THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT II 15268 AND ENFIELD 13185B COUNTIES AND CODES: GRAFTON 009 MERRIMACK 013 SULLIVAN 019 DATE BIDS OPEN: FEBRUARY 28, 2008 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 12, 2008 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,787,265.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 214. FINE GRADING U 1. 50,000.00 50,000.00 214.122 FINE GRADING EXISTING DITCHES LF 1,950. 6.50 12,675.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 70. 51.50 3,605.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE 12" DEEP (F) SY 24,100. 1.30 31,330.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 3,100. 17.50 54,250.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 4,900. 64.95 318,255.00 403.6 PAVEMENT JOINT ADHESIVE LF 3,450. .50 1,725.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 150. 69.00 10,350.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 15,100. 64.95 980,745.00 417. COLD PLANING BITUMINOUS SURFACES SY 35,500. 2.70 95,850.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 3. 450.00 1,350.00 618.7 FLAGGERS HR 1,400. 22.00 30,800.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 350.00 4,200.00 628.2 SAWED BITUMINOUS PAVEMENT LF 50. 1.60 80.00 645.2 MATTING FOR EROSION CONTROL SY 1,000. 3.80 3,800.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 6. 100.00 600.00 15268 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 1,000. .75 750.00 647.1 HUMUS CY 100. 69.00 6,900.00 692. MOBILIZATION U 1. 115,000.00 115,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 $1,787,265.00