THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: CHICHESTER 13922 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MARCH 29, 2007 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH ROUTE 4, MAIN STREET AND HORSE CORNER ROAD COMPLETION DATE: NOVEMBER 16, 2007 A WEAVER BROS., CONST., CO., INC. POO BOX 1326, CONCORD, NH 03301 $ 2,034,099.25 B JAMES S. PISCOPO, G. C. INC. PO BOX 130, WINNISQUAM, NH 03289 $ 2,105,636.70 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,240,978.00 D F. L. MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,296,581.75 E R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 2,364,257.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .15 15,000.00 2,250.00 13,000.00 1,950.00 37,000.00 5,550.00 201.21 REMOVING SMALL TREES EA 2. 200.00 400.00 125.00 250.00 400.00 800.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 550. 7.50 4,125.00 15.00 8,250.00 20.00 11,000.00 203.1 COMMON EXCAVATION CY 7,550. 6.30 47,565.00 11.50 86,825.00 14.00 105,700.00 203.2 ROCK EXCAVATION CY 220. 35.00 7,700.00 92.00 20,240.00 150.00 33,000.00 203.35 HANDLING OF EXCAVATED, CONTAMINATED SOILS CY 100. 15.00 1,500.00 30.00 3,000.00 33.00 3,300.00 203.6 EMBANKMENT-IN-PLACE (F) CY 4,975. 7.80 38,805.00 2.00 9,950.00 7.50 37,312.50 206.1 COMMON STRUCTURE EXCAVATION CY 240. 9.15 2,196.00 27.00 6,480.00 33.50 8,040.00 206.2 ROCK STRUCTURE EXCAVATION CY 350. 150.00 52,500.00 150.00 52,500.00 129.00 45,150.00 209.1 GRANULAR BACKFILL CY 200. 14.00 2,800.00 8.50 1,700.00 19.00 3,800.00 209.4 GRANULAR BACKFILL (GRAV) CY 1,110. 22.00 24,420.00 25.00 27,750.00 38.50 42,735.00 211.11 VIBRATION MONITORING SERVICES HR 150. 82.00 12,300.00 80.00 12,000.00 50.00 7,500.00 304.1 SAND (F) CY 450. 18.50 8,325.00 22.00 9,900.00 20.00 9,000.00 304.2 GRAVEL (F) CY 750. 18.50 13,875.00 24.00 18,000.00 25.00 18,750.00 304.3 CRUSHED GRAVEL (F) CY 3,300. 20.00 66,000.00 32.00 105,600.00 30.00 99,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 110. 90.00 9,900.00 94.00 10,340.00 90.00 9,900.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 4,650. 59.00 274,350.00 62.00 288,300.00 59.90 278,535.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 440. 99.00 43,560.00 100.00 44,000.00 95.00 41,800.00 13922 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 500. 60.00 30,000.00 64.00 32,000.00 62.90 31,450.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,020. 8.00 24,160.00 8.30 25,066.00 7.35 22,197.00 520.1 CONCRETE CLASS A CY 8. 675.00 5,400.00 450.00 3,600.00 1,020.00 8,160.00 544. REINFORCING STEEL (F) LB 70. 3.00 210.00 3.00 210.00 4.00 280.00 583.1 RIPRAP A CY 9. 50.00 450.00 60.00 540.00 53.00 477.00 585.3 STONE FILL, CLASS C CY 200. 23.00 4,600.00 48.00 9,600.00 45.00 9,000.00 593.121 GEOTEXTILE; SUBSUR DRAIN CL.2, NON-WOVEN SY 675. 4.00 2,700.00 1.50 1,012.50 2.80 1,890.00 603.00212 12" R.C. PIPE, 2000D LF 450. 28.00 12,600.00 60.00 27,000.00 44.00 19,800.00 603.00215 15" R.C. PIPE, 2000D LF 500. 30.00 15,000.00 42.00 21,000.00 42.50 21,250.00 603.00224 24" R.C. PIPE, 2000D LF 590. 35.00 20,650.00 47.00 27,730.00 44.50 26,255.00 603.00230 30" R.C. PIPE, 2000D LF 460. 54.00 24,840.00 59.00 27,140.00 65.00 29,900.00 603.00236 36" R.C. PIPE, 2000D LF 90. 140.00 12,600.00 175.00 15,750.00 300.00 27,000.00 603.13012 12" CORR. ALUMINIZED STEEL (TYPE2) PIPE .064" LF 170. 27.00 4,590.00 30.00 5,100.00 28.50 4,845.00 603.30124 24" R.C. END SECTIONS EA 1. 850.00 850.00 750.00 750.00 1,130.00 1,130.00 603.34112 12" STEEL END SECTIONS EA 1. 130.00 130.00 85.00 85.00 169.00 169.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 110. 