2,800.00 5,600.00 2,500.00 5,000.00 3,100.00 6,200.00 611.814 REMOVING HYDRANTS U 1. 900.00 900.00 500.00 500.00 1,100.00 1,100.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 6. 300.00 1,800.00 150.00 900.00 150.00 900.00 611.95100 WATER MAIN INSULATION M2 53.5 10.00 535.00 125.00 6,687.50 12.00 642.00 615.03 TRAFFIC SIGN TYPE C (F) M2 6.09 525.00 3,197.25 600.00 3,654.00 475.00 2,892.75 615.04 TRAFFIC SIGN TYPE AA (F) M2 .2 210.00 42.00 3,000.00 600.00 100.00 20.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 .37 115.00 42.55 300.00 111.00 272.00 100.64 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 6,750. 22.00 148,500.00 22.00 148,500.00 15.75 106,312.50 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 35,000.00 35,000.00 55,000.00 55,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 30,000.00 60,000.00 12,000.00 24,000.00 14,000.00 28,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 100. 5.25 525.00 5.00 500.00 4.50 450.00 621.31 SINGLE DELINEATOR WITH POST EA 75. 31.50 2,362.50 30.00 2,250.00 25.00 1,875.00 13042 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 622.1 STEEL WITNESS MARKERS EA 17. 26.25 446.25 22.00 374.00 20.00 340.00 622.2 CONCRETE BOUNDS EA 13. 340.00 4,420.00 250.00 3,250.00 225.00 2,925.00 624. RAILROAD PROTECTION U 1. 64,550.00 64,550.00 150,000.00 150,000.00 110,000.00 110,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 160. 10.50 1,680.00 10.00 1,600.00 4.50 720.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 10,000. .35 3,500.00 .50 5,000.00 .42 4,200.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 24. 1.85 44.40 2.00 48.00 4.50 108.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 10. 12.60 126.00 15.00 150.00 18.00 180.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 2,500. 5.10 12,750.00 5.00 12,500.00 1.25 3,125.00 641. LOAM M3 450. 26.00 11,700.00 32.00 14,400.00 28.00 12,600.00 645.3 EROSION STONE T 250. 33.00 8,250.00 35.00 8,750.00 40.00 10,000.00 645.45 PERMANENT CHANNEL STABILIZATION, TYPE A M2 1,100. 3.80 4,180.00 4.00 4,400.00 3.50 3,850.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 10.00 2,000.00 12.00 2,400.00 10.00 2,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 75. 5.35 401.25 3.00 225.00 4.00 300.00 645.531 SILT FENCE LM 1,200. 10.00 12,000.00 11.00 13,200.00 8.00 9,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,940.00 2,940.00 1,800.00 1,800.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 750. 52.50 39,375.00 48.00 36,000.00 45.00 33,750.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS M2 11,750. .40 4,700.00 .40 4,700.00 .42 4,935.00 647.1 HUMUS M3 550. 15.00 8,250.00 40.00 22,000.00 23.00 12,650.00 647.250 HUMUS INTERMIXED 50 MM M3 85. 20.00 1,700.00 50.00 4,250.00 34.00 2,890.00 650.2 LANDSCAPING U 1. 11,700.00 11,700.00 12,000.00 12,000.00 11,000.00 11,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 35,000.00 35,000.00 35,000.00 35,000.00 15,000.00 15,000.00 670.0452 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 95,050.00 95,050.00 90,000.00 90,000.00 85,000.00 85,000.00 670.0453 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 35,000.00 35,000.00 40,000.00 40,000.00 7,500.00 7,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 210.00 840.00 250.00 1,000.00 175.00 700.00 670.101 TEMPORARY LIGHTING U 1. 8,040.00 8,040.00 10,000.00 10,000.00 7,500.00 7,500.00 670.95 TEMPORARY SAFETY FENCE LM 100. 37.80 3,780.00 15.00 1,500.00 14.00 1,400.00 692. MOBILIZATION U 1. 316,000.00 316,000.00 400,000.00 400,000.00 433,000.00 433,000.00 698.13 FIELD OFFICE TYPE C MON 26. 1,500.00 39,000.00 1,100.00 28,600.00 1,450.00 37,700.00 698.2 PHYSICAL TESTING LABORATORY MON 26. 800.00 20,800.00 500.00 13,000.00 650.00 16,900.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 13042 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1009.