THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPPING-HAMPTON X-A000(533), 14799 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 19, 2007 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 101 EAST OF THE LAMPREY RIVER COMPLETION DATE: SEPTEMBER 28, 2007 A BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 5,803,845.00 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 5,863,785.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 50,000. 54.00 2,700,000.00 52.00 2,600,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 535,500. .22 117,810.00 .21 112,455.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 7,000. 65.00 455,000.00 60.00 420,000.00 415.8 PAVEMENT REINFORCEMENT MESH SY 221,000. 4.50 994,500.00 4.50 994,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 555,000. 1.10 610,500.00 1.35 749,250.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 28,000.00 28,000.00 30,000.00 30,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 125,000.00 125,000.00 125,000.00 125,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 207,300.00 207,300.00 139,000.00 139,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 4,000.00 8,000.00 7,700.00 15,400.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 5. 200.00 1,000.00 300.00 1,500.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,500.00 3,000.00 300.00 600.00 628.2 SAWED BITUMINOUS PAVEMENT LF 850. 1.00 850.00 2.00 1,700.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 800,000. .10 80,000.00 .11 88,000.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 19,500. .18 3,510.00 .19 3,705.00 632.3116 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 16" LINE LF 75. 5.00 375.00 5.00 375.00 632.93 REMOVE RAISED PAVEMENT MARKINGS EA 200. 15.00 3,000.00 5.00 1,000.00 692. MOBILIZATION U 1. 170,000.00 170,000.00 300,000.00 300,000.00 14799 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 698.13 FIELD OFFICE TYPE C MON 7. 3,000.00 21,000.00 900.00 6,300.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 145,000.00 145,000.00 145,000.00 145,000.00 $5,803,845.00 $5,863,785.00