38.00 4,180.00 58.00 6,380.00 67.50 7,425.00 603.83236 36" PLASTIC PIPE (SMOOTH INTERIOR) LF 115. 47.00 5,405.00 62.00 7,130.00 72.00 8,280.00 603.930 INSTALL 30" PLASTIC PIPE (SUPPLIED BY OTHERS) LF 140. 26.00 3,640.00 20.00 2,800.00 30.00 4,200.00 604.0007 POLYETHYLENE LINER EA 15. 210.00 3,150.00 141.00 2,115.00 152.00 2,280.00 604.12 CATCH BASINS TYPE B U 18.6 1,600.00 29,760.00 947.00 17,614.20 1,650.00 30,690.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 10.9 2,100.00 22,890.00 1,900.00 20,710.00 2,100.00 22,890.00 604.15 CATCH BASINS TYPE E U 7. 1,700.00 11,900.00 2,100.00 14,700.00 2,000.00 14,000.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 1.2 3,200.00 3,840.00 2,400.00 2,880.00 3,100.00 3,720.00 604.25 DROP INLETS TYPE E U 2. 1,550.00 3,100.00 1,700.00 3,400.00 1,600.00 3,200.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 30. 250.00 7,500.00 225.00 6,750.00 255.00 7,650.00 604.6 MANHOLE COVERS & FRAMES EA 18. 420.00 7,560.00 550.00 9,900.00 500.00 9,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 630. 16.00 10,080.00 17.00 10,710.00 16.50 10,395.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 4,225. 11.00 46,475.00 13.60 57,460.00 15.50 65,487.50 608.26 6" CONCRETE SIDEWALK (F) SY 320. 42.00 13,440.00 48.00 15,360.00 53.00 16,960.00 608.411 RESET BRICK SIDEWALK SY 4. 165.00 660.00 115.00 460.00 840.00 3,360.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 9. 700.00 6,300.00 325.00 2,925.00 388.00 3,492.00 609.01 STRAIGHT GRANITE CURB LF 1,900. 15.50 29,450.00 17.80 33,820.00 17.00 32,300.00 609.02 CURVED GRANITE CURB LF 40. 26.00 1,040.00 24.35 974.00 25.50 1,020.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 230. 14.00 3,220.00 15.75 3,622.50 15.00 3,450.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 80. 15.00 1,200.00 13.85 1,108.00 15.00 1,200.00 13922 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.5 RESET GRANITE CURB LF 3,250. 6.50 21,125.00 9.40 30,550.00 7.80 25,350.00 609.93 SPECIAL GRANITE CURB W/ 12"-18" REVEAL LF 106. 83.00 8,798.00 75.00 7,950.00 74.00 7,844.00 614.511 CONCRETE PULL BOX 14" EA 22. 280.00 6,160.00 280.00 6,160.00 260.00 5,720.00 614.523 MOLDED PULL BOX 17"X30" EA 5. 330.00 1,650.00 320.00 1,600.00 300.00 1,500.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 750. 7.00 5,250.00 7.50 5,625.00 6.80 5,100.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 240. 14.00 3,360.00 14.40 3,456.00 13.00 3,120.00 614.7324 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 40 LF 220. 10.00 2,200.00 10.00 2,200.00 9.30 2,046.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 180. 27.00 4,860.00 27.75 4,995.00 25.00 4,500.00 615.02 TRAFFIC SIGN TYPE B (F) SF 96. 70.00 6,720.00 66.00 6,336.00 60.00 5,760.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 24. 85.00 2,040.00 83.00 1,992.00 75.00 1,800.00 615.03 TRAFFIC SIGN TYPE C (F) SF 185.5 44.00 8,162.00 40.00 7,420.00 36.00 6,678.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 165.00 330.00 166.00 332.00 150.00 300.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 46. 22.00 1,012.00 22.00 1,012.00 20.00 920.00 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 1. 110.00 110.00 166.00 166.00 150.00 150.00 616.101 TRAFFIC SIGNALS U 1. 85,000.00 85,000.00 90,000.00 90,000.00 79,000.00 79,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 12,500.00 12,500.00 12,500.00 12,500.00 11,500.00 11,500.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 2,000.00 2,000.00 1,750.00 1,750.00 1,500.00 1,500.00 618.6 UNIFORMED OFFICERS $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 3,000. 