Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

New Hampshire Department of Transportation Road and Bridge and Public Works construction project bid opening results are listed below. Click the Project Name to access bid results. Files are in *.txt or *.pdf format.
Printing Bid Results: You may need to configure your browser (View > Text Size > Smaller) to accommodate printing these documents.

2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004

Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Alstead 14541-I X-A000(472) April 12, 2007 Reconstruction & re-aligning of Rte 123
Alstead 14541J X-A000(473) June 28, 2007 Roadway and bridge reconstruction NH 123
Alton 13802 X-A000(480) October 11, 2007 NH 28, Replace bridge & approach work over Merrymeeting River
Ashland-Bridgewater 14272 X-A000(267) October 11, 2007 US 3, Bridge painting over Pemigewasset River
Bedford-Manchester-Londonderry 11512-A A000(253) May 17, 2007 Airport access road and bridge construction over Merrimack River
Bedford-Manchester-Londonderry 11512-C A000(254) June 7, 2007 Airport access road, Construct FE Everett Turnpike bridge
Bedford-Manchester-Londonderry-Merrimack 11512-D A000(255) December 13, 2007 Airport access road, construct bridge over Cohas Brook
Bethlehem-Harts Location 13855 X-A000(060) December 20, 2007 US 302/NH 1-, Guardrail replacement
Bow to Hopkinton 14609 X-A000(466) February 8, 2007 I-89, Pavement and bridge rehabilitation
Canterbury 14719   March 8, 2007 West Road, Slope stabilization from May 2006 floods
Chichester 13922   March 29, 2007 Intersectiion improvements, US4/US202/NH9
Concord 14880   September 13, 2007 Contaminated materials and ground water work
Conway 14455-A X-A000(524) May 31, 2007 Building demolitions in Madison and North Conway
Dover 14287 X-A000(280) July 12, 2007 Indian Brook Drive, Construct park'n'ride facility
Enfield 13185-D X-A000(527) April 5, 2007 NH 4A, Rehabilitate pavement, widening & drainage
Enfield-Sunapee 14567-D   April 19, 2007 Construct new vehicle fueling facilities
Epping-Hampton 14799 X-A000(533) April 19, 2007 Pavement rehabilitation on NH Route 101
Farmington-Rochester 14575 X-A000(448) March 9, 2007 NH 11, Pavement rehabilitation and road improvements
Francestown 14810   January 25, 2007 NH 47, double chip seal
Gilford 14359   February 28, 2007 US 3 bypass, replace existing signal system at NH 11
Hampton 14807   January 25, 2007 NH1A, micro-surfacing
Hampton-Rochester 14521   February 27, 2007 Eastern Turnpike resurfacing
Haverhill, NH - Newbury, VT 14335 X-A000(582) October 10, 2007 Newbury Road, Bridge rehabilitation over the Connecticut River
Hooksett 14695   June 14, 2007 NH 3A, Drainage repairs due to May 2006 floods
Hooksett-Rindge 14567-E   May 3, 2007 Construct new vehicle facilities
Hudson-Londonderry 13337 STP-X-000S(386) March 9, 2007 NH 102, Pavement rehabilitation and road improvements
Keene-Swanzey-Hinsdale 10309Q&14540X X-A000(525) & X-A000(622) June 28, 2007 Building demolition
Laconia 13895 X-A000(096) June 7, 2007 Sidewalk construction on US 3 & NH 11B
Lebanon 14566   May 3, 2007 Rehabilitation of the railroad bridge over the Connecticut River
Lebanon 14532-B   May 24, 2007 Bridge Street, Excavate and stockpile petroleum contaminated soil
Lebanon (readvertisement) 14566   September 6, 2007 Rehabilitation of the railroad bridge over the Connecticut River
