THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WARREN X-A000(526), 13209 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 18, 2007 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 25 EAST OF THE WARREN/BENTON TOWN LINE COMPLETION DATE: OCTOBER 17, 2008 A F L MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,956,956.20 B R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 3,221,542.50 C WINTERSET INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 3,255,785.20 D MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., PO BOX 400, N HAVERHILL, NH 03774 $ 3,482,202.40 E R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 4,229,509.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA 1.1 29,000.00 31,900.00 25,000.00 27,500.00 21,000.00 23,100.00 201.21 REMOVING SMALL TREES EA 14. 380.00 5,320.00 350.00 4,900.00 360.00 5,040.00 201.22 REMOVING LARGE TREES EA 2. 1,300.00 2,600.00 500.00 1,000.00 780.00 1,560.00 202.42 REMOVAL OF EXISTING PIPE OVER 600 MM DIA. LM 25. 52.00 1,300.00 100.00 2,500.00 60.00 1,500.00 203.1 COMMON EXCAVATION M3 22,800. 6.70 152,760.00 9.00 205,200.00 11.00 250,800.00 203.2 ROCK EXCAVATION M3 1,100. 41.00 45,100.00 75.00 82,500.00 60.00 66,000.00 203.4 MUCK EXCAVATION M3 825. 10.00 8,250.00 10.00 8,250.00 14.00 11,550.00 203.5554 GUARDRAIL 15.2M EAGRT PLATFORM U 2. 1,990.00 3,980.00 1,650.00 3,300.00 1,200.00 2,400.00 203.6 EMBANKMENT-IN-PLACE (F) M3 22,900. 5.25 120,225.00 8.00 183,200.00 16.00 366,400.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 200. 32.00 6,400.00 25.00 5,000.00 67.00 13,400.00 206.2 ROCK STRUCTURE EXCAVATION M3 180. 110.00 19,800.00 150.00 27,000.00 180.00 32,400.00 209.1 GRANULAR BACKFILL M3 150. 30.00 4,500.00 28.00 4,200.00 43.00 6,450.00 211.11 VIBRATION MONITORING SERVICES HR 150. 93.00 13,950.00 75.00 11,250.00 94.00 14,100.00 214. FINE GRADING U 1. 26,390.00 26,390.00 75,000.00 75,000.00 42,000.00 42,000.00 304.1 SAND (F) M3 7,850. 15.50 121,675.00 17.00 133,450.00 17.00 133,450.00 304.2 GRAVEL (F) M3 7,800. 17.50 136,500.00 19.00 148,200.00 19.00 148,200.00 304.299 TEMPORARY GRAVEL M3 3,000. 28.00 84,000.00 30.00 90,000.00 21.00 63,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING T 180. 42.00 7,560.00 40.00 7,200.00 45.00 8,100.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 310. 36.50 11,315.00 40.00 12,400.00 39.00 12,090.00 13209 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.4 CRUSHED STONE (FINE GRADATION) (F) M3 3,800. 19.50 74,100.00 35.00 133,000.00 38.00 144,400.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) M3 3,550. 19.50 69,225.00 35.00 124,250.00 37.00 131,350.00 304.7 STREAM LINING GRAVEL M3 35. 74.00 2,590.00 59.00 2,065.00 140.00 4,900.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) T 6,050. 75.50 456,775.00 75.00 453,750.00 74.00 447,700.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 180. 120.00 21,600.00 125.00 22,500.00 115.00 20,700.00 403.6 PAVEMENT JOINT ADHESIVE LM 7,200. .80 5,760.00 .72 5,184.00 .75 5,400.00 417. COLD PLANING BITUMINOUS SURFACES M2 10,120. 3.35 33,902.00 3.25 32,890.00 3.10 31,372.00 520.0001 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 53,000.00 53,000.00 75,000.00 75,000.00 53,000.00 53,000.00 520.0002 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 49,000.00 49,000.00 75,000.00 75,000.00 55,000.00 55,000.00 520.0003 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 48,000.00 48,000.00 60,000.00 60,000.00 49,000.00 49,000.00 520.0004 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 35,500.00 35,500.00 40,000.00 40,000.00 41,000.00 41,000.00 520.1 CONCRETE CLASS A M3 20. 