20.00 60,000.00 19.00 57,000.00 23.50 70,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 51,000.00 51,000.00 60,000.00 60,000.00 95,000.00 95,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 10,000.00 20,000.00 8,800.00 17,600.00 621.31 SINGLE DELINEATOR WITH POST EA 13. 30.00 390.00 29.00 377.00 27.00 351.00 621.322 SINGLE DELINEATOR DOUBLE FACED WITH POST (YELLOW) EA 10. 30.00 300.00 31.00 310.00 29.00 290.00 622.1 STEEL WITNESS MARKERS EA 11. 27.00 297.00 27.00 297.00 25.00 275.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,200. 3.00 3,600.00 1.25 1,500.00 2.00 2,400.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 66,900. .13 8,697.00 .15 10,035.00 .14 9,366.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 1,350. .63 850.50 .65 877.50 .50 675.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 275. 2.00 550.00 2.00 550.00 2.50 687.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 1,600. 3.90 6,240.00 4.00 6,400.00 3.50 5,600.00 641. LOAM CY 1,540. 15.00 23,100.00 28.00 43,120.00 50.00 77,000.00 13922 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 LB 4. 17.00 68.00 16.00 64.00 15.00 60.00 645.24 CHANNEL STABILIZATION (HIGH VELOCITY) SY 175. 3.85 673.75 4.00 700.00 3.50 612.50 645.3 EROSION STONE TON 400. 24.50 9,800.00 27.00 10,800.00 34.50 13,800.00 645.531 SILT FENCE LF 6,100. 2.00 12,200.00 1.90 11,590.00 2.80 17,080.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,000.00 4,000.00 6,000.00 6,000.00 6,000.00 6,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 75. 70.00 5,250.00 60.00 4,500.00 60.00 4,500.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 17,400. .35 6,090.00 .40 6,960.00 .32 5,568.00 647.1 HUMUS CY 375. 15.00 5,625.00 20.00 7,500.00 36.00 13,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 15. 150.00 2,250.00 125.00 1,875.00 200.00 3,000.00 692. MOBILIZATION U 1. 250,000.00 250,000.00 146,600.00 146,600.00 125,000.00 125,000.00 698.13 FIELD OFFICE TYPE C MON 8. 2,200.00 17,600.00 1,500.00 12,000.00 1,000.00 8,000.00 698.2 PHYSICAL TESTING LABORATORY MON 5. 1,000.00 5,000.00 1,000.00 5,000.00 510.00 2,550.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.311 ALTERATIONS AND ADDITIONS AS NEEDED- DRAINAGE AND SITEWORK $ 1. 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 1010.15 FUEL ADJUSTMENT $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 5,600.00 5,600.00 5,600.00 5,600.00 5,600.00 5,600.00 $2,034,099.25 $2,105,636.70 $2,240,978.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: CHICHESTER 13922 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MARCH 29, 2007 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH ROUTE 4, MAIN STREET AND HORSE CORNER ROAD COMPLETION DATE: NOVEMBER 16, 2007 A WEAVER BROS., CONST., CO., INC. POO BOX 1326, CONCORD, NH 03301 $ 2,034,099.25 B JAMES S. PISCOPO, G. C. INC. PO BOX 130, WINNISQUAM, NH 03289 $ 2,105,636.70 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,240,978.00 D F. L. MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,296,581.75 E R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 2,364,257.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .15 30,000.00 4,500.00 21,000.00 3,150.00 201.21 REMOVING SMALL TREES EA 2. 350.00 700.00 450.00 900.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 550. 10.00 5,500.00 23.00 12,650.00 203.1 COMMON EXCAVATION CY 7,550. 7.50 56,625.00 14.00 105,700.00 203.2 ROCK EXCAVATION CY 220. 15.00 3,300.00 46.00 10,120.00 203.35 HANDLING OF EXCAVATED, CONTAMINATED SOILS CY 100. 