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 $4,193,296.65 $4,244,767.60 $4,334,735.49 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: DOVER BRF-X-T-2220(001), 13042 COUNTIES AND CODES: STRAFFORD 017 DATE BIDS OPEN: OCTOBER 22, 2009 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: NH ROUTE 9 AND THE EXISTING BRIDGE OVER THE PAN AM RAILWAYS COMPLETION DATE: DECEMBER 2, 2011 A ALVIN J COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 4,193,296.65 B WYMAN & SIMPSON, INC. 910 MAIN STREET, RICHMOND, ME 04357 $ 4,244,767.60 C R.S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 4,334,735.49 D R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,536,636.45 E T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 4,695,922.00 F E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,700,167.23 G CPM CONSTRUCTORS PO BOX B, 30 BONNEY STREET, FREEPORT, ME 04032 $ 4,788,823.83 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .22 12,500.00 2,750.00 31,000.00 6,820.00 20,000.00 4,400.00 201.21 REMOVING SMALL TREES EA 16. 350.00 5,600.00 150.00 2,400.00 20.00 320.00 201.22 REMOVING LARGE TREES EA 3. 800.00 2,400.00 300.00 900.00 785.00 2,355.00 201.32 TREE PRUNING, LARGE TREES EA 2. 1,500.00 3,000.00 500.00 1,000.00 350.00 700.00 201.8812 INVASIVE SPECIES CONTROL TYPE I M2 1,575. 6.00 9,450.00 2.00 3,150.00 .40 630.00 201.8822 INVASIVE SPECIES CONTROL TYPE II M2 326. 6.00 1,956.00 2.50 815.00 1.20 391.20 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 25. 50.00 1,250.00 70.00 1,750.00 35.00 875.00 202.7 REMOVAL OF GUARDRAIL (F) LM 285. 8.50 2,422.50 7.00 1,995.00 6.60 1,881.00 203.1 COMMON EXCAVATION M3 7,750. 6.50 50,375.00 15.00 116,250.00 9.00 69,750.00 203.321 COMMON EXCAVATION - SOLID WASTE M3 50. 80.00 4,000.00 40.00 2,000.00 30.00 1,500.00 203.35 HANDLING OF EXCAVATED CONTAMINATED SOILS M3 100. 80.00 8,000.00 40.00 4,000.00 30.00 3,000.00 203.36 HANDLING/SEGREGATING EXCAVATED SOLID WASTE M3 50. 115.00 5,750.00 52.00 2,600.00 10.00 500.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LM 20. 50.00 1,000.00 60.00 1,200.00 33.50 670.00 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 3. 1,750.00 5,250.00 800.00 2,400.00 300.00 900.00 13042 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) M3 7,482. 12.00 89,784.00 10.00 74,820.00 13.00 97,266.00 206.1 COMMON STRUCTURE EXCAVATION M3 25. 12.00 300.00 47.00 1,175.00 9.00 225.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 55. 12.00 660.00 100.00 5,500.00 60.00 3,300.00 206.2 ROCK STRUCTURE EXCAVATION M3 20. 80.00 1,600.00 130.00 2,600.00 25.00 500.00 209.1 GRANULAR BACKFILL M3 75. 30.00 2,250.00 50.00 3,750.00 39.00 2,925.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) M3 1,270. 30.00 38,100.00 55.00 69,850.00 45.00 57,150.00 209.3 GRANULAR BACKFILL (SAND) M3 23. 35.00 805.00 35.00 805.00 48.00 1,104.00 211.11 VIBRATION MONITORING SERVICES HR 100. 80.00 8,000.00 75.00 7,500.00 65.00 6,500.00 211.12 DEFORMATION MONITORING SERVICES HR 100. 80.00 8,000.00 75.00 7,500.00 50.00 5,000.00 214. FINE GRADING U 1. 15,000.00 15,000.00 50,000.00 50,000.00 37,000.00 37,000.00 304.1 SAND (F) M3 2,685. 20.00 53,700.00 16.00 42,960.00 13.00 34,905.00 304.2 GRAVEL (F) M3 2,569. 26.00 66,794.00 19.00 48,811.00 12.00 30,828.00 304.3 CRUSHED GRAVEL (F) M3 2,517. 30.00 75,510.00 25.00 62,925.00 28.00 70,476.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 210. 35.00 7,350.00 40.00 8,400.00 42.00 8,820.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD T 2,700. 68.00 183,600.00 65.00 175,500.00 66.00 178,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 120. 115.00 13,800.00 120.00 14,400.00 115.00 13,800.00 403.6 PAVEMENT JOINT ADHESIVE LM 1,500. .90 1,350.00 1.00 1,500.00 .82 1,230.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 25 MM BASE COURSE (F) T 43. 175.00 7,525.00 120.00 5,160.00 164.00 7,052.00 403.99 TEMPORARY BITUMINOUS PAVEMENT T 1,750. 68.00 119,000.00 65.00 113,750.00 66.00 115,500.00 417. COLD PLANING BITUMINOUS SURFACES M2 575. 20.00 11,500.00 15.00 8,625.00 11.95 6,871.25 501.1 TEMPORARY BRIDGE U 1. 