THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ALTON X-A000(480), 13802 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 11, 2007 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: NH ROUTE 28 BRIDGE OVER THE MERRYMEETING RIVER COMPLETION DATE: AUGUST 7, 2009 A E. D. SWETT, INC. 8 INDUST. PARK DR., CONCORD, NH 03301 $ 2,056,788.15 B WYMAN & SIMPSON, INC. PO BOX 40, RICHMOND, ME 04357 $ 2,214,323.30 C TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,250,711.00 D C P M CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,301,660.35 E ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,304,424.42 F EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $ 2,309,398.60 G R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 2,530,195.00 H R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,589,607.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .2 20,000.00 4,000.00 14,000.00 2,800.00 19,000.00 3,800.00 201.21 REMOVING SMALL TREES EA 10. 400.00 4,000.00 280.00 2,800.00 280.00 2,800.00 201.22 REMOVING LARGE TREES EA 2. 1,800.00 3,600.00 1,500.00 3,000.00 1,450.00 2,900.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 80. 10.00 800.00 10.00 800.00 10.00 800.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 300.00 300.00 315.00 315.00 350.00 350.00 202.6 CURB REMOVAL FOR STORAGE LF 63. 3.00 189.00 2.25 141.75 2.50 157.50 202.7 REMOVAL OF GUARDRAIL (F) LF 505. 2.00 1,010.00 3.00 1,515.00 3.00 1,515.00 203.1 COMMON EXCAVATION CY 3,575. 10.00 35,750.00 3.00 10,725.00 3.00 10,725.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 1,200.00 4,800.00 1,000.00 4,000.00 1,150.00 4,600.00 203.6 EMBANKMENT-IN-PLACE (F) CY 555. 9.00 4,995.00 2.25 1,248.75 2.50 1,387.50 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 15.00 750.00 30.00 1,500.00 35.00 1,750.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 151. 31.00 4,681.00 42.00 6,342.00 25.00 3,775.00 13802 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 211.11 VIBRATION MONITORING SERVICES HR 72. 50.00 3,600.00 80.00 5,760.00 50.00 3,600.00 214. FINE GRADING U 1. 9,000.00 9,000.00 3,600.00 3,600.00 4,500.00 4,500.00 304.1 SAND (F) CY 1,225. 16.00 19,600.00 11.00 13,475.00 12.00 14,700.00 304.2 GRAVEL (F) CY 1,100. 20.00 22,000.00 15.00 16,500.00 16.50 18,150.00 304.3 CRUSHED GRAVEL (F) CY 1,400. 27.00 37,800.00 17.00 23,800.00 18.00 25,200.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 105. 30.00 3,150.00 25.00 2,625.00 24.50 2,572.50 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 1,010. 63.90 64,539.00 65.00 65,650.00 64.00 64,640.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 52. 95.00 4,940.00 95.00 4,940.00 95.00 4,940.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 9. 95.00 855.00 95.00 855.00 95.00 855.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 575. 68.00 39,100.00 70.00 40,250.00 68.00 39,100.00 417. COLD PLANING BITUMINOUS SURFACES SY 505. 10.00 5,050.00 10.00 5,050.00 10.00 5,050.00 501.1 TEMPORARY BRIDGE U 1. 75,000.00 75,000.00 100,000.00 100,000.00 158,000.00 158,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 35,000.00 35,000.00 75,000.00 75,000.00 60,300.00 60,300.00 503.201 COFFERDAMS U 1. 50,000.00 50,000.00 50,000.00 50,000.00 27,500.00 27,500.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 150,000.00 150,000.00 300,000.00 300,000.00 327,500.00 327,500.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 840. 20.00 16,800.00 15.00 12,600.00 16.50 13,860.00 506.2 STEEL SHEET PILING LB 188,000. 1.00 188,000.00 1.25 235,000.00 1.25 235,000.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 52. 750.00 39,000.00 700.00 36,400.00 1,050.00 54,600.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 67. 450.00 30,150.00 300.00 20,100.00 250.00 16,750.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 280. 