THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPTON-ROCHESTER 14521 COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: FEBRUARY 27, 2007 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 14, 2007 A BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,578,584.00 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,623,391.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 4. 100.00 400.00 95.00 380.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,600. 18.00 28,800.00 17.50 28,000.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 19,500. 57.00 1,111,500.00 55.95 1,091,025.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 110.00 5,500.00 105.00 5,250.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,000. 57.00 57,000.00 59.95 59,950.00 417. COLD PLANING BITUMINOUS SURFACES SY 54,500. 1.80 98,100.00 2.18 118,810.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 17. 250.00 4,250.00 325.00 5,525.00 608.26 6" CONCRETE SIDEWALK (F) SY 25. 150.00 3,750.00 58.00 1,450.00 609.5 RESET GRANITE CURB LF 80. 40.00 3,200.00 20.00 1,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 23,000.00 23,000.00 37,000.00 37,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 6,000.00 12,000.00 3,500.00 7,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 11,200. .11 1,232.00 .11 1,232.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 102,900. .13 13,377.00 .11 11,319.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 5,500. 1.25 6,875.00 1.50 8,250.00 692. MOBILIZATION U 1. 33,000.00 33,000.00 70,000.00 70,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 14521 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 56,600.00 56,600.00 56,600.00 56,600.00 $1,578,584.00 $1,623,391.00