THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WALPOLE 14541L COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: MAY 31, 2007 SCOPE OF WORK: SLOPE STABILIZATION LOCATION: NH 123 (WHITCOMB ROAD) AND NORHT OF OLD CHESTER TURNPIKE INTERSECTION COMPLETION DATE: OCTOBER 5, 2007 A FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 198,425.00 B MILLER CONSTRUCTION, INC. PO BOX 86, WINDSOR, VT 05089 $ 260,025.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 9. 300.00 2,700.00 250.00 2,250.00 545.1 MOBILIZATION FOR TIE-BACKS U 1. 12,000.00 12,000.00 7,200.00 7,200.00 545.2 TIE-BACKS FOR SHEET PILE WALL EA 8. 7,875.00 63,000.00 10,655.00 85,240.00 545.3 WALERS & SHIMS U 1. 15,000.00 15,000.00 25,000.00 25,000.00 603.00215 15" R.C. PIPE, 2000D LF 77. 105.00 8,085.00 70.00 5,390.00 603.30115 15" R.C. END SECTIONS EA 2. 650.00 1,300.00 900.00 1,800.00 604.12 CATCH BASINS TYPE B U 2. 2,500.00 5,000.00 2,300.00 4,600.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 950.00 950.00 1,500.00 1,500.00 605.82452 36" AGGREGRATE UNDERDRAIN TYPE 2, W/12" PERF COOR POLY PIPE LF 167. 75.00 12,525.00 75.00 12,525.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 23.00 5,175.00 22.00 4,950.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 2,000.00 4,000.00 1,900.00 3,800.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 618.7 FLAGGERS HR 80. 28.00 2,240.00 26.00 2,080.00 619.1 MAINTENANCE OF TRAFFIC U 1. 17,500.00 17,500.00 30,000.00 30,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,500.00 5,000.00 7,000.00 14,000.00 622.2 CONCRETE BOUNDS EA 2. 350.00 700.00 370.00 740.00 645.3 EROSION STONE TON 10. 50.00 500.00 70.00 700.00 645.531 SILT FENCE LF 250. 3.00 750.00 3.00 750.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 3,500.00 3,500.00 14541L PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 40. 25.00 1,000.00 100.00 4,000.00 692. MOBILIZATION U 1. 9,500.00 9,500.00 20,000.00 20,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $198,425.00 $260,025.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: WALPOLE 14541L COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: MAY 31, 2007 SCOPE OF WORK: SLOPE STABILIZATION LOCATION: NH 123 (WHITCOMB ROAD) AND NORHT OF OLD CHESTER TURNPIKE INTERSECTION COMPLETION DATE: OCTOBER 5, 2007 A FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 198,425.00 B MILLER CONSTRUCTION, INC. PO BOX 86, WINDSOR, VT 05089 $ 260,025.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 9. 300.00 2,700.00 150.00 1,350.00 1,350.00 545.1 MOBILIZATION FOR TIE-BACKS U 1. 12,000.00 12,000.00 15,000.00 15,000.00 -3,000.00 545.2 TIE-BACKS FOR SHEET PILE WALL EA 8. 7,875.00 63,000.00 3,000.00 24,000.00 39,000.00 545.3 WALERS & SHIMS U 1. 15,000.00 15,000.00 1,250.00 1,250.00 13,750.00 603.00215 15" R.C. PIPE, 2000D LF 77. 105.00 8,085.00 70.00 5,390.00 2,695.00 603.30115 15" R.C. END SECTIONS EA 2. 650.00 1,300.00 650.00 1,300.00 604.12 CATCH BASINS TYPE B U 2. 2,500.00 5,000.00 2,500.00 5,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 950.00 950.00 600.00 600.00 350.00 605.82452 36" AGGREGRATE UNDERDRAIN TYPE 2, W/12" PERF COOR POLY PIPE LF 167. 75.00 12,525.00 50.00 8,350.00 4,175.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 23.00 5,175.00 20.00 4,500.00 675.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 2,000.00 4,000.00 2,000.00 4,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 618.7 FLAGGERS HR 80. 28.00 2,240.00 20.00 1,600.00 640.00 619.1 MAINTENANCE OF TRAFFIC U 1. 17,500.00 17,500.00 17,500.00 17,500.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,500.00 5,000.00 10,000.00 20,000.00 -15,000.00 622.2 CONCRETE BOUNDS EA 2. 350.00 700.00 300.00 600.00 100.00 645.3 EROSION STONE TON 10. 50.00 500.00 35.00 350.00 150.00 645.531 SILT FENCE LF 250. 3.00 750.00 5.00 1,250.00 -500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 2,500.00 2,500.00 -1,000.00 14541L PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 40. 25.00 1,000.00 50.00 2,000.00 -1,000.00 692. MOBILIZATION U 1. 9,500.00 9,500.00 25,000.00 25,000.00 -15,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $198,425.00 $171,540.00 26,885.00