650.00 182,000.00 550.00 154,000.00 450.00 126,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 57. 500.00 28,500.00 500.00 28,500.00 350.00 19,950.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL CY 350. 200.00 70,000.00 175.00 61,250.00 150.00 52,500.00 528.3121 PRESTRESSED CONCRETE BRIDGE DECK, BUTTED DECK BEAMS (F) SF 1,742. 75.00 130,650.00 70.00 121,940.00 68.00 118,456.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 50. 100.00 5,000.00 45.00 2,250.00 60.00 3,000.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 9. 50.00 450.00 115.00 1,035.00 85.00 765.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 209. 30.00 6,270.00 30.00 6,270.00 38.50 8,046.50 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 56. 10.00 560.00 9.00 504.00 5.00 280.00 13802 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544. REINFORCING STEEL (F) LB 10,362. 1.00 10,362.00 1.00 10,362.00 1.35 13,988.70 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 26,272. 1.20 31,526.40 1.15 30,212.80 1.50 39,408.00 548.11 ELASTOMERIC BEARING PADS (F) EA 22. 300.00 6,600.00 125.00 2,750.00 235.00 5,170.00 559.41 ELASTOMERIC PLUG TYPE FLEXIBLE JOINT, 6 " WIDE (F) LF 67. 100.00 6,700.00 70.00 4,690.00 96.00 6,432.00 559.5 SILICONE JOINT SEALANT (F LF 115. 15.00 1,725.00 5.00 575.00 8.00 920.00 563.23 BRIDGE RAIL T3 (F) LF 229. 135.00 30,915.00 180.00 41,220.00 200.00 45,800.00 563.24 BRIDGE RAIL T4 (F) LF 196. 150.00 29,400.00 200.00 39,200.00 215.00 42,140.00 565.23 BRIDGE APPROACH RAIL T3 (F) LF 30. 182.00 5,460.00 200.00 6,000.00 185.00 5,550.00 565.24 BRIDGE APPROACH RAIL T4 (F) LF 59. 216.00 12,744.00 216.00 12,744.00 220.00 12,980.00 572.1 RECONSTRUCTING STONE WALL ONE STONE WIDE LF 40. 100.00 4,000.00 25.00 1,000.00 25.00 1,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 160. 42.00 6,720.00 50.00 8,000.00 40.00 6,400.00 585.3 STONE FILL, CLASS C CY 12. 46.00 552.00 50.00 600.00 47.00 564.00 585.4 STONE FILL, CLASS D CY 9. 50.00 450.00 75.00 675.00 47.50 427.50 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 270. 3.00 810.00 4.00 1,080.00 4.75 1,282.50 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 32. 2.50 80.00 10.00 320.00 10.00 320.00 603.00215 15" R.C. PIPE, 2000D LF 380. 37.00 14,060.00 45.00 17,100.00 44.00 16,720.00 603.34118 18" STEEL END SECTIONS EA 3. 250.00 750.00 155.00 465.00 155.00 465.00 603.43815 15" CORRUGATED PE PIPE LF 84. 30.00 2,520.00 30.00 2,520.00 30.00 2,520.00 604.0007 POLYETHYLENE LINER EA 9. 150.00 1,350.00 165.00 1,485.00 165.00 1,485.00 604.12 CATCH BASINS TYPE B U 8. 1,900.00 15,200.00 1,800.00 14,400.00 1,795.00 14,360.00 604.242 DROP INLETS TYPE D-B U 1. 1,200.00 1,200.00 1,700.00 1,700.00 1,630.00 1,630.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1. 4,500.00 4,500.00 3,000.00 3,000.00 2,700.00 2,700.00 604.52 RECONSTRUCTING/ADJUSTING DRAINAGE MANHOLES LF 4. 450.00 1,800.00 250.00 1,000.00 250.00 1,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 327. 13.00 4,251.00 14.00 4,578.00 14.00 4,578.00 605.79 UNDERDRAIN FLUSHING BASINS EA 2. 400.00 800.00 450.00 900.00 435.00 870.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 387.5 20.00 7,750.00 21.00 8,137.50 20.50 7,943.75 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 25. 25.00 625.00 26.00 650.00 25.75 643.75 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 2,000.00 8,000.00 2,300.00 9,200.00 2,250.00 9,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 660. 20.00 13,200.00 20.00 13,200.00 10.00 6,600.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,500.00 1,500.00 1,500.00 1,500.00 1,450.00 1,450.00 607.9 RESETTING RAILING AND FENCING LF 85. 20.00 1,700.00 22.00 1,870.00 25.00 2,125.00 13802 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.12 2" BITUMINOUS SIDEWALK (F) SY 340. 10.85 3,689.00 11.00 3,740.00 10.85 3,689.00 609.01 STRAIGHT GRANITE CURB LF 830. 