173,000.00 173,000.00 150,000.00 150,000.00 150,000.00 150,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 60,000.00 60,000.00 200,000.00 200,000.00 100,000.00 100,000.00 503.201 COFFERDAMS U 1. 180,000.00 180,000.00 190,000.00 190,000.00 503.202 COFFERDAMS U 1. 25,000.00 25,000.00 10,000.00 10,000.00 504.1 COMMON BRIDGE EXCAVATION (F) M3 2,900. 10.00 29,000.00 20.00 58,000.00 13.00 37,700.00 504.2 ROCK BRIDGE EXCAVATION M3 525. 100.00 52,500.00 60.00 31,500.00 70.00 36,750.00 508. STRUCTURAL FILL M3 575. 35.00 20,125.00 50.00 28,750.00 40.00 23,000.00 520.01 CONCRETE CLASS AA M3 165. 800.00 132,000.00 850.00 140,250.00 1,200.00 198,000.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) M3 118. 590.00 69,620.00 325.00 38,350.00 400.00 47,200.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 135. 950.00 128,250.00 750.00 101,250.00 900.00 121,500.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) M3 168. 380.00 63,840.00 450.00 75,600.00 600.00 100,800.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION) (F M3 219. 1,000.00 219,000.00 750.00 164,250.00 1,200.00 262,800.00 13042 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 534.3 WATER REPELLENT (SILANE- SILOXANE) L 310. 30.00 9,300.00 25.00 7,750.00 25.00 7,750.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 5. 30.00 150.00 50.00 250.00 100.00 500.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH MACHINE METHOD (F) M2 715. 20.00 14,300.00 24.00 17,160.00 30.00 21,450.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LM 32.4 25.00 810.00 16.00 518.40 20.00 648.00 544. REINFORCING STEEL (F) KG 31,529. 1.80 56,752.20 1.60 50,446.40 2.75 86,704.75 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 36,706. 2.00 73,412.00 1.80 66,070.80 2.75 100,941.50 544.7 SYNTHETIC FIBER REINFORCEMENT (F) KG 378. 25.00 9,450.00 25.00 9,450.00 13.20 4,989.60 547. SHEAR CONNECTORS (F) EA 3,136. 3.25 10,192.00 3.25 10,192.00 4.00 12,544.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 28. 750.00 21,000.00 675.00 18,900.00 1,000.00 28,000.00 550.101 STRUCTURAL STEEL (F) KG 57,920. 3.50 202,720.00 5.00 289,600.00 4.00 231,680.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LM 27.6 360.00 9,936.00 350.00 9,660.00 350.00 9,660.00 562.1 SILICONE JOINT SEALANT (F) LM 12. 85.00 1,020.00 50.00 600.00 65.00 780.00 563.73 BRIDGE RAIL F (3-BAR) (F) LM 28.7 425.00 12,197.50 380.00 10,906.00 500.00 14,350.00 563.731 BRIDGE RAIL F (3-BAR) W/ PROTECTIVE SCREENING (F) LM 76.5 600.00 45,900.00 600.00 45,900.00 750.00 57,375.00 565.73 BRIDGE APPROACH RAIL F (3-BAR) (F) LM 42. 450.00 18,900.00 560.00 23,520.00 551.00 23,142.00 570.4 MORTAR RUBBLE MASONRY (F) M3 4.1 500.00 2,050.00 650.00 2,665.00 640.00 2,624.00 585.2 STONE FILL, CLASS B M3 45. 48.00 2,160.00 40.00 1,800.00 47.50 2,137.50 585.21 STONE FILL, CLASS B (BRIDGE) M3 365. 48.00 17,520.00 36.00 13,140.00 50.00 18,250.00 585.3 STONE FILL, CLASS C M3 50. 48.00 2,400.00 48.00 2,400.00 50.00 2,500.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN M2 2,250. 3.00 6,750.00 2.00 4,500.00 2.00 4,500.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN M2 580. 3.00 1,740.00 3.00 1,740.00 2.50 1,450.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 140. 3.00 420.00 6.00 840.00 3.30 462.00 603.00204 375 MM R.C. PIPE, CLASS III LM 90. 110.00 9,900.00 115.00 10,350.00 115.00 10,350.00 603.00206 600 MM R.C. PIPE, CLASS III LM 20. 200.00 4,000.00 155.00 3,100.00 145.00 2,900.00 603.00304 375 MM R.C. PIPE, CLASS IV LM 30. 112.00 3,360.00 140.00 4,200.00 155.00 4,650.00 603.00306 600 MM R.C. PIPE, CLASS IV LM 55. 210.00 11,550.00 210.00 11,550.00 200.00 11,000.00 603.29903 250 MM STEEL PIPE SLEEVE LM 17. 175.00 2,975.00 650.00 11,050.00 225.00 3,825.00 603.29906 600 MM STEEL PIPE SLEEVE LM 18. 485.00 8,730.00 1,075.00 19,350.00 320.00 5,760.00 603.36103 300MM ALUMINIZED STEEL END SECTION EA 4. 350.00 1,400.00 220.00 880.00 285.00 1,140.00 13042 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.36104 375MM ALUMINIZED STEEL END SECTION EA 2. 380.00 760.00 250.00 500.00 300.00 600.00 603.36105 450MM ALUMINIZED STEEL END SECTION EA 1. 