THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT III 14763 COUNTIES AND CODES: BELKNAP 001 GRAFTON 009 MERRIMACK 013 DATE BIDS OPEN: MARCH 29, 2007 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 14, 2007 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,338,746.30 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,597,438.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 2,770. 62.20 172,294.00 63.00 174,510.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 44. 290.00 12,760.00 310.00 13,640.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 250. 63.15 15,787.50 63.00 15,750.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 29,950. 57.60 1,725,120.00 63.00 1,886,850.00 411.43 PLANT MIX SURFACE TREAT- MENT (ASPHALT CEMENT), 3/8 INCH TON 950. 65.00 61,750.00 70.00 66,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 9,100. 7.10 64,610.00 14.00 127,400.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 776. 49.80 38,644.80 58.00 45,008.00 618.7 FLAGGERS HR 1,860. 23.00 42,780.00 23.00 42,780.00 692. MOBILIZATION U 1. 135,000.00 135,000.00 155,000.00 155,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 $2,338,746.30 $2,597,438.00