19.00 15,770.00 16.00 13,280.00 22.50 18,675.00 609.02 CURVED GRANITE CURB LF 25. 28.00 700.00 25.00 625.00 32.50 812.50 609.5 RESET GRANITE CURB LF 20. 9.00 180.00 6.00 120.00 15.00 300.00 615.02 TRAFFIC SIGN TYPE B (F) SF 45.75 65.00 2,973.75 70.00 3,202.50 70.00 3,202.50 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 63. 75.00 4,725.00 110.00 6,930.00 110.00 6,930.00 615.03 TRAFFIC SIGN TYPE C (F) SF 37.25 45.00 1,676.25 60.00 2,235.00 60.00 2,235.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 6. 25.00 150.00 20.00 120.00 20.00 120.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 618.7 FLAGGERS HR 1,200. 20.00 24,000.00 23.50 28,200.00 25.00 30,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 10,000.00 10,000.00 15,000.00 15,000.00 16,500.00 16,500.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 500.00 10,000.00 500.00 10,000.00 375.00 7,500.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 24. 5.00 120.00 5.00 120.00 5.00 120.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 30.00 420.00 30.00 420.00 30.00 420.00 622.1 STEEL WITNESS MARKERS EA 6. 25.00 150.00 30.00 180.00 27.50 165.00 622.2 CONCRETE BOUNDS EA 3. 300.00 900.00 250.00 750.00 245.00 735.00 628.2 SAWED BITUMINOUS PAVEMENT LF 215. 3.00 645.00 5.00 1,075.00 6.50 1,397.50 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 134. 4.00 536.00 5.00 670.00 5.00 670.00 630.01 MOVING BUILDINGS U 1. 500.00 500.00 2,500.00 2,500.00 2,550.00 2,550.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 11,300. .18 2,034.00 .25 2,825.00 .25 2,825.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 1,150. .50 575.00 .60 690.00 .60 690.00 641. LOAM CY 165. 31.00 5,115.00 30.00 4,950.00 45.00 7,425.00 645.0001 TURBIDITY BARRIER LF 500. 17.50 8,750.00 14.00 7,000.00 18.50 9,250.00 645.2 MATTING FOR EROSION CONTROL SY 615. 1.65 1,014.75 2.00 1,230.00 1.65 1,014.75 645.3 EROSION STONE TON 100. 25.00 2,500.00 25.00 2,500.00 28.50 2,850.00 645.531 SILT FENCE LF 1,600. 3.00 4,800.00 2.00 3,200.00 2.50 4,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 5,000.00 5,000.00 2,000.00 2,000.00 8,650.00 8,650.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 65.00 6,500.00 90.00 9,000.00 100.00 10,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .6 2,100.00 1,260.00 2,100.00 1,260.00 2,100.00 1,260.00 647.1 HUMUS CY 131. 15.00 1,965.00 25.00 3,275.00 40.00 5,240.00 670.045 CONSTRUCT AND REMOVE DETOUR U 1. 190,000.00 190,000.00 100,000.00 100,000.00 84,000.00 84,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 2. 150.00 300.00 150.00 300.00 350.00 700.00 692. MOBILIZATION U 1. 138,500.00 138,500.00 220,000.00 220,000.00 192,311.55 192,311.55 698.13 FIELD OFFICE TYPE C MON 24. 1,000.00 24,000.00 1,000.00 24,000.00 1,075.00 25,800.00 13802 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 698.2 PHYSICAL TESTING LABORATORY MON 21. 200.00 4,200.00 250.00 5,250.00 1,325.00 27,825.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008. ALTERATIONS AND ADDITIONS AS NEEDED $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $2,056,788.15 $2,214,323.30 $2,250,711.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ALTON X-A000(480), 13802 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 11, 2007 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: NH ROUTE 28 BRIDGE OVER THE MERRYMEETING RIVER COMPLETION DATE: AUGUST 7, 2009 A E. D. SWETT, INC. 8 INDUST. PARK DR., CONCORD, NH 03301 $ 2,056,788.15 B WYMAN & SIMPSON, INC. PO BOX 40, RICHMOND, ME 04357 $ 2,214,323.30 C TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,250,711.00 D C P M CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,301,660.35 E ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,304,424.42 F EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $ 2,309,398.60 G R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 2,530,195.00 H R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,589,607.