THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HOOKSETT 14885 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: APRIL 17, 2008 SCOPE OF WORK: TRAFFIC SIGN REMOVAL AND REPLACEMENT LOCATION: I-93 AND F. E. EVERETT TURNPIKE COMPLETION DATE: OCTOBER 30, 2009 A LIDDELL BROTHERS, INC. 600 INDUSTRIAL DRIVE, HALIFAX, MA 02338 $ 249,701.50 B ROADSAFE TRAFFIC SYSTEMS, INC. 55 BODWELL STREET, AVON, MA 02322 $ 294,363.00 C VISI-FLASH RENTALS EASTERN INC. 31 PLEASANT ST., WEST BRIDGEWATER, MA 02379 $ 336,467.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 1,000. 6.00 6,000.00 2.40 2,400.00 3.20 3,200.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 3. 2,500.00 7,500.00 2,100.00 6,300.00 1,700.00 5,100.00 206.1 COMMON STRUCTURE EXCAVATION CY 270. 45.00 12,150.00 50.00 13,500.00 116.00 31,320.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 100.00 2,000.00 110.00 2,200.00 84.00 1,680.00 206.2 ROCK STRUCTURE EXCAVATION CY 15. 100.00 1,500.00 175.00 2,625.00 57.00 855.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 20,000.00 20,000.00 40,000.00 40,000.00 26,000.00 26,000.00 508. STRUCTURAL FILL CY 28. 50.00 1,400.00 60.00 1,680.00 29.00 812.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 85. 280.00 23,800.00 275.00 23,375.00 430.00 36,550.00 544.1 REINFORCING STEEL (ROADWAY) LB 6,600. 1.50 9,900.00 1.00 6,600.00 .68 4,488.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 762.5 20.00 15,250.00 19.20 14,640.00 26.00 19,825.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 3. 3,500.00 10,500.00 2,340.00 7,020.00 2,925.00 8,775.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 750.00 1,500.00 660.00 1,320.00 685.00 1,370.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 916.5 15.00 13,747.50 17.00 15,580.50 15.00 13,747.50 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 44,000.00 44,000.00 52,600.00 52,600.00 52,000.00 52,000.00 615.10301 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 3,500.00 3,500.00 4,000.00 4,000.00 6,500.00 6,500.00 615.10302 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 3,500.00 3,500.00 4,000.00 4,000.00 6,500.00 6,500.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 30,000.00 30,000.00 38,000.00 38,000.00 37,000.00 37,000.00 14885 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,900.00 8,900.00 9,000.00 9,000.00 11,300.00 11,300.00 615.30002 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 12,000.00 12,000.00 615.303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN U 1. 1,000.00 1,000.00 500.00 500.00 2,300.00 2,300.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 10,500.00 10,500.00 10,500.00 10,500.00 10,500.00 10,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 2,000.00 2,000.00 10,000.00 10,000.00 4,500.00 4,500.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 4. 1.00 4.00 100.00 400.00 300.00 1,200.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 10. 10.00 100.00 6.00 60.00 6.00 60.00 621.31 SINGLE DELINEATOR WITH POST EA 10. 40.00 400.00 30.00 300.00 17.00 170.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 305. 10.00 3,050.00 2.50 762.50 63.00 19,215.00 692. MOBILIZATION U 1. 3,000.00 3,000.00 12,500.00 12,500.00 14,000.00 14,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1008.31 ALTERATIONS AND ADDITIONS AS NEEDED - DRAINAGE ADJUSTMENTS $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1008.4 ALTERATIONS AND ADDITIONS AS NEEDED - UTILITY ADJUSTMENTS $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 $249,701.50 $294,363.00 $336,467.50