450.00 450.00 325.00 325.00 340.00 340.00 603.36108 750MM ALUMINIZED STEEL END SECTION EA 4. 900.00 3,600.00 800.00 3,200.00 815.00 3,260.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 30. 55.00 1,650.00 120.00 3,600.00 65.00 1,950.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 225. 90.00 20,250.00 115.00 25,875.00 105.00 23,625.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 190. 100.00 19,000.00 115.00 21,850.00 110.00 20,900.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 4. 125.00 500.00 140.00 560.00 165.00 660.00 604.0007 POLYETHYLENE LINER EA 14. 200.00 2,800.00 1,500.00 21,000.00 100.00 1,400.00 604.12 CATCH BASINS TYPE B U 11. 1,600.00 17,600.00 2,050.00 22,550.00 2,400.00 26,400.00 604.1218 CATCH BASINS TYPE B, 1.8 M DIA U 2. 2,600.00 5,200.00 3,100.00 6,200.00 3,950.00 7,900.00 604.16 CATCH BASINS TYPE F U 4.5 1,600.00 7,200.00 2,100.00 9,450.00 2,500.00 11,250.00 604.1615 CATCH BASINS TYPE F, 1.5 M DIA U 1.5 2,500.00 3,750.00 2,400.00 3,600.00 3,455.00 5,182.50 604.32 DRAINAGE MANHOLES U 2.5 2,400.00 6,000.00 1,650.00 4,125.00 2,110.00 5,275.00 604.3215 DRAINAGE MANHOLES, 1.5 M DIA U 1. 3,000.00 3,000.00 2,100.00 2,100.00 2,640.00 2,640.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 375. 45.00 16,875.00 46.00 17,250.00 40.00 15,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 200.00 200.00 550.00 550.00 455.00 455.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LM 280. 60.00 16,800.00 60.00 16,800.00 60.00 16,800.00 606.1453 BEAM GUARDRAIL (TERMINAL UNIT TYPE FLEAT) U 1. 2,250.00 2,250.00 2,200.00 2,200.00 2,200.00 2,200.00 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT (7.6M)) U 3. 1,820.00 5,460.00 1,800.00 5,400.00 1,900.00 5,700.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 520. 75.00 39,000.00 120.00 62,400.00 65.00 33,800.00 606.93 TEMPORARY BEAM GUARDRAIL LM 325. 60.00 19,500.00 60.00 19,500.00 67.50 21,937.50 606.93455 TEMPORARY BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT - 7.6 METER) U 4. 1,800.00 7,200.00 180.00 720.00 2,100.00 8,400.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 3. 3,500.00 10,500.00 4,000.00 12,000.00 1,000.00 3,000.00 607.9 RESETTING RAILING AND FENCING LM 250. 37.00 9,250.00 36.00 9,000.00 25.50 6,375.00 607.994 TEMPORARY CHAIN LINK FENCE, 1.2 M HIGH LM 55. 50.00 2,750.00 51.00 2,805.00 58.90 3,239.50 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 438.5 17.00 7,454.50 18.00 7,893.00 16.75 7,344.88 608.210 100 MM CONCRETE SIDEWALK (F) M2 5. 50.00 250.00 50.00 250.00 100.00 500.00 13042 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.54 DETECTABLE WARNING DEVICES, CAST IRON M2 .5 280.00 140.00 650.00 325.00 500.00 250.00 609.01 STRAIGHT GRANITE CURB LM 575. 70.00 40,250.00 51.00 29,325.00 50.00 28,750.00 609.02 CURVED GRANITE CURB LM 9. 100.00 900.00 79.00 711.00 77.00 693.00 611.05215 150 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 15.24 125.00 1,905.00 180.00 2,743.20 170.00 2,590.80 611.05220 200 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 7.92 150.00 1,188.00 192.00 1,520.64 185.00 1,465.20 611.05225 250 MM CEMENT LINED DUCTILE IRON WATER PIPE, CL. 52 LM 10. 180.00 1,800.00 215.00 2,150.00 200.00 2,000.00 611.05230 300 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 374.29 200.00 74,858.00 165.00 61,757.85 180.00 67,372.20 611.35230 600MM CASING PIPE WITH 300MM DIA. CLASS 52 D.I. M.J. CARRIER PIPE LM 55.47 1,000.00 55,470.00 250.00 13,867.50 350.00 19,414.50 611.50103 25 MM COPPER WATER PIPE LM 67.06 85.00 5,700.10 100.00 6,706.00 90.00 6,035.40 611.51003 25MM CORPORATION STOP EA 5. 425.00 2,125.00 175.00 875.00 110.00 550.00 611.51005 50MM CORPORATION STOP EA 1. 500.00 500.00 250.00 250.00 345.00 345.00 611.52030 25MM CURB STOP EA 5. 425.00 2,125.00 175.00 875.00 75.00 375.00 611.70020 200 MM FITTINGS EA 2. 350.00 700.00 450.00 900.00 1,920.00 3,840.00 611.70025 250 MM FITTINGS EA 4. 400.00 1,600.00 500.00 2,000.00 640.00 2,560.00 611.70030 300 MM FITTINGS EA 21. 