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .2 13,375.00 2,675.00 24,000.00 4,800.00 20,000.00 4,000.00 201.21 REMOVING SMALL TREES EA 10. 267.00 2,670.00 550.00 5,500.00 400.00 4,000.00 201.22 REMOVING LARGE TREES EA 2. 1,400.00 2,800.00 1,200.00 2,400.00 1,800.00 3,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 80. 9.00 720.00 25.00 2,000.00 10.00 800.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 300.00 300.00 350.00 350.00 300.00 300.00 202.6 CURB REMOVAL FOR STORAGE LF 63. 2.15 135.45 3.00 189.00 3.00 189.00 202.7 REMOVAL OF GUARDRAIL (F) LF 505. 3.00 1,515.00 4.00 2,020.00 3.00 1,515.00 203.1 COMMON EXCAVATION CY 3,575. 3.00 10,725.00 16.00 57,200.00 10.00 35,750.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 800.00 3,200.00 750.00 3,000.00 1,200.00 4,800.00 203.6 EMBANKMENT-IN-PLACE (F) CY 555. 2.00 1,110.00 6.00 3,330.00 9.00 4,995.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 50.00 2,500.00 50.00 2,500.00 15.00 750.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 151. 30.00 4,530.00 40.00 6,040.00 31.00 4,681.00 13802 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 211.11 VIBRATION MONITORING SERVICES HR 72. 75.00 5,400.00 95.00 6,840.00 90.00 6,480.00 214. FINE GRADING U 1. 3,500.00 3,500.00 18,000.00 18,000.00 9,000.00 9,000.00 304.1 SAND (F) CY 1,225. 10.00 12,250.00 20.00 24,500.00 16.00 19,600.00 304.2 GRAVEL (F) CY 1,100. 14.25 15,675.00 22.00 24,200.00 20.00 22,000.00 304.3 CRUSHED GRAVEL (F) CY 1,400. 16.00 22,400.00 26.00 36,400.00 27.00 37,800.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 105. 24.00 2,520.00 30.00 3,150.00 30.00 3,150.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 1,010. 65.00 65,650.00 73.30 74,033.00 65.00 65,650.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 52. 100.00 5,200.00 115.50 6,006.00 100.00 5,200.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 9. 100.00 900.00 236.25 2,126.25 125.00 1,125.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 575. 80.00 46,000.00 71.50 41,112.50 60.00 34,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 505. 10.00 5,050.00 10.50 5,302.50 20.00 10,100.00 501.1 TEMPORARY BRIDGE U 1. 180,000.00 180,000.00 109,000.00 109,000.00 150,000.00 150,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 110,000.00 110,000.00 40,000.00 40,000.00 50,000.00 50,000.00 503.201 COFFERDAMS U 1. 24,000.00 24,000.00 126,501.00 126,501.00 16,000.00 16,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 240,000.00 240,000.00 204,225.00 204,225.00 253,000.00 253,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 840. 15.00 12,600.00 25.00 21,000.00 20.00 16,800.00 506.2 STEEL SHEET PILING LB 188,000. 1.00 188,000.00 .98 184,240.00 1.22 229,360.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 52. 900.00 46,800.00 700.00 36,400.00 700.00 36,400.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 67. 250.00 16,750.00 350.00 23,450.00 265.00 17,755.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 280. 850.00 238,000.00 625.00 175,000.00 500.00 140,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 57. 275.00 15,675.00 325.00 18,525.00 265.00 15,105.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL CY 350. 200.00 70,000.00 185.00 64,750.00 175.00 61,250.00 528.3121 PRESTRESSED CONCRETE BRIDGE DECK, BUTTED DECK BEAMS (F) SF 1,742. 85.00 148,070.00 58.42 101,767.64 84.00 146,328.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 50. 65.00 3,250.00 50.00 2,500.00 100.00 5,000.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 9. 50.00 450.00 75.00 675.00 50.00 450.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 209. 25.00 5,225.00 28.00 5,852.00 25.00 5,225.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 56. 