THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT V 15271 COUNTIES AND CODES: HILLSBOROUGH 011 MERRIMACK 013 ROCKINGHAM 015 DATE BIDS OPEN: MARCH 6, 2008 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 22, 2008 A CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 1,832,112.50 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,943,777.50 C BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,181,050.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 15,250. 1.00 15,250.00 14.75 224,937.50 18.00 274,500.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 150. 75.00 11,250.00 62.00 9,300.00 75.00 11,250.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 60. 90.00 5,400.00 90.00 5,400.00 110.00 6,600.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,250. 54.00 67,500.00 55.20 69,000.00 60.00 75,000.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 26,450. 58.25 1,540,712.50 55.20 1,460,040.00 60.00 1,587,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 7,000. 3.00 21,000.00 3.00 21,000.00 8.00 56,000.00 616.606 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X6 FT EA 2. 300.00 600.00 300.00 600.00 300.00 600.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 700.00 2,100.00 650.00 1,950.00 600.00 1,800.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 950. 22.00 20,900.00 21.00 19,950.00 22.00 20,900.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 300.00 2,400.00 300.00 2,400.00 300.00 2,400.00 692. MOBILIZATION U 1. 65,000.00 65,000.00 49,200.00 49,200.00 65,000.00 65,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 $1,832,112.50 $1,943,777.50 $2,181,050.00