500.00 10,500.00 575.00 12,075.00 710.00 14,910.00 611.71015 150 MM GATE VALVES EA 2. 700.00 1,400.00 700.00 1,400.00 890.00 1,780.00 611.71020 200 MM GATE VALVES EA 4. 800.00 3,200.00 1,050.00 4,200.00 1,215.00 4,860.00 611.71030 300 MM GATE VALVES EA 4. 1,500.00 6,000.00 1,800.00 7,200.00 2,120.00 8,480.00 611.74 CHLORINE INJECTION TAP EA 4. 1,000.00 4,000.00 190.00 760.00 160.00 640.00 611.74220 200MM X 200MM TAPPING SLEEVE EA 2. 2,750.00 5,500.00 1,850.00 3,700.00 2,400.00 4,800.00 611.81 HYDRANTS EA 2. 2,700.00 5,400.00 2,500.00 5,000.00 2,900.00 5,800.00 611.814 REMOVING HYDRANTS U 1. 675.00 675.00 500.00 500.00 400.00 400.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 6. 55.00 330.00 150.00 900.00 115.00 690.00 611.95100 WATER MAIN INSULATION M2 53.5 120.00 6,420.00 125.00 6,687.50 11.00 588.50 615.03 TRAFFIC SIGN TYPE C (F) M2 6.09 450.00 2,740.50 600.00 3,654.00 200.00 1,218.00 615.04 TRAFFIC SIGN TYPE AA (F) M2 .2 325.00 65.00 2,600.00 520.00 250.00 50.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 .37 200.00 74.00 300.00 111.00 135.00 49.95 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 6,750. 21.00 141,750.00 20.00 135,000.00 10.00 67,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 140,000.00 140,000.00 65,000.00 65,000.00 75,000.00 75,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 13,500.00 27,000.00 19,000.00 38,000.00 10,000.00 20,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 100. 5.00 500.00 5.00 500.00 5.00 500.00 621.31 SINGLE DELINEATOR WITH POST EA 75. 30.00 2,250.00 30.00 2,250.00 30.00 2,250.00 13042 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 622.1 STEEL WITNESS MARKERS EA 17. 25.00 425.00 23.00 391.00 25.00 425.00 622.2 CONCRETE BOUNDS EA 13. 275.00 3,575.00 236.00 3,068.00 325.00 4,225.00 624. RAILROAD PROTECTION U 1. 310,000.00 310,000.00 45,000.00 45,000.00 200,000.00 200,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 160. 6.50 1,040.00 10.00 1,600.00 3.35 536.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 10,000. .36 3,600.00 .50 5,000.00 .48 4,800.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 24. 1.85 44.40 2.00 48.00 4.75 114.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 10. 12.70 127.00 12.00 120.00 17.75 177.50 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 2,500. 5.00 12,500.00 5.00 12,500.00 1.25 3,125.00 641. LOAM M3 450. 30.00 13,500.00 32.00 14,400.00 45.00 20,250.00 645.3 EROSION STONE T 250. 25.00 6,250.00 33.00 8,250.00 25.00 6,250.00 645.45 PERMANENT CHANNEL STABILIZATION, TYPE A M2 1,100. 3.80 4,180.00 4.00 4,400.00 3.60 3,960.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 8.00 1,600.00 12.00 2,400.00 10.00 2,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 75. 2.25 168.75 3.00 225.00 2.20 165.00 645.531 SILT FENCE LM 1,200. 10.00 12,000.00 10.00 12,000.00 8.85 10,620.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 6,500.00 6,500.00 3,500.00 3,500.00 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 750. 50.00 37,500.00 25.00 18,750.00 50.00 37,500.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS M2 11,750. .50 5,875.00 .50 5,875.00 .38 4,465.00 647.1 HUMUS M3 550. 15.00 8,250.00 38.00 20,900.00 30.00 16,500.00 647.250 HUMUS INTERMIXED 50 MM M3 85. 25.00 2,125.00 47.00 3,995.00 35.00 2,975.00 650.2 LANDSCAPING U 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 40,000.00 40,000.00 150,000.00 150,000.00 50,000.00 50,000.00 670.0452 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 100,000.00 100,000.00 200,000.00 200,000.00 200,000.00 200,000.00 670.0453 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 60,000.00 60,000.00 150,000.00 150,000.00 50,000.00 50,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 250.00 1,000.00 150.00 600.00 150.00 600.00 670.101 TEMPORARY LIGHTING U 1. 10,000.00 10,000.00 10,000.00 10,000.00 25,000.00 25,000.00 670.95 TEMPORARY SAFETY FENCE LM 100. 8.00 800.00 15.00 1,500.00 16.50 1,650.00 692. MOBILIZATION U 1. 