8.00 448.00 10.00 560.00 5.00 280.00 13802 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544. REINFORCING STEEL (F) LB 10,362. 1.00 10,362.00 1.00 10,362.00 1.30 13,470.60 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 26,272. 1.20 31,526.40 1.20 31,526.40 1.50 39,408.00 548.11 ELASTOMERIC BEARING PADS (F) EA 22. 200.00 4,400.00 130.00 2,860.00 210.00 4,620.00 559.41 ELASTOMERIC PLUG TYPE FLEXIBLE JOINT, 6 " WIDE (F) LF 67. 70.00 4,690.00 72.00 4,824.00 70.00 4,690.00 559.5 SILICONE JOINT SEALANT (F LF 115. 5.00 575.00 8.00 920.00 15.00 1,725.00 563.23 BRIDGE RAIL T3 (F) LF 229. 130.00 29,770.00 141.75 32,460.75 130.00 29,770.00 563.24 BRIDGE RAIL T4 (F) LF 196. 145.00 28,420.00 157.50 30,870.00 150.00 29,400.00 565.23 BRIDGE APPROACH RAIL T3 (F) LF 30. 165.00 4,950.00 184.00 5,520.00 165.00 4,950.00 565.24 BRIDGE APPROACH RAIL T4 (F) LF 59. 200.00 11,800.00 215.25 12,699.75 195.00 11,505.00 572.1 RECONSTRUCTING STONE WALL ONE STONE WIDE LF 40. 23.00 920.00 35.00 1,400.00 40.00 1,600.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 160. 30.00 4,800.00 45.00 7,200.00 42.00 6,720.00 585.3 STONE FILL, CLASS C CY 12. 45.00 540.00 37.00 444.00 46.00 552.00 585.4 STONE FILL, CLASS D CY 9. 45.00 405.00 45.00 405.00 50.00 450.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 270. 4.00 1,080.00 3.00 810.00 3.00 810.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 32. 10.00 320.00 4.00 128.00 2.50 80.00 603.00215 15" R.C. PIPE, 2000D LF 380. 42.00 15,960.00 50.00 19,000.00 37.00 14,060.00 603.34118 18" STEEL END SECTIONS EA 3. 150.00 450.00 200.00 600.00 250.00 750.00 603.43815 15" CORRUGATED PE PIPE LF 84. 29.00 2,436.00 45.00 3,780.00 30.00 2,520.00 604.0007 POLYETHYLENE LINER EA 9. 160.00 1,440.00 200.00 1,800.00 150.00 1,350.00 604.12 CATCH BASINS TYPE B U 8. 1,750.00 14,000.00 2,100.00 16,800.00 1,900.00 15,200.00 604.242 DROP INLETS TYPE D-B U 1. 1,570.00 1,570.00 1,250.00 1,250.00 1,200.00 1,200.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1. 2,600.00 2,600.00 3,200.00 3,200.00 4,500.00 4,500.00 604.52 RECONSTRUCTING/ADJUSTING DRAINAGE MANHOLES LF 4. 250.00 1,000.00 400.00 1,600.00 450.00 1,800.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 327. 14.00 4,578.00 18.00 5,886.00 13.00 4,251.00 605.79 UNDERDRAIN FLUSHING BASINS EA 2. 400.00 800.00 500.00 1,000.00 400.00 800.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 387.5 20.00 7,750.00 21.00 8,137.50 20.00 7,750.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 25. 25.00 625.00 26.25 656.25 25.00 625.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 2,000.00 8,000.00 1,995.00 7,980.00 1,900.00 7,600.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 660. 15.00 9,900.00 18.00 11,880.00 35.00 23,100.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,100.00 1,100.00 1,260.00 1,260.00 1,100.00 1,100.00 607.9 RESETTING RAILING AND FENCING LF 85. 25.00 2,125.00 23.00 1,955.00 25.00 2,125.00 13802 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.12 2" BITUMINOUS SIDEWALK (F) SY 340. 11.00 3,740.00 13.65 4,641.00 15.00 5,100.00 609.01 STRAIGHT GRANITE CURB LF 830. 16.00 13,280.00 16.75 13,902.50 20.00 16,600.00 609.02 CURVED GRANITE CURB LF 25. 25.00 625.00 26.25 656.25 50.00 1,250.00 609.5 RESET GRANITE CURB LF 20. 8.00 160.00 6.30 126.00 20.00 400.00 615.02 TRAFFIC SIGN TYPE B (F) SF 45.75 70.00 3,202.50 73.50 3,362.63 65.00 2,973.75 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 63. 110.00 6,930.00 115.50 7,276.50 75.00 4,725.00 615.03 TRAFFIC SIGN TYPE C (F) SF 37.25 60.00 2,235.00 63.00 2,346.75 45.00 1,676.25 615.06 TRAFFIC SIGN TYPE CC (F) SF 6. 20.00 120.00 21.00 126.00 25.00 150.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 618.7 FLAGGERS HR 1,200. 