Loudon 14614   May 1, 2007 NH 106/Nh 129, Replace existing signal System
Nashua-Merrimack-Hooksett 14520   February 28, 2007 Central Turnpike resurfacing
North Haverhill-Wentworth 14567F   April 5, 2007 Construct new vehicle fueling facility
Ossipee 14434 X-A000(383) April 19, 2007 NH 16, Roadway rehabilitation and guardrail work
Pinkhams Grant 14564 X-A000(437) March 28, 2007 Construct pedestrian footbridge over Ellis River
Plaistow 13803 X-A000(037) March 28, 2007 NH 125, Widening for center turn lanes
Plaistow 10044-D X-A000(377) April 12, 2007 NH 125, Roadway widening and signalization
Portsmouth 13862&13863   April 26, 2007 Bridge painting, I-95/Spauling Turnpike
Portsmouth-Hampton-Hooksett 14503   February 15, 2007 Blue Star & F.E. Everett Turnpike, replacement of overhead sign structures
Portsmouth 14847   October 10, 2007 I-95, Bridge rehabilitation over railroad
Portsmouth-Kittery 13678-C A000(664) October 18, 2007 US 1, Emergency replacement of counterweight ropes on Memorial Bridge
Resurfacing District 1 14761   2/27, 2007 Counties of Coos, Carroll & Grafton
Resurfacing District 2 14762   February 28, 2007 Counties of Grafton, Merrimack & Sullivan
Resurfacing District 3 14763   March 39, 2007 Counties of Belknap, Grafton & Merrimack
Resurfacing District 4 14764   February 27, 2007 Counties of Cheshire, Hillsboro & Sullivan
Resurfacing District 5 14765   March 1, 2007 Counties of Hillsborough, Merrimack & Rockingham
Resurfacing District 6 14766   March 1, 2007 Counties of Merrimack, Rockingham & Strafford
Rochester   3-33-0015-21-2007 April 26, 2007 Skyhaven Airport, construct, mark and light taxiway A
Rochester 10620-G   November 15, 2007 Spauling Turnpike, Construction of Exit 11 & 12 (NH 125)
Rochester-Claremont   3-33-3300-04-2007 April 26, 2007 Statewide crack sealing airports
Rye 12595   March 28, 2007 NH 1A, reconstruct Foyes Corner
Salem-Manchester 13933C A000(123) July 19, 2007 Bridge replacement, Exit 1 SB on/off ramp bridges over I-93
Salem to Manchester 10418-G A000(325) February 15, 2007 I-93 Park & Ride at Exit 2 and bus station facility
Statewide 14780 X-A000(517) March 1, 2007 Install debris netting under bridge decks
Statewide 14795 X-A000(531) March 9, 2007 Crack seal on various state highways
Statewide 14801 X-A000(534) March 15, 2007 Crack sealing on I-93
Statewide 14801-A X-A000(584) March 22, 2007 I-93, Crack sealingfrom Plymouth to the Vermont border
Statewide 14253 X-A000(259) March 29, 2007 Replace aluminum sign structures
Statewide 14873 X-A000(583) May 31, 2007 Replace and add new edgeline & centerline rumble strips
Statewide 14887   June 14, 2007 Construct mile markers on NHS system for emergency response
Statewide 14499   June 21, 2007 Statewide guardrail replacement
Walpole 14541-L   May 31, 2007 NH 123, Repair to sheetpile wall installed in Drewsville
Walpole 14540-U   July 12, 2007 NH 123, Replace bridge over Cold River
Warner 14610 X-A000(467) February 1, 2007 I-89, Pavement preservation Exit 8 to north of Exit 9
Warner 14774   May 31, 2007 Pumpkin Hill Road, slope stabilization
Warren 13209 X-A000(526) October 18, 2007 NH 25, Reconstruction from Benton T/L to 2 miles south
2008 PUBLIC WORKS PROJECT BID RESULTS
Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Benton 80224-B   September 27, 2007 New kitchen @ Glencliff Home for the Elderly
Brentwood 80307-A   June 14, 2007 Replace metal clad wall panels @ courthouse