300,000.00 300,000.00 549,723.71 549,723.71 460,000.00 460,000.00 698.13 FIELD OFFICE TYPE C MON 26. 1,200.00 31,200.00 850.00 22,100.00 1,300.00 33,800.00 698.2 PHYSICAL TESTING LABORATORY MON 26. 650.00 16,900.00 660.00 17,160.00 300.00 7,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 13042 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1009.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 28,000.00 $4,536,636.45 $4,695,922.00 $4,700,167.23 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: DOVER BRF-X-T-2220(001), 13042 COUNTIES AND CODES: STRAFFORD 017 DATE BIDS OPEN: OCTOBER 22, 2009 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: NH ROUTE 9 AND THE EXISTING BRIDGE OVER THE PAN AM RAILWAYS COMPLETION DATE: DECEMBER 2, 2011 A ALVIN J COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 4,193,296.65 B WYMAN & SIMPSON, INC. 910 MAIN STREET, RICHMOND, ME 04357 $ 4,244,767.60 C R.S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 4,334,735.49 D R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,536,636.45 E T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 4,695,922.00 F E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,700,167.23 G CPM CONSTRUCTORS PO BOX B, 30 BONNEY STREET, FREEPORT, ME 04032 $ 4,788,823.83 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .22 50,000.00 11,000.00 201.21 REMOVING SMALL TREES EA 16. 300.00 4,800.00 201.22 REMOVING LARGE TREES EA 3. 300.00 900.00 201.32 TREE PRUNING, LARGE TREES EA 2. 1,000.00 2,000.00 201.8812 INVASIVE SPECIES CONTROL TYPE I M2 1,575. 2.00 3,150.00 201.8822 INVASIVE SPECIES CONTROL TYPE II M2 326. 3.00 978.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 25. 70.00 1,750.00 202.7 REMOVAL OF GUARDRAIL (F) LM 285. 8.00 2,280.00 203.1 COMMON EXCAVATION M3 7,750. 16.00 124,000.00 203.321 COMMON EXCAVATION - SOLID WASTE M3 50. 40.00 2,000.00 203.35 HANDLING OF EXCAVATED CONTAMINATED SOILS M3 100. 70.00 7,000.00 203.36 HANDLING/SEGREGATING EXCAVATED SOLID WASTE M3 50. 50.00 2,500.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LM 20. 58.00 1,160.00 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 3. 800.00 2,400.00 13042 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) M3 7,482. 10.00 74,820.00 206.1 COMMON STRUCTURE EXCAVATION M3 25. 50.00 1,250.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 55. 100.00 5,500.00 206.2 ROCK STRUCTURE EXCAVATION M3 20. 125.00 2,500.00 209.1 GRANULAR BACKFILL M3 75. 50.00 3,750.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) M3 1,270. 55.00 69,850.00 209.3 GRANULAR BACKFILL (SAND) M3 23. 35.00 805.00 211.11 VIBRATION MONITORING SERVICES HR 100. 65.00 6,500.00 211.12 DEFORMATION MONITORING SERVICES HR 100. 60.00 6,000.00 214. FINE GRADING U 1. 65,000.00 65,000.00 304.1 SAND (F) M3 2,685. 16.00 42,960.00 304.2 GRAVEL (F) M3 2,569. 20.00 51,380.00 304.3 CRUSHED GRAVEL (F) M3 2,517. 25.00 62,925.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 210. 38.00 7,980.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD T 2,700. 70.00 189,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 120. 110.00 13,200.00 403.6 PAVEMENT JOINT ADHESIVE LM 1,500. 1.10 1,650.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 25 MM BASE COURSE (F) T 43. 165.00 7,095.00 403.99 TEMPORARY BITUMINOUS PAVEMENT T 1,750. 70.00 122,500.00 417. COLD PLANING BITUMINOUS SURFACES M2 575. 12.00 6,900.00 501.1 TEMPORARY BRIDGE U 1. 220,000.00 220,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 175,000.00 175,000.00 503.201 COFFERDAMS U 1. 100,000.00 100,000.00 503.202 COFFERDAMS U 1. 100,000.00 100,000.00 504.1 COMMON BRIDGE EXCAVATION (F) M3 2,900. 20.00 58,000.00 504.2 ROCK BRIDGE EXCAVATION M3 525. 80.00 42,000.00 508. STRUCTURAL FILL M3 575. 60.00 34,500.00 520.01 CONCRETE CLASS AA M3 165. 1,000.00 165,000.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) M3 118. 345.00 40,710.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 135. 745.00 100,575.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) M3 168. 