18.00 21,600.00 23.00 27,600.00 18.00 21,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 20,000.00 20,000.00 20,000.00 20,000.00 13,000.00 13,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 600.00 12,000.00 400.00 8,000.00 350.00 7,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 24. 5.00 120.00 5.25 126.00 6.00 144.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 30.00 420.00 31.00 434.00 50.00 700.00 622.1 STEEL WITNESS MARKERS EA 6. 25.00 150.00 26.25 157.50 30.00 180.00 622.2 CONCRETE BOUNDS EA 3. 350.00 1,050.00 256.00 768.00 350.00 1,050.00 628.2 SAWED BITUMINOUS PAVEMENT LF 215. 3.00 645.00 3.00 645.00 5.00 1,075.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 134. 3.00 402.00 3.00 402.00 4.00 536.00 630.01 MOVING BUILDINGS U 1. 2,500.00 2,500.00 1,000.00 1,000.00 1,500.00 1,500.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 11,300. .25 2,825.00 .26 2,938.00 .18 2,034.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 1,150. .60 690.00 .65 747.50 .50 575.00 641. LOAM CY 165. 35.00 5,775.00 28.00 4,620.00 31.00 5,115.00 645.0001 TURBIDITY BARRIER LF 500. 30.00 15,000.00 30.00 15,000.00 30.00 15,000.00 645.2 MATTING FOR EROSION CONTROL SY 615. 2.00 1,230.00 1.75 1,076.25 2.00 1,230.00 645.3 EROSION STONE TON 100. 35.00 3,500.00 32.00 3,200.00 25.00 2,500.00 645.531 SILT FENCE LF 1,600. 3.50 5,600.00 5.00 8,000.00 3.00 4,800.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,500.00 3,500.00 2,400.00 2,400.00 9,500.00 9,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 75.00 7,500.00 95.00 9,500.00 90.00 9,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .6 3,500.00 2,100.00 2,205.00 1,323.00 4,500.00 2,700.00 647.1 HUMUS CY 131. 25.00 3,275.00 35.00 4,585.00 15.00 1,965.00 670.045 CONSTRUCT AND REMOVE DETOUR U 1. 90,000.00 90,000.00 128,705.00 128,705.00 225,000.00 225,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 2. 250.00 500.00 175.00 350.00 250.00 500.00 692. MOBILIZATION U 1. 230,000.00 230,000.00 230,000.00 230,000.00 161,000.00 161,000.00 698.13 FIELD OFFICE TYPE C MON 24. 1,200.00 28,800.00 1,500.00 36,000.00 1,350.00 32,400.00 13802 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 698.2 PHYSICAL TESTING LABORATORY MON 21. 600.00 12,600.00 750.00 15,750.00 1,000.00 21,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008. ALTERATIONS AND ADDITIONS AS NEEDED $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $2,301,660.35 $2,304,424.42 $2,309,398.60 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ALTON X-A000(480), 13802 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 11, 2007 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: NH ROUTE 28 BRIDGE OVER THE MERRYMEETING RIVER COMPLETION DATE: AUGUST 7, 2009 A E. D. SWETT, INC. 8 INDUST. PARK DR., CONCORD, NH 03301 $ 2,056,788.15 B WYMAN & SIMPSON, INC. PO BOX 40, RICHMOND, ME 04357 $ 2,214,323.30 C TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,250,711.00 D C P M CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,301,660.35 E ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,304,424.42 F EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $ 2,309,398.60 G R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 2,530,195.00 H R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,589,607.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .2 40,000.00 8,000.00 10,000.00 2,000.00 201.21 REMOVING SMALL TREES EA 10. 350.00 3,500.00 400.00 4,000.00 201.22 REMOVING LARGE TREES EA 2. 1,000.00 2,000.00 600.00 1,200.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 80. 13.50 1,080.00 20.00 1,600.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 275.00 275.00 250.00 250.00 202.6 CURB REMOVAL FOR STORAGE LF 63. 3.25 204.75 3.00 189.00 202.7 REMOVAL OF GUARDRAIL (F) LF 505. 3.00 1,515.00 3.00 1,515.00 203.1 COMMON EXCAVATION CY 3,575. 15.00 53,625.00 7.50 26,812.50 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 2,750.00 11,000.00 1,800.00 7,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 555. 