40.00 4,000.00 25.00 2,500.00 203.6 EMBANKMENT-IN-PLACE (F) CY 4,975. 5.50 27,362.50 14.00 69,650.00 206.1 COMMON STRUCTURE EXCAVATION CY 240. 13.00 3,120.00 19.50 4,680.00 206.2 ROCK STRUCTURE EXCAVATION CY 350. 50.00 17,500.00 160.00 56,000.00 209.1 GRANULAR BACKFILL CY 200. 22.00 4,400.00 35.00 7,000.00 209.4 GRANULAR BACKFILL (GRAV) CY 1,110. 24.00 26,640.00 35.00 38,850.00 211.11 VIBRATION MONITORING SERVICES HR 150. 82.00 12,300.00 70.00 10,500.00 304.1 SAND (F) CY 450. 14.50 6,525.00 27.00 12,150.00 304.2 GRAVEL (F) CY 750. 18.00 13,500.00 28.00 21,000.00 304.3 CRUSHED GRAVEL (F) CY 3,300. 22.00 72,600.00 35.00 115,500.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 110. 56.00 6,160.00 60.00 6,600.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 4,650. 56.00 260,400.00 56.00 260,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 440. 95.00 41,800.00 90.00 39,600.00 13922 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 500. 56.00 28,000.00 60.00 30,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,020. 6.50 19,630.00 7.00 21,140.00 520.1 CONCRETE CLASS A CY 8. 400.00 3,200.00 600.00 4,800.00 544. REINFORCING STEEL (F) LB 70. 3.30 231.00 3.00 210.00 583.1 RIPRAP A CY 9. 56.00 504.00 80.00 720.00 585.3 STONE FILL, CLASS C CY 200. 48.00 9,600.00 36.00 7,200.00 593.121 GEOTEXTILE; SUBSUR DRAIN CL.2, NON-WOVEN SY 675. 3.80 2,565.00 4.50 3,037.50 603.00212 12" R.C. PIPE, 2000D LF 450. 110.00 49,500.00 58.00 26,100.00 603.00215 15" R.C. PIPE, 2000D LF 500. 65.00 32,500.00 60.00 30,000.00 603.00224 24" R.C. PIPE, 2000D LF 590. 88.00 51,920.00 78.00 46,020.00 603.00230 30" R.C. PIPE, 2000D LF 460. 86.00 39,560.00 93.00 42,780.00 603.00236 36" R.C. PIPE, 2000D LF 90. 140.00 12,600.00 233.00 20,970.00 603.13012 12" CORR. ALUMINIZED STEEL (TYPE2) PIPE .064" LF 170. 40.00 6,800.00 48.00 8,160.00 603.30124 24" R.C. END SECTIONS EA 1. 1,000.00 1,000.00 1,100.00 1,100.00 603.34112 12" STEEL END SECTIONS EA 1. 200.00 200.00 190.00 190.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 110. 80.00 8,800.00 83.00 9,130.00 603.83236 36" PLASTIC PIPE (SMOOTH INTERIOR) LF 115. 85.00 9,775.00 98.00 11,270.00 603.930 INSTALL 30" PLASTIC PIPE (SUPPLIED BY OTHERS) LF 140. 52.00 7,280.00 63.00 8,820.00 604.0007 POLYETHYLENE LINER EA 15. 210.00 3,150.00 300.00 4,500.00 604.12 CATCH BASINS TYPE B U 18.6 2,500.00 46,500.00 1,800.00 33,480.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 10.9 3,000.00 32,700.00 2,100.00 22,890.00 604.15 CATCH BASINS TYPE E U 7. 2,500.00 17,500.00 1,800.00 12,600.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 1.2 4,000.00 4,800.00 3,500.00 4,200.00 604.25 DROP INLETS TYPE E U 2. 3,000.00 6,000.00 1,400.00 2,800.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 30. 270.00 8,100.00 300.00 9,000.00 604.6 MANHOLE COVERS & FRAMES EA 18. 500.00 9,000.00 300.00 5,400.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 630. 30.00 18,900.00 40.00 25,200.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 4,225. 38.00 160,550.00 12.00 50,700.00 608.26 6" CONCRETE SIDEWALK (F) SY 320. 62.00 19,840.00 38.00 12,160.00 608.411 RESET BRICK SIDEWALK SY 4. 56.00 224.00 125.00 500.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 9. 500.00 4,500.00 500.00 4,500.00 609.01 STRAIGHT GRANITE CURB LF 1,900. 21.00 39,900.00 14.50 27,550.00 609.02 CURVED GRANITE CURB LF 40. 30.00 1,200.00 20.00 800.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 230. 18.00 4,140.00 12.50 2,875.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 80. 