363.00 60,984.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION) (F M3 219. 1,200.00 262,800.00 13042 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 534.3 WATER REPELLENT (SILANE- SILOXANE) L 310. 16.00 4,960.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 5. 100.00 500.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH MACHINE METHOD (F) M2 715. 28.00 20,020.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LM 32.4 16.00 518.40 544. REINFORCING STEEL (F) KG 31,529. 2.32 73,147.28 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 36,706. 1.75 64,235.50 544.7 SYNTHETIC FIBER REINFORCEMENT (F) KG 378. 13.00 4,914.00 547. SHEAR CONNECTORS (F) EA 3,136. 3.50 10,976.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 28. 750.00 21,000.00 550.101 STRUCTURAL STEEL (F) KG 57,920. 3.65 211,408.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LM 27.6 350.00 9,660.00 562.1 SILICONE JOINT SEALANT (F) LM 12. 34.00 408.00 563.73 BRIDGE RAIL F (3-BAR) (F) LM 28.7 465.00 13,345.50 563.731 BRIDGE RAIL F (3-BAR) W/ PROTECTIVE SCREENING (F) LM 76.5 648.00 49,572.00 565.73 BRIDGE APPROACH RAIL F (3-BAR) (F) LM 42. 475.00 19,950.00 570.4 MORTAR RUBBLE MASONRY (F) M3 4.1 700.00 2,870.00 585.2 STONE FILL, CLASS B M3 45. 40.00 1,800.00 585.21 STONE FILL, CLASS B (BRIDGE) M3 365. 35.00 12,775.00 585.3 STONE FILL, CLASS C M3 50. 50.00 2,500.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN M2 2,250. 1.50 3,375.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN M2 580. 3.00 1,740.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 140. 6.00 840.00 603.00204 375 MM R.C. PIPE, CLASS III LM 90. 100.00 9,000.00 603.00206 600 MM R.C. PIPE, CLASS III LM 20. 145.00 2,900.00 603.00304 375 MM R.C. PIPE, CLASS IV LM 30. 140.00 4,200.00 603.00306 600 MM R.C. PIPE, CLASS IV LM 55. 200.00 11,000.00 603.29903 250 MM STEEL PIPE SLEEVE LM 17. 300.00 5,100.00 603.29906 600 MM STEEL PIPE SLEEVE LM 18. 400.00 7,200.00 603.36103 300MM ALUMINIZED STEEL END SECTION EA 4. 200.00 800.00 13042 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.36104 375MM ALUMINIZED STEEL END SECTION EA 2. 200.00 400.00 603.36105 450MM ALUMINIZED STEEL END SECTION EA 1. 300.00 300.00 603.36108 750MM ALUMINIZED STEEL END SECTION EA 4. 750.00 3,000.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 30. 100.00 3,000.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 225. 110.00 24,750.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 190. 100.00 19,000.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 4. 140.00 560.00 604.0007 POLYETHYLENE LINER EA 14. 200.00 2,800.00 604.12 CATCH BASINS TYPE B U 11. 2,000.00 22,000.00 604.1218 CATCH BASINS TYPE B, 1.8 M DIA U 2. 3,000.00 6,000.00 604.16 CATCH BASINS TYPE F U 4.5 2,000.00 9,000.00 604.1615 CATCH BASINS TYPE F, 1.5 M DIA U 1.5 2,500.00 3,750.00 604.32 DRAINAGE MANHOLES U 2.5 2,000.00 5,000.00 604.3215 DRAINAGE MANHOLES, 1.5 M DIA U 1. 2,000.00 2,000.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 375. 50.00 18,750.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 540.00 540.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LM 280. 60.00 16,800.00 606.1453 BEAM GUARDRAIL (TERMINAL UNIT TYPE FLEAT) U 1. 2,200.00 2,200.00 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT (7.6M)) U 3. 1,800.00 5,400.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 520. 70.00 36,400.00 606.93 TEMPORARY BEAM GUARDRAIL LM 325. 60.00 19,500.00 606.93455 TEMPORARY BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT - 7.6 METER) U 4. 1,800.00 7,200.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 3. 5,000.00 15,000.00 607.9 RESETTING RAILING AND FENCING LM 250. 36.00 9,000.00 607.994 TEMPORARY CHAIN LINK FENCE, 1.2 M HIGH LM 55. 51.00 2,805.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 438.5 15.00 6,577.50 608.210 100 MM CONCRETE SIDEWALK (F) M2 5. 600.00 3,000.00 13042 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.54 DETECTABLE WARNING DEVICES, CAST IRON M2 .5 2,000.00 1,000.00 609.01 STRAIGHT GRANITE CURB LM 575. 