1,150.00 23,000.00 900.00 18,000.00 1,300.00 26,000.00 544.1 REINFORCING STEEL (ROADWAY) KG 115. 4.80 552.00 15.00 1,725.00 4.00 460.00 585.2 STONE FILL, CLASS B M3 150. 56.00 8,400.00 40.00 6,000.00 39.00 5,850.00 585.3 STONE FILL, CLASS C M3 325. 68.00 22,100.00 45.00 14,625.00 45.00 14,625.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 1,000. 5.70 5,700.00 3.00 3,000.00 3.00 3,000.00 603.00205 450 MM R.C. PIPE, CLASS III LM 100. 220.00 22,000.00 235.00 23,500.00 150.00 15,000.00 603.00206 600 MM R.C. PIPE, CLASS III LM 20. 290.00 5,800.00 300.00 6,000.00 225.00 4,500.00 603.00208 750 MM R.C. PIPE, CLASS III LM 20. 380.00 7,600.00 325.00 6,500.00 275.00 5,500.00 603.11003 300 MM CORR. STEEL PIPE, 1.63 MM LM 25. 145.00 3,625.00 130.00 3,250.00 136.00 3,400.00 603.11004 375 MM CORR. STEEL PIPE, 1.63 MM LM 25. 190.00 4,750.00 140.00 3,500.00 130.00 3,250.00 603.34106 600 MM STEEL END SECTION EA 4. 455.00 1,820.00 400.00 1,600.00 205.00 820.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 35. 112.00 3,920.00 175.00 6,125.00 100.00 3,500.00 604.0007 POLYETHYLENE LINER EA 3. 190.00 570.00 200.00 600.00 200.00 600.00 604.15 CATCH BASINS TYPE E U 3. 2,500.00 7,500.00 1,800.00 5,400.00 2,500.00 7,500.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LM 1. 880.00 880.00 1,200.00 1,200.00 700.00 700.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 1,700. 61.00 103,700.00 50.00 85,000.00 42.00 71,400.00 605.79 UNDERDRAIN FLUSHING BASINS EA 20. 550.00 11,000.00 200.00 4,000.00 410.00 8,200.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LM 30. 79.00 2,370.00 31.00 930.00 334.00 10,020.00 13209 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 520. 63.00 32,760.00 65.00 33,800.00 64.00 33,280.00 606.1454 BEAM GUARDRAIL (TERM. UNIT EAGRT (15.2M) U 4. 2,300.00 9,200.00 2,650.00 10,600.00 2,300.00 9,200.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 2. 1,200.00 2,400.00 1,550.00 3,100.00 1,250.00 2,500.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LM 470. 92.00 43,240.00 90.00 42,300.00 68.00 31,960.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 17. 190.00 3,230.00 60.00 1,020.00 150.00 2,550.00 615.02 TRAFFIC SIGN TYPE B (F) M2 3.96 400.00 1,584.00 950.00 3,762.00 930.00 3,682.80 615.03 TRAFFIC SIGN TYPE C (F) M2 13.86 400.00 5,544.00 675.00 9,355.50 650.00 9,009.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 1.08 190.00 205.20 275.00 297.00 280.00 302.40 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 618.7 FLAGGERS HR 6,500. 27.00 175,500.00 18.00 117,000.00 25.00 162,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 65,000.00 65,000.00 125,000.00 125,000.00 70,000.00 70,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 11,000.00 22,000.00 12,500.00 25,000.00 13,000.00 26,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 25. 38.00 950.00 5.00 125.00 5.00 125.00 621.31 SINGLE DELINEATOR WITH POST EA 140. 38.00 5,320.00 30.00 4,200.00 31.00 4,340.00 622.1 STEEL WITNESS MARKERS EA 50. 38.00 1,900.00 25.00 1,250.00 26.00 1,300.00 622.2 CONCRETE BOUNDS EA 37. 430.00 15,910.00 250.00 9,250.00 290.00 10,730.00 628.2 SAWED BITUMINOUS PAVEMENT LM 110. 9.00 990.00 7.00 770.00 8.00 880.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 25,200. 2.00 50,400.00 .40 10,080.00 .40 10,080.00 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 40. 