THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: LOUDON-BELMONT X-A000(398), 14462 & BELMONT 14263 COUNTIES AND CODES: MERRIMACK 013 BELKNAP 001 DATE BIDS OPEN: MAY 8, 2008 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH 106 IN LOUDON AND PERKINS ROAD IN BELMONT COMPLETION DATE: SEPTEMBER 11, 2009 A WEAVER BROS. CONST. CO, INC. PO BOX 1326, CONCORD, NH 03301 $ 4,412,163.25 B CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 4,560,104.64 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 4,581,471.20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 435. 8.75 3,806.25 12.00 5,220.00 8.70 3,784.50 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 5. 275.00 1,375.00 300.00 1,500.00 325.00 1,625.00 202.7 REMOVAL OF GUARDRAIL (F) LF 790. 2.15 1,698.50 2.00 1,580.00 2.50 1,975.00 203.1 COMMON EXCAVATION CY 5,650. 6.40 36,160.00 8.00 45,200.00 9.00 50,850.00 203.2 ROCK EXCAVATION CY 75. 45.00 3,375.00 75.00 5,625.00 32.00 2,400.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 2. 1,200.00 2,400.00 1,200.00 2,400.00 1,030.00 2,060.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 1,000.00 2,000.00 900.00 1,800.00 690.00 1,380.00 203.5596 GUARDRAIL E-2 PLATFORM LF 425. 17.00 7,225.00 12.00 5,100.00 9.50 4,037.50 203.601 EMBANKMENT-IN-PLACE CY 4,050. 8.30 33,615.00 8.00 32,400.00 3.80 15,390.00 203.92 ROCK SCALING, MACHINE METHOD HR 30. 250.00 7,500.00 300.00 9,000.00 360.00 10,800.00 206.1 COMMON STRUCTURE EXCAVATION CY 3,200. 7.50 24,000.00 16.00 51,200.00 16.50 52,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 250. 10.00 2,500.00 30.00 7,500.00 40.00 10,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 549. 80.00 43,920.00 150.00 82,350.00 77.50 42,547.50 209.1 GRANULAR BACKFILL CY 75. 30.00 2,250.00 20.00 1,500.00 96.50 7,237.50 209.4 GRANULAR BACKFILL (GRAV) CY 1,450. 13.00 18,850.00 20.00 29,000.00 19.50 28,275.00 214. FINE GRADING U 1. 40,000.00 40,000.00 25,000.00 25,000.00 45,000.00 45,000.00 304.1 SAND (F) CY 1,700. 12.10 20,570.00 16.00 27,200.00 22.00 37,400.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 3,008. 14.50 43,616.00 20.00 60,160.00 22.00 66,176.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 445. 25.00 11,125.00 22.00 9,790.00 52.00 23,140.00 14462 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.401 CRUSHED STONE (FINE GRADATION) CY 1,850. 20.50 37,925.00 26.00 48,100.00 27.50 50,875.00 304.501 CRUSHED STONE (COURSE GRADATION) CY 925. 20.50 18,962.50 26.00 24,050.00 28.50 26,362.50 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 28,335. 62.00 1,756,770.00 61.50 1,742,602.50 62.50 1,770,937.50 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 305. 105.00 32,025.00 100.00 30,500.00 90.00 27,450.00 403.6 PAVEMENT JOINT ADHESIVE LF 140,300. .22 30,866.00 .50 70,150.00 .22 30,866.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 150. 65.00 9,750.00 65.00 9,750.00 79.00 11,850.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,750. 63.00 110,250.00 62.00 108,500.00 65.00 113,750.00 413.1 HOT-POURED CRACK SEALANT LB 4,600. 1.75 8,050.00 1.75 8,050.00 1.65 7,590.00 417. COLD PLANING BITUMINOUS SURFACES SY 79,256. 1.85 146,623.60 1.90 150,586.40 1.75 138,698.00 520.1 CONCRETE CLASS A CY 24. 1,000.00 24,000.00 500.00 12,000.00 625.00 15,000.00 544.1 REINFORCING STEEL (ROADWAY) LB 370. 5.00 1,850.00 3.00 1,110.00 3.35 1,239.50 585.2 STONE FILL, CLASS B CY 140. 