Center Strafford and Concord 80332R-B   August 23, 2007 Replacing two boilers at State Armories
Claremont 80110B   April 26, 2007 Monadnock Mills foundation repair
Concord 80195   January 11, 2007 Replace fire alarms & sprinkler addition @ State Library
Concord 80194-B   January 18, 2007 Replace State House roof membrane
Concord 80221-A   January 18, 2007 Sprinkler system flushing @ NH Hospital
Concord 80238R-B   January 22, 2007 Fire house addition @ Fire Training Academy
Concord 80222   February 1, 2007 Electrical upgrade @ State Office Park South
Concord 80206   February 22, 2007 Upgrade energy management system
Concord 80210-B   March 8, 2007 Replace chiller @ LOB
Concord 80225C   March 16, 2007 NHTI, Strout Hall Heating Renovation
Concord 80239R-B   March 22, 2007 Construct DMV storage building
Concord 80298-A   March 28, 2007 NH Hospital tunnel repairs
Concord 80225-B   April 5, 2007 Design/Build waterline extension @ NH Tech
Concord 80290R-B   April 6, 2007 Drainage reconstruction at the Concord District Court
Concord 80300R-B   April 12, 2007 Renovations & additions to Little Hall dining services @ NH Tech
Concord 80289B   April 26, 2007 Walkway improvements, Brown Building
Concord 80212A   April 26, 2007 Design/Build M & S Office Building renovations
Concord 80217   May 9, 2007 Design/Build trace metal clean room
Concord 80205   May 10, 2007 Replace defective windows, 101 Pleasant Street
Concord 80243R   May 10, 2007 Safety radio building expansion
Concord 80346   August 30, 2007 Reroofing MCN/MCS building @ NH State Prison
Concord 97839C   September 13, 2007 Alan B. Shepard Discovery Center addition to Christa McAuliffe Planetarium
Concord 80354-A   December 20, 2007 HVAC enhancements @ State Lab
Concord-Laconia-Manchester 80215A   March 8, 2007 Design/build sprinkler systems
Franconia 80246R-B   May 10, 2007 Patrol shed renovations
Laconia 80200B   April 6, 2007 Addition & renovations to Laconia District Court
Laconia 80226C   April 12, 2007 Roof replacement, NH Community Tech. College
Laconia 80270R-A   June 14, 2007 Construct Lake Winnisquam boat access facility
Londonderry 10418-N X-A000(264) July 19, 2007 I-93, Exit 5 bus maintenance facility and terminal
Manchester 80304   March 15, 2007 Reroofing Midway House/Division of Juvenile Justice
Milford 80241R-B   May 10, 2007 Milford motor vehicle substation addition
New Durham 80125R-F   March 15, 2007 Waterline improvements @ Powdermill Fish Hatchery
Nottingham 80294R-B   April 12, 2007 Bath House construction, Pawtuckaway State Park
Ossipee 80301-A   January 11, 2007 Install generator @ Carroll County courthouse
Rochester 80328R   May 3, 2007 Repairs to Hanger 3 @ Skyhaven Airport
Statewide 80299R   May 16, 2007 Install air conditioning @ NH Hospital
Statewide 80240R-B   April 5, 2007 Fire alarm installation for Division of Motor Vehicles
Statewide 80323B   May 24, 2007 Replacement of boilers and kitchen exhaust hood State Armories
Statewide 80269R-A   June 28, 2007 Replace old generator & transer switch at tollbooths and maintenance sheds
Statewide 80318R-D   July 26, 2007 HVAC renovations at rest areas, Statewide
Swanzey 80245R-B   May 9, 2007 Office and maintenance garage renovations & additions
Tilton 80254-R-B   February 8, 2007 Renovation to NH Veteran's Home
Tilton 80138R-L   July 19, 2007 Structural repairs & interior renovations, 139 Winter Street