18.00 1,440.00 12.50 1,000.00 13922 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.5 RESET GRANITE CURB LF 3,250. 10.00 32,500.00 5.00 16,250.00 609.93 SPECIAL GRANITE CURB W/ 12"-18" REVEAL LF 106. 73.00 7,738.00 65.00 6,890.00 614.511 CONCRETE PULL BOX 14" EA 22. 270.00 5,940.00 250.00 5,500.00 614.523 MOLDED PULL BOX 17"X30" EA 5. 375.00 1,875.00 260.00 1,300.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 750. 7.00 5,250.00 6.00 4,500.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 240. 13.00 3,120.00 18.00 4,320.00 614.7324 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 40 LF 220. 9.00 1,980.00 9.00 1,980.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 180. 16.00 2,880.00 25.00 4,500.00 615.02 TRAFFIC SIGN TYPE B (F) SF 96. 60.00 5,760.00 65.00 6,240.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 24. 75.00 1,800.00 75.00 1,800.00 615.03 TRAFFIC SIGN TYPE C (F) SF 185.5 36.00 6,678.00 40.00 7,420.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 150.00 300.00 150.00 300.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 46. 20.00 920.00 20.00 920.00 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 1. 125.00 125.00 100.00 100.00 616.101 TRAFFIC SIGNALS U 1. 85,500.00 85,500.00 80,000.00 80,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 12,000.00 12,000.00 8,500.00 8,500.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 3,200.00 3,200.00 1,500.00 1,500.00 618.6 UNIFORMED OFFICERS $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 3,000. 23.00 69,000.00 20.00 60,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 124,000.00 124,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 22,000.00 44,000.00 621.31 SINGLE DELINEATOR WITH POST EA 13. 27.00 351.00 25.00 325.00 621.322 SINGLE DELINEATOR DOUBLE FACED WITH POST (YELLOW) EA 10. 35.00 350.00 25.00 250.00 622.1 STEEL WITNESS MARKERS EA 11. 31.00 341.00 25.00 275.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,200. 3.00 3,600.00 1.50 1,800.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 66,900. .12 8,028.00 .12 8,028.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 1,350. .58 783.00 .58 783.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 275. 1.85 508.75 1.85 508.75 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 1,600. 3.55 5,680.00 3.55 5,680.00 641. LOAM CY 1,540. 13.00 20,020.00 25.00 38,500.00 13922 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 LB 4. 15.00 60.00 5.00 20.00 645.24 CHANNEL STABILIZATION (HIGH VELOCITY) SY 175. 3.50 612.50 3.50 612.50 645.3 EROSION STONE TON 400. 30.00 12,000.00 30.00 12,000.00 645.531 SILT FENCE LF 6,100. 3.00 18,300.00 2.60 15,860.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 5,000.00 5,000.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 75. 90.00 6,750.00 60.00 4,500.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 17,400. .35 6,090.00 .32 5,568.00 647.1 HUMUS CY 375. 10.00 3,750.00 22.00 8,250.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 15. 250.00 3,750.00 175.00 2,625.00 692. MOBILIZATION U 1. 250,000.00 250,000.00 197,000.00 197,000.00 698.13 FIELD OFFICE TYPE C MON 8. 1,800.00 14,400.00 2,100.00 16,800.00 698.2 PHYSICAL TESTING LABORATORY MON 5. 1,500.00 7,500.00 2,100.00 10,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.311 ALTERATIONS AND ADDITIONS AS NEEDED- DRAINAGE AND SITEWORK $ 1. 65,000.00 65,000.00 65,000.00 65,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 90,000.00 90,000.00 90,000.00 90,000.00 1010.15 FUEL ADJUSTMENT $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 5,600.00 5,600.00 5,600.00 5,600.00 $2,296,581.75 $2,364,257.75