THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH-HAMPTON-HOOKSETT 14503 COUNTIES AND CODES: ROCKINGHAM 015 MERRIMACK 013 DATE BIDS OPEN: FEBRUARY 15, 2007 SCOPE OF WORK: SIGN REPLACEMENT LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: NOVEMBER 30, 2007 A NES TRAFFIC SAFETY, L.P. 55 BODWELL ST., AVON, MA 02322 $ 924,642.45 B VISI-FLASH RENTALS EASTERN, INC. 31 PLEASANT STREET, WEST BRIDGEWATER, MA 02379 $ 994,359.45 C CPM CONSTRUCTORS PO BOX B, 30 BONNEY STREET, FREEPORT, ME 04032 $ 1,046,729.00 D EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $ 1,089,646.52 E LIDDELL BROTHERS, INC. 600 INDUSTRIAL DR., HALIFAX, MA 02338 $ 1,099,484.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 515. 2.50 1,287.50 3.20 1,648.00 2.00 1,030.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 1. 2,600.00 2,600.00 1,670.00 1,670.00 3,500.00 3,500.00 206.1 COMMON STRUCTURE EXCAVATION CY 1,100. 35.00 38,500.00 35.00 38,500.00 40.00 44,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 50.00 2,500.00 61.00 3,050.00 60.00 3,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 100. 240.00 24,000.00 100.00 10,000.00 200.00 20,000.00 214. FINE GRADING U 1. 3,000.00 3,000.00 2,500.00 2,500.00 500.00 500.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 28,500.00 28,500.00 35,000.00 35,000.00 25,000.00 25,000.00 503.302 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 32,000.00 32,000.00 31,000.00 31,000.00 25,000.00 25,000.00 508. STRUCTURAL FILL CY 72. 120.00 8,640.00 92.00 6,624.00 80.00 5,760.00 510.1 PILE DRIVING EQUIPMENT U 1. 43,000.00 43,000.00 41,000.00 41,000.00 25,000.00 25,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 42,000. .12 5,040.00 .61 25,620.00 .50 21,000.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 20. 60.00 1,200.00 92.00 1,840.00 200.00 4,000.00 520.2 CONCRETE CLASS B CY 174. 275.00 47,850.00 300.00 52,200.00 325.00 56,550.00 544.1 REINFORCING STEEL (ROADWAY) LB 17,100. 1.00 17,100.00 .68 11,628.00 1.00 17,100.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 512.5 26.00 13,325.00 28.00 14,350.00 22.00 11,275.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 1. 2,500.00 2,500.00 3,300.00 3,300.00 2,100.00 2,100.00 14503 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 750.00 1,500.00 630.00 1,260.00 600.00 1,200.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 700. 8.00 5,600.00 25.00 17,500.00 25.00 17,500.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 4,500.00 9,000.00 7,700.00 15,400.00 5,000.00 10,000.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 330. 60.00 19,800.00 51.00 16,830.00 60.00 19,800.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 5. 400.00 2,000.00 300.00 1,500.00 1,000.00 5,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 9. 45.00 405.00 9.00 81.00 100.00 900.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 1,680.5 16.00 26,888.00 16.50 27,728.25 25.00 42,012.50 615.043 REMOVING TRAFFIC SIGN TYPE AA U 1. 500.00 500.00 3,400.00 3,400.00 1,000.00 1,000.00 615.044 RELOCATING TRAFFIC SIGN TYPE AA U 3. 500.00 1,500.00 520.00 1,560.00 1,500.00 4,500.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 3.13 15.00 46.95 240.00 751.20 50.00 156.50 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 87,500.00 87,500.00 92,000.00 92,000.00 80,000.00 80,000.00 615.10301 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 5,000.00 5,000.00 615.10302 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 5,000.00 5,000.00 615.10303 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 5,000.00 5,000.00 615.10304 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 5,000.00 5,000.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 21,250.00 21,250.00 21,000.00 21,000.00 25,000.00 25,000.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 1,700.00 1,700.00 6,000.00 6,000.00 615.20003 CANTILEVER TRAFFICS SIGN STRUCTURE U 1. 22,500.00 22,500.00 23,000.00 23,000.00 25,000.00 25,000.00 615.20004 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 29,350.00 29,350.00 29,000.00 29,000.00 28,000.00 28,000.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,500.00 2,500.00 4,500.00 4,500.00 5,000.00 5,000.00 615.20302 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,500.00 2,500.00 4,500.00 4,500.00 5,000.00 5,000.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 7,500.00 7,500.00 9,500.00 9,500.00 15,000.00 15,000.00 615.30002 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 7,500.00 7,500.00 9,500.00 9,500.00 15,000.00 15,000.00 615.61 TRI- MESSAGE PRISM SIGN U 12. 17,700.00 212,400.00 20,000.00 240,000.00 15,000.00 180,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 7,500.00 7,500.00 19,000.00 19,000.00 38,000.00 38,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 13. 100.00 1,300.00 300.00 3,900.00 500.00 6,500.00 14503 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 7. 10.00 70.00 10.00 70.00 5.00 35.00 621.31 SINGLE DELINEATOR WITH POST EA 7. 40.00 280.00 37.00 259.00 30.00 210.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 35. 6.00 210.00 19.00 665.00 10.00 350.00 645.531 SILT FENCE LF 500. 5.00 2,500.00 1.40 700.00 3.00 1,500.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 750. 