Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

New Hampshire Department of Transportation Road and Bridge and Public Works construction project bid opening results are listed below. Click the Project Name to access bid results. Files are in *.txt or *.pdf format.
Printing Bid Results: You may need to configure your browser (View > Text Size > Smaller) to accommodate printing these documents.

2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004

Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Alstead 14541-K X-A000(479) April 10, 2008 NH 12A & NH 123, Replace bridge over Cold River (2005 floods)
Bartlett 14372   May 29, 2008 US 302, Remove bypassed steel truss bridge over Rocky Branch River
Bedford 13692-A X-A000(297) March 13, 2008 NH 101, Intersection improvements at Hardy/Jenkins
Bedford-Manchester-Londonderry 11512-O X-A000(757) 11512-O Demoliton of 2 properties on US 3
Bow 14938   April 3, 2008 I-93 guardrail replacement and drainage work
Campton 14888   March 6, 2008 Bridge painting, over the Pemigewasset River and W. Branch Brook bridges
Canterbury-Northfield 15381 X-A000(726) June 18, 2008 I-93, Pavement rehabilitation between Exits 18 & 19
Concord 15275   January 31, 2008 Roadway rehabilitation on Hazen Drive from Loudon Rd. to East Side Drive
Concord 15379   September 11, 2008 Emergency repairs to F E Everett Turnpike & I-93 bridge
Concord 15389 X-A000(729) October 23, 2008 I-93 & I-393, Replace three aluminum sign structures
Derry-Manchester 14567-J   February 7, 2008 Underground storage tank removal and replacement
Durham 14889 X-A000(751) December 11, 2008 Bridge painting, Br. No. 114/128 Bagdad Road over US Route 4
Farmington-Middleton 15329   April 10, 2008 NH 153, Chip seal a 5 mile section
Hampton 14188 X-A000(229) May 8, 2008 NH 1A, rehab the bridge over Hampton River
Hampton 14915 X-A000(752) December 18, 2008 NH 101, Maintenance bridge painting over Tide Mill Creek
Hancock 13778   April 24, 2008 NH 137, Rehabilitate bridge over Moose Brook
Henniker-Hopkinton 15278 X-A000(669) April 24, 2008 US 202 & NH 9, Rehab roadway & bridges
Hinsdale 14540-N X-A000(426) May 29, 2008 Reconstruction & realignment of Rte. 63 due to 2005 floods
Hollis 15310   May 29, 2008 Hollis Depot Road, Reconstruction & replacement of box culvert
Hopkinton 13799   June 19, 2008 NH127, Rehabilitate bridge over spillway channel
Hooksett 14885   April 17, 2008 I-93, Replace aluminum sign structures
Hopkinton-New London 14511 X-A000(474) January 31, 2008 Road and bridge rehabilitation on I-89 from Exit 7 to 8 and Exit 9 to 11
Hudson 10625S   June 26, 2008 Contaminated material removal, former Benson's site
Keene-Surry 13338 STP-X-000S(387) January 30, 2008 NH12, roadway improvements & pavement rehabilitation
Lisbon-Bartlett 15344-B   May 1, 2008 Replace piping from fuel distribution USTS @ patrol facilities
Lisbon 14464   June 18, 2008 US 302, Bridge rehabilitation over the Ammonoosuc River
Londonderry 13015   May 8, 2008 NH 128, Intersection improvements at Mammoth Road, Litchfield Road, Stonehedge Road & Bartley Hill Road
Loudon-Belmont 14462 & 14263 X-A000(398) May 8, 2008 NH 106, Pavement rehabilitation and roadway work
Manchester-Bedford 14607 X-A000(464) January 30, 2008 Pavement rehabilitation on I-93, I-293 & NH 101
Manchester 14170 X-A000(220) 14170 Replace the two bridges carrying Island Pond Road over I-93 NB & SB
Meredith-New Hampton & Center Harbor-New Hampton 15436 & 15438   August 15, 2008 Emergency road repairs to Winona Road and Waukenwan Road
