THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: OSSIPEE X-A000(383), 14434 COUNTIES AND CODES: CARROLL 003 DATE BIDS OPEN: APRIL 19, 2007 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: NH ROUTE 16 SOUTH OF THE INTERSECTION OF PINE RIVER ROAD COMPLETION DATE: SEPTEMBER 14, 2007 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,641,340.00 B CPM CONSTRUCTORS PO BOX B 30 BONNEY ST., FREEPORT, ME 04032 $ 1,821,651.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 5,415. 1.70 9,205.50 2.15 11,642.25 203.1 COMMON EXCAVATION CY 30. 40.00 1,200.00 25.00 750.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 575. 10.00 5,750.00 50.00 28,750.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 10. 1,300.00 13,000.00 1,350.00 13,500.00 203.5596 GUARDRAIL TERMINAL E-2 PLATFORM LF 625. 7.50 4,687.50 16.00 10,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 70.00 1,750.00 30.00 750.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 15. 45.00 675.00 60.00 900.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 325. 23.50 7,637.50 26.00 8,450.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 8,500. 66.00 561,000.00 66.00 561,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 200. 105.00 21,000.00 105.00 21,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 51,500. .21 10,815.00 .22 11,330.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 56.5 300.00 16,950.00 300.00 16,950.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,300. 5.40 17,820.00 5.50 18,150.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 15,000.00 15,000.00 60,000.00 60,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 15,000.00 15,000.00 60,000.00 60,000.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 992. 5.00 4,960.00 15.00 14,880.00 14434 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 160. 300.00 48,000.00 275.00 44,000.00 520.01 CONCRETE CLASS AA CY 18. 700.00 12,600.00 510.00 9,180.00 520.02 CONCRETE CLASS AA ABOVE FOOTINGS CY 8. 1,000.00 8,000.00 1,020.00 8,160.00 534.1 WATER REPELLENT (LINSEED OIL) GAL 14. 50.00 700.00 75.00 1,050.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 992. 25.00 24,800.00 27.00 26,784.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 1,190. 3.00 3,570.00 5.00 5,950.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 113. 76.00 8,588.00 86.00 9,718.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 113. 66.00 7,458.00 74.00 8,362.00 563.22307 BRIDGE RAIL T2 WITH SNOW SCREENING (RETROFIT) (F) LF 398. 120.00 47,760.00 129.00 51,342.00 565.22 BRIDGE APPROACH RAIL T2 (F) LF 232. 110.00 25,520.00 115.00 26,680.00 585.3 STONE FILL, CLASS C CY 10. 95.00 950.00 50.00 500.00 603.34112 12" STEEL END SECTIONS EA 2. 125.00 250.00 210.00 420.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 40. 75.00 3,000.00 17.00 680.00 604.0007 POLYETHYLENE LINER EA 25. 175.00 4,375.00 215.00 5,375.00 604.242 DROP INLETS TYPE D-B U 2. 1,300.00 2,600.00 1,500.00 3,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 50. 220.00 11,000.00 275.00 13,750.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 5,300. 16.00 84,800.00 15.00 79,500.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 10. 1,900.00 19,000.00 1,900.00 19,000.00 606.1496 BEAM GUARDRAIL (TERMINAL UNIT TYPE E-2) LF 625. 25.00 15,625.00 24.00 15,000.00 608.26 6" CONCRETE SIDEWALK (F) SY 365. 40.00 14,600.00 30.00 10,950.00 609.5 RESET GRANITE CURB LF 5,850. 8.00 46,800.00 7.50 43,875.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 4,775. 4.95 23,636.25 6.50 31,037.50 615.01 TRAFFIC SIGN TYPE A (F) SF 36. 30.00 1,080.00 35.00 1,260.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 604. 55.00 33,220.00 60.00 36,240.00 615.02 TRAFFIC SIGN TYPE B (F) SF 16. 60.00 960.00 65.00 1,040.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 331. 75.00 24,825.00 80.00 26,480.00 615.03 TRAFFIC SIGN TYPE C (F) SF 133.5 35.00 4,672.50 39.00 5,206.50 615.05 TRAFFIC SIGN TYPE BB (F) SF 34. 24.00 816.00 27.00 918.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 59.75 15.00 896.25 17.00 1,015.75 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 14434 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 618.7 FLAGGERS HR 2,500. 19.59 48,975.00 21.00 52,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 44,000.00 44,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 300.00 3,600.00 320.00 3,840.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 4. 300.00 1,200.00 1,700.00 6,800.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 5,000.00 10,000.00 10,000.00 20,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 75. 4.00 300.00 4.00 300.00 621.31 SINGLE DELINEATOR WITH POST EA 200. 27.00 5,400.00 28.00 5,600.00 621.32 DOUBLE DELINEATOR WITH POST EA 25. 30.00 750.00 37.00 925.00 628.2 SAWED BITUMINOUS PAVEMENT LF 300. 2.00 600.00 4.00 1,200.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 91,000. .11 10,010.00 .14 12,740.00 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 1,500. .20 300.00 .33 495.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 1,100. 1.40 1,540.00 .65 715.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 75. 3.50 262.50 3.30 247.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 225. 5.00 1,125.00 5.50 1,237.50 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 24,000. .30 7,200.00 .35 8,400.00 645.3 EROSION STONE TON 200. 35.00 7,000.00 40.00 8,000.00 645.531 SILT FENCE LF 1,700. 2.00 3,400.00 3.00 5,100.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,300.00 4,300.00 2,000.00 2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 50.00 2,500.00 40.00 2,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 2. 1,400.00 2,800.00 3,000.00 6,000.00 647.1 HUMUS CY 625. 45.00 28,125.00 25.00 15,625.00 692. MOBILIZATION U 1. 115,000.00 115,000.00 165,000.00 165,000.00 698.13 FIELD OFFICE TYPE C MON 6. 1,200.00 7,200.00 2,700.00 16,200.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 14434 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 8,200.00 8,200.00 8,200.00 8,200.00 $1,641,340.00 $1,821,651.00