65.00 37,375.00 609.02 CURVED GRANITE CURB LM 9. 100.00 900.00 611.05215 150 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 15.24 180.00 2,743.20 611.05220 200 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 7.92 200.00 1,584.00 611.05225 250 MM CEMENT LINED DUCTILE IRON WATER PIPE, CL. 52 LM 10. 210.00 2,100.00 611.05230 300 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 374.29 165.00 61,757.85 611.35230 600MM CASING PIPE WITH 300MM DIA. CLASS 52 D.I. M.J. CARRIER PIPE LM 55.47 720.00 39,938.40 611.50103 25 MM COPPER WATER PIPE LM 67.06 95.00 6,370.70 611.51003 25MM CORPORATION STOP EA 5. 150.00 750.00 611.51005 50MM CORPORATION STOP EA 1. 220.00 220.00 611.52030 25MM CURB STOP EA 5. 200.00 1,000.00 611.70020 200 MM FITTINGS EA 2. 410.00 820.00 611.70025 250 MM FITTINGS EA 4. 500.00 2,000.00 611.70030 300 MM FITTINGS EA 21. 600.00 12,600.00 611.71015 150 MM GATE VALVES EA 2. 700.00 1,400.00 611.71020 200 MM GATE VALVES EA 4. 1,000.00 4,000.00 611.71030 300 MM GATE VALVES EA 4. 1,700.00 6,800.00 611.74 CHLORINE INJECTION TAP EA 4. 200.00 800.00 611.74220 200MM X 200MM TAPPING SLEEVE EA 2. 1,800.00 3,600.00 611.81 HYDRANTS EA 2. 2,400.00 4,800.00 611.814 REMOVING HYDRANTS U 1. 500.00 500.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 6. 135.00 810.00 611.95100 WATER MAIN INSULATION M2 53.5 123.00 6,580.50 615.03 TRAFFIC SIGN TYPE C (F) M2 6.09 400.00 2,436.00 615.04 TRAFFIC SIGN TYPE AA (F) M2 .2 500.00 100.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 .37 500.00 185.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 618.7 FLAGGERS HR 6,750. 21.00 141,750.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 100. 5.00 500.00 621.31 SINGLE DELINEATOR WITH POST EA 75. 29.00 2,175.00 13042 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 622.1 STEEL WITNESS MARKERS EA 17. 22.00 374.00 622.2 CONCRETE BOUNDS EA 13. 336.00 4,368.00 624. RAILROAD PROTECTION U 1. 125,000.00 125,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 160. 10.00 1,600.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 10,000. .35 3,500.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 24. 1.75 42.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 10. 12.00 120.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 2,500. 5.00 12,500.00 641. LOAM M3 450. 32.00 14,400.00 645.3 EROSION STONE T 250. 30.00 7,500.00 645.45 PERMANENT CHANNEL STABILIZATION, TYPE A M2 1,100. 3.60 3,960.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 15.00 3,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 75. 3.00 225.00 645.531 SILT FENCE LM 1,200. 10.00 12,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 750. 25.00 18,750.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS M2 11,750. .38 4,465.00 647.1 HUMUS M3 550. 40.00 22,000.00 647.250 HUMUS INTERMIXED 50 MM M3 85. 45.00 3,825.00 650.2 LANDSCAPING U 1. 12,000.00 12,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 90,000.00 90,000.00 670.0452 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 125,000.00 125,000.00 670.0453 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 50,000.00 50,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 300.00 1,200.00 670.101 TEMPORARY LIGHTING U 1. 10,000.00 10,000.00 670.95 TEMPORARY SAFETY FENCE LM 100. 18.00 1,800.00 692. MOBILIZATION U 1. 455,000.00 455,000.00 698.13 FIELD OFFICE TYPE C MON 26. 1,000.00 26,000.00 698.2 PHYSICAL TESTING LABORATORY MON 26. 600.00 15,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 13042 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 3,000.00 3,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 5,000.00 5,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 3,000.00 3,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 30,000.00 30,000.00 1009.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 4,000.00 4,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 28,000.00 28,000.00 $4,788,823.83 -----------------------