Merrimack-Manchester 14945   May 6, 2008 F.E. Everett Turnpike resurfacing
Merrimack 12105   August 26, 2008 Bridge rehabilitation & safety work on the F.E. Everett Turnpike NB & SB
Milford-Swanzey 14567K   February 14, 2008 Fuel tank removal and replacement
Milford 14513   February 28, 2008 NH 101, Replace span wire signal
Pembroke, Concord-Laconia & Loudon-Belmont 14477-C, 10672-K & 14462A X-A000(734) August 7, 2008 Building demolition
Pittsfield 15461   September 23, 2008 NH 107, Demolish old patrol shed
Pittsburg-Northumberland-Milan 15344-A   May 1, 2008 Replace piping from fuel distribution UTS @ patrol facilities
Portsmouth, NH-Kittery, ME 13678 BHF-T-0101(015) October 9, 2008 US 1, Rehabilitate the Memorial Bridge over the Piscataqua River
Resurfacing District 1 15267   February 26, 2008 Counties of Coos, Carroll & Grafton
Resurfacing Distict 2 15268   February 28, 2008 Counties of Grafton, Merrimack & Sullivan
Resurfacing District 3 15269   February 28, 2008 Counties of Belknap and Carroll
Resurfacing District 4 15270   February 26, 2008 Counties of Cheshire & Hillsboro
Resurfacing District 5 15271   March 6, 2008 Counties of Hillsborough, Merrimack and Rockingham
Resurfacing District 6 15272   March 4, 2008 Counties of Strafford & Rockingham
Rochester 10620-K   December 9, 2008 Spaulding Turnpike, Exits 11 & 12 (NH 125), widening and bridge replacement
Rye 13269 MGS-BRF-X-T-0221(010) September 11, 2008 NH 1A, Replace wooden bridge over Seavey's Creek
Salem to Manchester 14633-E A000(503) May 15, 2008 I-93, Exit 5 area, Reconstruct SB & NB ramps
Salem to Manchester 13933-K A000(131) August 28, 2008 I-93, Exit 3 area sb off-ramp & NB bridges over NH 111 & NH 111A
Seabrook-Rochester 14946   March 4, 2008 Eastern turnpike resurfacing
Statewide Native Wildflowers 13763-A   February 7, 2008 Wild flower establishment @ various locations
Statewide lilac establishment 13763-B   February 7, 2008 Lilac establishment @ various locations
Statewide 14501   February 14, 2008 Traffic sign removal and replacement
Statewide SBG-33-01   March 27, 2008 Pavement maintenance at Dillant-Hopkins airport and Boire Field
Statewide Bridge Piles 14802   March 27, 2008 Repair of deteriorated bridge piles at various locations
Statewide 15305   June 12, 2008 Guradrail replacement on I-93 and the F.E. Everett Turnpike
Statewide 15367   June 12, 2008 Guardrail repair due to damage, FY 2009 & 2010
Statewide Crack Seal 15295 X-A000(682) June 19, 2008 Crack sealing roadways @ various locations
Statewide 15358 X-A000(714) July 10, 2008 Milled rumble strips @ various locations
Tamworth-Thornton 14567-M   February 21, 2008 Fuel tank removal and replacement
Thornton-Woodstock 15380 X-A000(725) June 18, 2008 I-93, Microsurfacing between Exits 29 & 30
Wakefield 14871   April 17, 2008 NH 16, Intersection improvements
Walpole 14540U   February 14, 2008 Bridge replacement, NH 123 over the Cold River
Warner-Alton-Pittsfield 14567L   February 14, 2008 Fuel tank removal and replacement
Whitefield P2953 HP-STP-F-X-0351(008) September 25, 2008 US 3, Reconstruct from Carroll Townline north 2.1 miles
Windham 13113 STP-TE-X-000S(343) September 18, 2008 Shoulder construction on Lowell Road
Windham-Salem 10075K X-A000(408) December 18, 2008 NH 111, Landscaping
2008 PUBLIC WORKS PROJECT BID RESULTS
Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Allenstown 80384-C   June 19, 2008 Construct Dred warehouse & office building @ Bear Brook State Park
Bedford 80248R-E   July 17, 2008 Construct district 5 office building and troop station