15.00 8,325.00 9.00 4,995.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 50.00 2,500.00 20.00 1,000.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 151. 60.00 9,060.00 40.00 6,040.00 13802 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 211.11 VIBRATION MONITORING SERVICES HR 72. 70.00 5,040.00 85.00 6,120.00 214. FINE GRADING U 1. 40,000.00 40,000.00 8,000.00 8,000.00 304.1 SAND (F) CY 1,225. 23.00 28,175.00 18.00 22,050.00 304.2 GRAVEL (F) CY 1,100. 28.00 30,800.00 20.00 22,000.00 304.3 CRUSHED GRAVEL (F) CY 1,400. 28.00 39,200.00 25.00 35,000.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 105. 30.00 3,150.00 30.00 3,150.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 1,010. 65.00 65,650.00 70.00 70,700.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 52. 95.00 4,940.00 110.00 5,720.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 9. 150.00 1,350.00 175.00 1,575.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 575. 65.00 37,375.00 70.00 40,250.00 417. COLD PLANING BITUMINOUS SURFACES SY 505. 12.50 6,312.50 6.00 3,030.00 501.1 TEMPORARY BRIDGE U 1. 92,000.00 92,000.00 200,000.00 200,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 90,000.00 90,000.00 503.201 COFFERDAMS U 1. 42,000.00 42,000.00 140,000.00 140,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 270,000.00 270,000.00 215,000.00 215,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 840. 15.75 13,230.00 15.00 12,600.00 506.2 STEEL SHEET PILING LB 188,000. 1.28 240,640.00 1.00 188,000.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 52. 490.00 25,480.00 900.00 46,800.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 67. 300.00 20,100.00 325.00 21,775.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 280. 840.00 235,200.00 900.00 252,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 57. 380.00 21,660.00 325.00 18,525.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL CY 350. 160.00 56,000.00 175.00 61,250.00 528.3121 PRESTRESSED CONCRETE BRIDGE DECK, BUTTED DECK BEAMS (F) SF 1,742. 70.00 121,940.00 80.00 139,360.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 50. 60.00 3,000.00 90.00 4,500.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 9. 40.00 360.00 25.00 225.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 209. 30.00 6,270.00 30.00 6,270.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 56. 7.00 392.00 10.00 560.00 13802 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544. REINFORCING STEEL (F) LB 10,362. 1.20 12,434.40 .90 9,325.80 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 26,272. 1.30 34,153.60 1.00 26,272.00 548.11 ELASTOMERIC BEARING PADS (F) EA 22. 200.00 4,400.00 350.00 7,700.00 559.41 ELASTOMERIC PLUG TYPE FLEXIBLE JOINT, 6 " WIDE (F) LF 67. 70.00 4,690.00 70.00 4,690.00 559.5 SILICONE JOINT SEALANT (F LF 115. 10.00 1,150.00 11.00 1,265.00 563.23 BRIDGE RAIL T3 (F) LF 229. 130.00 29,770.00 185.00 42,365.00 563.24 BRIDGE RAIL T4 (F) LF 196. 142.00 27,832.00 200.00 39,200.00 565.23 BRIDGE APPROACH RAIL T3 (F) LF 30. 160.00 4,800.00 190.00 5,700.00 565.24 BRIDGE APPROACH RAIL T4 (F) LF 59. 180.00 10,620.00 220.00 12,980.00 572.1 RECONSTRUCTING STONE WALL ONE STONE WIDE LF 40. 25.00 1,000.00 80.00 3,200.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 160. 60.00 9,600.00 30.00 4,800.00 585.3 STONE FILL, CLASS C CY 12. 60.00 720.00 30.00 360.00 585.4 STONE FILL, CLASS D CY 9. 70.00 630.00 40.00 360.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 270. 4.00 1,080.00 2.50 675.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 32. 4.00 128.00 2.50 80.00 603.00215 15" R.C. PIPE, 2000D LF 380. 51.00 19,380.00 50.00 19,000.00 603.34118 18" STEEL END SECTIONS EA 3. 210.00 630.00 280.00 840.00 603.43815 15" CORRUGATED PE PIPE LF 84. 