THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: GILFORD 14359 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: FEBRUARY 28, 2007 SCOPE OF WORK: SIGNAL REPLACEMENT LOCATION: NH ROUTE 11 AND US 3 BYPASS IN GILFORD COMPLETION DATE: NOVEMBER 2, 2007 A MOULISON NORTH CORPORATION 10 IRON TRAIL, BIDDEFORD, ME 04005 $ 143,118.00 B NEW ENGLAND SIGNAL SYSTEMS, INC. 616 1ST NH TNPK, PO BOX 326, NORTHWOOD, NH 03261 $ 149,997.00 C EAST COAST SIGNALS, INC. 69 NORTH ROAD, DEERFIELD, NH 03037 $ 155,911.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 15. 65.00 975.00 75.00 1,125.00 30.00 450.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 200. 100.00 20,000.00 110.00 22,000.00 110.00 22,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 130.00 6,500.00 125.00 6,250.00 130.00 6,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 556. 13.00 7,228.00 12.00 6,672.00 9.00 5,004.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 750.00 1,500.00 500.00 1,000.00 800.00 1,600.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 50. 35.00 1,750.00 25.00 1,250.00 24.00 1,200.00 609.5 RESET GRANITE CURB LF 470. 12.00 5,640.00 6.50 3,055.00 20.00 9,400.00 614.511 CONCRETE PULL BOX 14" EA 12. 275.00 3,300.00 260.00 3,120.00 270.00 3,240.00 614.522 MOLDED PULL BOX 13"X24" EA 3. 275.00 825.00 250.00 750.00 300.00 900.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 1,020. 6.00 6,120.00 7.00 7,140.00 7.00 7,140.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 160. 12.00 1,920.00 15.00 2,400.00 22.00 3,520.00 615.03 TRAFFIC SIGN TYPE C (F) SF 4. 75.00 300.00 45.00 180.00 80.00 320.00 616.101 TRAFFIC SIGNALS U 1. 49,800.00 49,800.00 51,000.00 51,000.00 52,000.00 52,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 618.7 FLAGGERS HR 250. 20.00 5,000.00 25.00 6,250.00 23.00 5,750.00 619.1 MAINTENANCE OF TRAFFIC U 1. 1,800.00 1,800.00 5,000.00 5,000.00 5,000.00 5,000.00 621.31 SINGLE DELINEATOR WITH POST EA 25. 36.00 900.00 35.00 875.00 30.50 762.50 628.2 SAWED BITUMINOUS PAVEMENT LF 520. 2.00 1,040.00 4.00 2,080.00 2.00 1,040.00 632.93 OBLITERATE PAVEMENT MARKINGS, RAISED PAVEMENT MARKINGS EA 14. 100.00 1,400.00 50.00 700.00 95.00 1,330.00 14359 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 15. 8.00 120.00 10.00 150.00 7.00 105.00 645.531 SILT FENCE LF 300. 5.00 1,500.00 5.00 1,500.00 5.00 1,500.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 250. 6.00 1,500.00 10.00 2,500.00 9.00 2,250.00 692. MOBILIZATION U 1. 4,000.00 4,000.00 5,000.00 5,000.00 4,900.00 4,900.00 $143,118.00 $149,997.00 $155,911.50