Benton 80364-B   April 24, 2008 Floor abatement & replacement @Glencliff Home
Boscawen 80356R-B   August 28, 2008 NH Veterans cemetary additions & improvements
Claremont 80374-A   May 29, 2008 New roof @ Monadnock Mill, 13-17 Water Street
Claremont 80110B   June 5, 2008 Monadnock Mills foundation repair
Claremont 80338   June 12, 2008 Repointing & repair @ Monadnock Mill, 17 Water Street
Claremont (Re-adv) 80338-A   September 18, 2008 Repointing & repair @ Monadnock Mill, 17 Water Street
Concord 80371-A   January 24, 2008 Roof repairs @ Hugh J. Gallen State Office Park South
Concord 80221-B   January 30, 2008 Sprinkler upgrade @ NH Hospital
Concord 80229-B   March 20, 2008 Construct Health & Academic building @ NH Tech
Concord 80353-B   May 6, 2008 UPS upgrades for computer rooms @ Dept. of Safety
Concord 80194D   June 26, 2008 State library windows & roofing replacement
Concord 80381R-B   July 24, 2008 Renovate parking area and fence replacement @ State Military Reservation
Concord 80393-B   August 7, 2008 Chiller replacement @ Hayes Building, 33 Hazen Drive
Concord 80379-A   September 23, 2008 Roof and gutter repairs @ the LOB
Concord 80363-A   October 9, 2008 Main building asbestos & lead paint abatement, 105 Pleasant street
Concord 80357-B   December 4, 2008 Renovations to residential treatment center @ NH State Prison
Conway 80247R-B   May 8, 2008 Construct Highway Maintenance building
Conway 80297-C   May 29, 2008 Construct science lab classroom @ Technology Village
Hampton 80345-A   March 4, 2008 North beach seawall repair
Hampton 80360-A   June 12, 2008 Partial reconstruction & paving of parking lot
Hampton 80432-A   September 18, 2008 Design/build sanitary sewer extension @ liquor store #76, I-93 northbound
Laconia 80226-E   March 13, 2008 Building renovations & HVAC upgrade
Laconia 80366-E   July 24, 2008 Sanitary sewer storm water drainage systems repairs @ 1 Right Way Path
Laconia 80366D   August 21, 2008 Water system upgrade at One Right Way Path
Littleton 80329R-A   July 24, 2008 Renovations & addition to facility maintenance shop, 350 Meadow Street
Manchester 80380R-B   May 22, 2008 Stair reconstruction @ armory bldg, 1059 Canal Street
Manchester 80377-B   October 2, 2008 Demolition of Saunders & East Cottages @ YDC
Manchester & Concord 80413R-A   May 22, 2008 Design/Build air conditioning @ Manchester Armory & State House Annex
Merrimack 80405-B   November 13, 2008 Construct 24,000 sq courthouse on Mcelwain Street
Milford 80324-B   May 15, 2008 Latrine update @ Milford Mationall Guard Armory
Sargent's Purchase 80344-A   April 17, 2008 Low bid Design/Build wastewater treatment facility @ Mt. Washington State Park
Statewide 80348B   February 14, 2008 NH State Prison Boiler & Chiller replacement
Statewide 80249R-C   March 13, 2008 Construct salt storage buildings
Statewide 80340-B   May 8, 2008 Parking lot reconstruction @ state parks
Statewide 80382-R   May 15, 2008 Remove UST & instal AST
Statewide 80355-B   August 14, 2008 Design/build sprinkler system @ Dept. of Safety
Statewide 80421R-C   August 14, 2008 Building renovations @ 4 facilities for the NH army national guard
Statewide 80412R-B   December 18, 2008 Fire alarm & auxiliary power for Readiness Centers
Tilton 80388R-B   December 11, 2008 Interior finishes & facility enhancements, NH Veterans Home
Tilton 80389R-B   December 11, 2008 Home energy enhancements, NH Veterans Home
West Springfield 80343-B   April 4, 2008 New Hampshire building renovations @ Eastern States Exposition Center