35.00 4,900.00 30.00 4,200.00 38.75 5,425.00 585.3 STONE FILL, CLASS C CY 160. 35.00 5,600.00 32.00 5,120.00 44.00 7,040.00 593.231 GEOTEXTILE; SEPARATION CL.3, NON-WOVEN SY 210. 2.75 577.50 3.00 630.00 2.80 588.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 400. 2.80 1,120.00 3.00 1,200.00 3.10 1,240.00 603.00212 12" R.C. PIPE, 2000D LF 195. 30.00 5,850.00 30.00 5,850.00 34.00 6,630.00 603.00215 15" R.C. PIPE, 2000D LF 1,190. 32.30 38,437.00 32.00 38,080.00 43.50 51,765.00 603.00218 18" R.C. PIPE, 2000D LF 950. 37.00 35,150.00 36.00 34,200.00 45.50 43,225.00 603.00224 24" R.C. PIPE, 2000D LF 250. 55.00 13,750.00 42.00 10,500.00 62.50 15,625.00 603.00230 30" R.C. PIPE, 2000D LF 20. 75.00 1,500.00 60.00 1,200.00 102.00 2,040.00 603.30115 15" R.C. END SECTIONS EA 2. 730.00 1,460.00 450.00 900.00 825.00 1,650.00 603.34112 12" STEEL END SECTIONS EA 1. 145.00 145.00 250.00 250.00 105.00 105.00 603.34115 15" STEEL END SECTIONS EA 2. 200.00 400.00 300.00 600.00 115.00 230.00 603.34118 18" STEEL END SECTIONS EA 2. 250.00 500.00 350.00 700.00 205.00 410.00 603.44012 12" CORRUGATED POLY PIPE FOR SLOPE DRAIN LF 125. 21.00 2,625.00 32.00 4,000.00 24.25 3,031.25 603.83115 15" PLASTIC PIPE (CORR. INTERIOR) LF 60. 25.00 1,500.00 36.00 2,160.00 23.50 1,410.00 603.86924 24" O.D. SOLID WALL POLY PIPE LINER FOR EXISTING PIPE 30" DIAMETER LF 144. 300.00 43,200.00 300.00 43,200.00 235.00 33,840.00 603.86954 54" O.D. SOLID WALL POLY PIPE LINER FOR EXISTING PIPE 60" DIAMETER LF 94. 820.00 77,080.00 825.00 77,550.00 710.00 66,740.00 603.8699 CONTROLLED DENSITY FILLED CONCRETE CY 24. 500.00 12,000.00 500.00 12,000.00 325.00 7,800.00 604.0007 POLYETHYLENE LINER EA 36. 240.00 8,640.00 125.00 4,500.00 185.00 6,660.00 604.12 CATCH BASINS TYPE B U 6. 1,725.00 10,350.00 2,000.00 12,000.00 1,600.00 9,600.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 2. 2,500.00 5,000.00 3,000.00 6,000.00 2,180.00 4,360.00 14462 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.15 CATCH BASINS TYPE E U 8. 1,885.00 15,080.00 1,800.00 14,400.00 2,100.00 16,800.00 604.16 CATCH BASINS TYPE F U 20. 1,785.00 35,700.00 1,600.00 32,000.00 1,800.00 36,000.00 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 1.3 2,600.00 3,380.00 2,800.00 3,640.00 2,960.00 3,848.00 604.22 DROP INLETS TYPE B U 1. 1,350.00 1,350.00 2,000.00 2,000.00 1,610.00 1,610.00 604.242 DROP INLETS TYPE D-B U 3. 1,020.00 3,060.00 1,000.00 3,000.00 1,500.00 4,500.00 604.26 DROP INLETS TYPE F U 3. 1,425.00 4,275.00 1,800.00 5,400.00 1,850.00 5,550.00 604.32 DRAINAGE MANHOLES U 1.5 1,800.00 2,700.00 2,000.00 3,000.00 1,840.00 2,760.00 604.327 DRAINAGE MANHOLES, 7-FOOT U 1.5 6,000.00 9,000.00 7,500.00 11,250.00 4,440.00 6,660.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 12. 350.00 4,200.00 350.00 4,200.00 215.00 2,580.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 9. 350.00 3,150.00 350.00 3,150.00 225.00 2,025.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 4,600. 16.25 74,750.00 16.00 73,600.00 17.00 78,200.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 1,350. 23.00 31,050.00 18.00 24,300.00 22.00 29,700.00 605.82251 24" AGGREGATE UND. TYPE 2 WITH 6" POLYETHYLENE PIPE LF 2,675. 31.00 82,925.00 35.00 93,625.00 24.00 64,200.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 500. 8.75 4,375.00 8.00 4,000.00 8.00 4,000.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 75. 