44.00 3,696.00 40.00 3,360.00 604.0007 POLYETHYLENE LINER EA 9. 225.00 2,025.00 200.00 1,800.00 604.12 CATCH BASINS TYPE B U 8. 2,100.00 16,800.00 1,800.00 14,400.00 604.242 DROP INLETS TYPE D-B U 1. 1,700.00 1,700.00 1,250.00 1,250.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1. 3,600.00 3,600.00 6,500.00 6,500.00 604.52 RECONSTRUCTING/ADJUSTING DRAINAGE MANHOLES LF 4. 125.00 500.00 550.00 2,200.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 327. 22.00 7,194.00 16.00 5,232.00 605.79 UNDERDRAIN FLUSHING BASINS EA 2. 590.00 1,180.00 500.00 1,000.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 387.5 20.00 7,750.00 21.00 8,137.50 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 25. 25.00 625.00 27.00 675.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 2,200.00 8,800.00 2,250.00 9,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 660. 26.00 17,160.00 20.00 13,200.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,500.00 1,500.00 1,500.00 1,500.00 607.9 RESETTING RAILING AND FENCING LF 85. 22.00 1,870.00 24.00 2,040.00 13802 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 608.12 2" BITUMINOUS SIDEWALK (F) SY 340. 13.00 4,420.00 15.50 5,270.00 609.01 STRAIGHT GRANITE CURB LF 830. 15.00 12,450.00 21.60 17,928.00 609.02 CURVED GRANITE CURB LF 25. 22.00 550.00 30.00 750.00 609.5 RESET GRANITE CURB LF 20. 6.00 120.00 10.00 200.00 615.02 TRAFFIC SIGN TYPE B (F) SF 45.75 65.00 2,973.75 74.00 3,385.50 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 63. 75.00 4,725.00 116.00 7,308.00 615.03 TRAFFIC SIGN TYPE C (F) SF 37.25 45.00 1,676.25 63.00 2,346.75 615.06 TRAFFIC SIGN TYPE CC (F) SF 6. 25.00 150.00 22.00 132.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 618.7 FLAGGERS HR 1,200. 25.20 30,240.00 20.00 24,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 70,000.00 70,000.00 60,000.00 60,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 600.00 12,000.00 625.00 12,500.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 24. 4.00 96.00 6.00 144.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 28.00 392.00 30.00 420.00 622.1 STEEL WITNESS MARKERS EA 6. 28.00 168.00 28.50 171.00 622.2 CONCRETE BOUNDS EA 3. 250.00 750.00 250.00 750.00 628.2 SAWED BITUMINOUS PAVEMENT LF 215. 1.50 322.50 2.00 430.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 134. 1.50 201.00 10.00 1,340.00 630.01 MOVING BUILDINGS U 1. 2,500.00 2,500.00 5,000.00 5,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 11,300. .15 1,695.00 .30 3,390.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 1,150. .45 517.50 .65 747.50 641. LOAM CY 165. 26.00 4,290.00 30.00 4,950.00 645.0001 TURBIDITY BARRIER LF 500. 25.00 12,500.00 30.00 15,000.00 645.2 MATTING FOR EROSION CONTROL SY 615. 1.65 1,014.75 1.75 1,076.25 645.3 EROSION STONE TON 100. 40.00 4,000.00 30.00 3,000.00 645.531 SILT FENCE LF 1,600. 2.50 4,000.00 3.75 6,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 8,000.00 8,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 70.00 7,000.00 95.00 9,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .6 2,100.00 1,260.00 2,500.00 1,500.00 647.1 HUMUS CY 131. 26.00 3,406.00 30.00 3,930.00 670.045 CONSTRUCT AND REMOVE DETOUR U 1. 230,000.00 230,000.00 200,000.00 200,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 2. 175.00 350.00 160.00 320.00 692. MOBILIZATION U 1. 167,000.00 167,000.00 150,000.00 150,000.00 698.13 FIELD OFFICE TYPE C MON 24. 1,415.00 33,960.00 1,250.00 30,000.00 13802 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 698.2 PHYSICAL TESTING LABORATORY MON 21. 1,200.00 25,200.00 750.00 15,750.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008. ALTERATIONS AND ADDITIONS AS NEEDED $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 6,000.00 6,000.00 6,000.00 6,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $2,530,195.00 $2,589,607.80