10.00 7,500.00 13.50 10,125.00 7.00 5,250.00 692. MOBILIZATION U 1. 25,000.00 25,000.00 15,000.00 15,000.00 100,000.00 100,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1008.44 ALTERATIONS AND ADDITIONS AS NEEDED UTILITY REIMBURSEMENT $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $924,642.45 $994,359.45 $1,046,729.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH-HAMPTON-HOOKSETT 14503 COUNTIES AND CODES: ROCKINGHAM 015 MERRIMACK 013 DATE BIDS OPEN: FEBRUARY 15, 2007 SCOPE OF WORK: SIGN REPLACEMENT LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: NOVEMBER 30, 2007 A NES TRAFFIC SAFETY, L.P. 55 BODWELL ST., AVON, MA 02322 $ 924,642.45 B VISI-FLASH RENTALS EASTERN, INC. 31 PLEASANT STREET, WEST BRIDGEWATER, MA 02379 $ 994,359.45 C CPM CONSTRUCTORS PO BOX B, 30 BONNEY STREET, FREEPORT, ME 04032 $ 1,046,729.00 D EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $ 1,089,646.52 E LIDDELL BROTHERS, INC. 600 INDUSTRIAL DR., HALIFAX, MA 02338 $ 1,099,484.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 515. 4.00 2,060.00 3.50 1,802.50 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 1. 2,700.00 2,700.00 3,000.00 3,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 1,100. 15.00 16,500.00 14.00 15,400.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 75.00 3,750.00 100.00 5,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 100. 150.00 15,000.00 175.00 17,500.00 214. FINE GRADING U 1. 3,000.00 3,000.00 8,000.00 8,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 30,500.00 30,500.00 27,800.00 27,800.00 503.302 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 27,700.00 27,700.00 30,000.00 30,000.00 508. STRUCTURAL FILL CY 72. 80.00 5,760.00 100.00 7,200.00 510.1 PILE DRIVING EQUIPMENT U 1. 35,000.00 35,000.00 43,000.00 43,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 42,000. .50 21,000.00 .25 10,500.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 20. 75.00 1,500.00 100.00 2,000.00 520.2 CONCRETE CLASS B CY 174. 350.00 60,900.00 260.00 45,240.00 544.1 REINFORCING STEEL (ROADWAY) LB 17,100. .90 15,390.00 1.00 17,100.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 512.5 22.00 11,275.00 22.00 11,275.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 1. 2,200.00 2,200.00 3,500.00 3,500.00 14503 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 600.00 1,200.00 625.00 1,250.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 700. 28.00 19,600.00 17.00 11,900.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 3,500.00 7,000.00 5,000.00 10,000.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 330. 58.00 19,140.00 60.00 19,800.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 5. 500.00 2,500.00 500.00 2,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 9. 200.00 1,800.00 60.00 540.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 1,680.5 17.75 29,828.88 17.00 28,568.50 615.043 REMOVING TRAFFIC SIGN TYPE AA U 1. 2,000.00 2,000.00 500.00 500.00 615.044 RELOCATING TRAFFIC SIGN TYPE AA U 3. 500.00 1,500.00 800.00 2,400.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 3.13 20.00 62.60 25.00 78.25 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 125,000.00 125,000.00 108,000.00 108,000.00 615.10301 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 6,000.00 6,000.00 15,000.00 15,000.00 615.10302 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 6,000.00 6,000.00 10,000.00 10,000.00 615.10303 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 15,000.00 15,000.00 615.10304 REMOVING FULL TRAFFIC SIGN STRUCTURE U 1. 4,000.00 4,000.00 10,000.00 10,000.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 35,000.00 35,000.00 24,000.00 24,000.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 16,000.00 16,000.00 5,000.00 5,000.00 615.20003 CANTILEVER TRAFFICS SIGN STRUCTURE U 1. 35,000.00 35,000.00 25,000.00 25,000.00 615.20004 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 42,000.00 42,000.00 29,000.00 29,000.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 3,500.00 3,500.00 2,000.00 2,000.00 615.20302 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 3,500.00 3,500.00 2,000.00 2,000.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 7,000.00 7,000.00 15,000.00 15,000.00 615.30002 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 7,000.00 7,000.00 14,500.00 14,500.00 615.61 TRI- MESSAGE PRISM SIGN U 12. 19,766.67 237,200.04 24,000.00 288,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 30,000.00 30,000.00 30,000.00 30,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 13. 400.00 5,200.00 500.00 6,500.00 14503 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 7. 10.00 70.00 10.00 70.00 621.31 SINGLE DELINEATOR WITH POST EA 7. 30.00 210.00 30.00 210.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 35. 10.00 350.00 10.00 350.00 645.531 SILT FENCE LF 500. 5.00 2,500.00 5.00 2,500.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 750. 3.00 2,250.00 10.00 7,500.00 692. MOBILIZATION U 1. 55,000.00 55,000.00 40,000.00 40,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1008.44 ALTERATIONS AND ADDITIONS AS NEEDED UTILITY REIMBURSEMENT $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $1,089,646.52 $1,099,484.25