55.00 4,125.00 50.00 3,750.00 50.00 3,750.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 75. 11.00 825.00 12.00 900.00 10.00 750.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 725. 17.50 12,687.50 17.00 12,325.00 16.65 12,071.25 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 10. 2,100.00 21,000.00 2,000.00 20,000.00 1,985.00 19,850.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 1,900.00 7,600.00 1,800.00 7,200.00 1,750.00 7,000.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 575.00 575.00 600.00 600.00 550.00 550.00 606.1496 BEAM GUARDRAIL (TERMINAL UNIT TYPE E-2) LF 604. 27.00 16,308.00 30.00 18,120.00 25.00 15,100.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 600. 16.00 9,600.00 20.00 12,000.00 42.00 25,200.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 3. 5,000.00 15,000.00 22,000.00 66,000.00 5,500.00 16,500.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 550. 12.00 6,600.00 15.00 8,250.00 15.00 8,250.00 608.24 4" CONCRETE SIDEWALK (F) SY 35. 40.00 1,400.00 50.00 1,750.00 89.00 3,115.00 608.26 6" CONCRETE SIDEWALK (F) SY 77. 45.00 3,465.00 60.00 4,620.00 56.50 4,350.50 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 4. 475.00 1,900.00 600.00 2,400.00 305.00 1,220.00 14462 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.01 STRAIGHT GRANITE CURB LF 1,150. 16.25 18,687.50 16.00 18,400.00 20.00 23,000.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 1,342. 14.15 18,989.30 13.50 18,117.00 17.50 23,485.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 70. 14.00 980.00 20.00 1,400.00 16.50 1,155.00 609.236 CURVED GRANITE SLOPE CURB 6" HIGH LF 15. 60.00 900.00 54.00 810.00 60.00 900.00 609.5 RESET GRANITE CURB LF 110. 7.50 825.00 6.50 715.00 9.75 1,072.50 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 725. 5.50 3,987.50 4.00 2,900.00 6.60 4,785.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 104. 70.00 7,280.00 65.00 6,760.00 105.00 10,920.00 611.05210 10" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 88. 80.00 7,040.00 85.00 7,480.00 132.00 11,616.00 611.50003 3/4" SERVICE CONNECTION LF 50. 40.00 2,000.00 50.00 2,500.00 94.50 4,725.00 611.70008 8" FITTING EA 15. 450.00 6,750.00 250.00 3,750.00 447.00 6,705.00 611.70010 10" FITTING EA 15. 500.00 7,500.00 300.00 4,500.00 500.00 7,500.00 611.71008 8" GATE VALVE EA 2. 1,100.00 2,200.00 1,200.00 2,400.00 1,070.00 2,140.00 611.71010 10" GATE VALVE EA 1. 1,500.00 1,500.00 2,000.00 2,000.00 1,550.00 1,550.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 1,400.00 1,400.00 2,000.00 2,000.00 1,940.00 1,940.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 13. 100.00 1,300.00 140.00 1,820.00 130.00 1,690.00 611.951 WATER MAIN INSULATION SY 28.44 15.00 426.60 10.00 284.40 20.00 568.80 614.331 3" STEEL CONDUIT LF 72. 18.00 1,296.00 20.00 1,440.00 17.00 1,224.00 614.511 CONCRETE PULL BOX 14" EA 15. 310.00 4,650.00 300.00 4,500.00 290.00 4,350.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 325.00 1,300.00 400.00 1,600.00 300.00 1,200.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 1,275. 8.00 10,200.00 8.00 10,200.00 7.50 9,562.50 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 410. 17.00 6,970.00 16.00 6,560.00 16.00 6,560.00 615.02 TRAFFIC SIGN TYPE B (F) SF 36.82 55.00 2,025.10 52.00 1,914.64 52.00 1,914.64 615.03 TRAFFIC SIGN TYPE C (F) SF 635.25 32.00 20,328.00 30.00 19,057.50 29.00 18,422.25 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 5. 150.00 750.00 150.00 750.00 135.00 675.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 15.32 20.00 306.40 20.00 306.40 18.00 275.76 615.06 TRAFFIC SIGN TYPE CC (F) SF 32.5 13.00 422.50 20.00 650.00 12.00 390.00 616.101 TRAFFIC SIGNALS U 1. 100,000.00 100,000.00 95,000.00 95,000.00 95,000.00 95,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 14,000.00 14,000.00 12,000.00 12,000.00 12,000.00 12,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 4,300. 21.50 92,450.00 24.00 103,200.00 22.00 94,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 125,000.00 125,000.00 75,000.00 75,000.00 170,000.00 170,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 10,000.00 20,000.00 9,000.00 18,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 16. 400.00 6,400.00 300.00 4,800.00 250.00 4,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 2,000.00 4,000.00 1,500.00 3,000.00 900.00 1,800.00 14462 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 60. 5.00 300.00 5.00 300.00 4.00 240.00 621.31 SINGLE DELINEATOR WITH POST EA 445. 26.00 11,570.00 30.00 13,350.00 28.00 12,460.00 622.1 STEEL WITNESS MARKERS EA 13. 25.00 325.00 28.00 364.00 25.00 325.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 2. 750.00 1,500.00 700.00 1,400.00 700.00 1,400.00 625.52 LIGHT POLE (HIGHWAY) U 2. 2,200.00 4,400.00 2,000.00 4,000.00 2,000.00 4,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,440. 2.35 8,084.00 2.00 6,880.00 1.00 3,440.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 484,150. .11 53,256.50 .10 48,415.00 .10 48,415.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 240. .17 40.80 .12 28.80 .25 60.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 110. 1.35 148.50 .50 55.00 .50 55.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 300. 1.65 495.00 3.00 900.00 1.75 525.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 240. .70 168.00 .50 120.00 .25 60.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 310. .90 279.00 1.00 310.00 .85 263.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 445. 2.30 1,023.50 3.00 1,335.00 2.50 1,112.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 977. 3.85 3,761.45 5.00 4,885.00 3.25 3,175.25 641. LOAM CY 810. 18.25 14,782.50 20.00 16,200.00 39.00 31,590.00 645.3 EROSION STONE TON 250. 28.00 7,000.00 35.00 8,750.00 38.50 9,625.00 645.531 SILT FENCE LF 4,200. 2.50 10,500.00 2.50 10,500.00 2.70 11,340.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,500.00 3,500.00 3,500.00 3,500.00 11,000.00 11,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 60.00 6,000.00 60.00 6,000.00 100.00 10,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.02 1,650.00 8,283.00 1,550.00 7,781.00 1,550.00 7,781.00 647.1 HUMUS CY 1,617. 15.25 24,659.25 16.00 25,872.00 31.00 50,127.00 692. MOBILIZATION U 1. 253,000.00 253,000.00 279,000.00 279,000.00 215,000.00 215,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.13 FIELD OFFICE TYPE C MON 16. 1,700.00 27,200.00 1,500.00 24,000.00 1,100.00 17,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 1008.4 ALTERATIONS AND ADDITIONS AS NEEDED - UTILITY ADJUSTMENTS $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 14462 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 87,500.00 87,500.00 87,500.00 87,500.00 87,500.00 87,500.00 $4,412,163.25 $4,560,104.64 $4,581,471.20