36.00 1,440.00 15.00 600.00 13.00 520.00 644.21 SCRUB/SHRUB WETLAND SEED MIX KG 12. 244.00 2,928.00 175.00 2,100.00 70.00 840.00 645.12 TEMPORARY MULCH HA 1.26 9,000.00 11,340.00 2,850.00 3,591.00 1,800.00 2,268.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) M2 1,200. 3.90 4,680.00 2.20 2,640.00 3.00 3,600.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) M2 1,825. 3.90 7,117.50 3.00 5,475.00 3.00 5,475.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 125. 3.90 487.50 3.00 375.00 4.00 500.00 645.3 EROSION STONE T 600. 45.00 27,000.00 30.00 18,000.00 45.00 27,000.00 645.531 SILT FENCE LM 3,300. 10.00 33,000.00 12.00 39,600.00 8.00 26,400.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,700.00 2,700.00 12,000.00 12,000.00 4,000.00 4,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 100. 110.00 11,000.00 100.00 10,000.00 50.00 5,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 3.27 3,800.00 12,426.00 4,400.00 14,388.00 3,800.00 12,426.00 13209 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS M3 5,960. 13.50 80,460.00 12.00 71,520.00 15.00 89,400.00 670.0461 CONSTRUCT & REMOVE TEMP. WIDENINGS U 1. 22,000.00 22,000.00 25,000.00 25,000.00 16,000.00 16,000.00 670.0462 CONSTRUCT & REMOVE TEMP WIDENINGS U 1. 22,000.00 22,000.00 18,000.00 18,000.00 10,000.00 10,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 220.00 880.00 200.00 800.00 150.00 600.00 670.105 TEMPORARY PORTABLE LIGHTING UWK 10. 11,000.00 110,000.00 1,000.00 10,000.00 750.00 7,500.00 692. MOBILIZATION U 1. 135,000.00 135,000.00 225,000.00 225,000.00 175,000.00 175,000.00 698.13 FIELD OFFICE TYPE C MON 13. 2,700.00 35,100.00 1,400.00 18,200.00 1,350.00 17,550.00 698.2 PHYSICAL TESTING LABORATORY MON 6. 2,700.00 16,200.00 650.00 3,900.00 1,130.00 6,780.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1008.12 ALTERATIONS AND ADDITIONS AS NEEDED-HISTORIC/ARCH- AEOLOGICAL DOCUMENTATION $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 8,800.00 8,800.00 8,800.00 8,800.00 8,800.00 8,800.00 $2,956,956.20 $3,221,542.50 $3,255,785.20 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WARREN X-A000(526), 13209 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 18, 2007 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 25 EAST OF THE WARREN/BENTON TOWN LINE COMPLETION DATE: OCTOBER 17, 2008 A F L MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,956,956.20 B R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 3,221,542.50 C WINTERSET INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 3,255,785.20 D MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., PO BOX 400, N HAVERHILL, NH 03774 $ 3,482,202.40 E R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 4,229,509.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA 1.1 15,000.00 16,500.00 20,000.00 22,000.00 201.21 REMOVING SMALL TREES EA 14. 125.00 1,750.00 300.00 4,200.00 201.22 REMOVING LARGE TREES EA 2. 600.00 1,200.00 650.00 1,300.00 202.42 REMOVAL OF EXISTING PIPE OVER 600 MM DIA. LM 25. 98.00 2,450.00 75.00 1,875.00 203.1 COMMON EXCAVATION M3 22,800. 9.20 209,760.00 17.50 399,000.00 203.2 ROCK EXCAVATION M3 1,100. 72.00 79,200.00 75.00 82,500.00 203.4 MUCK EXCAVATION M3 825. 12.00 9,900.00 17.50 14,437.50 203.5554 GUARDRAIL 15.2M EAGRT PLATFORM U 2. 2,200.00 4,400.00 2,800.00 5,600.00 203.6 EMBANKMENT-IN-PLACE (F) M3 22,900. 9.80 224,420.00 10.10 231,290.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 200. 40.00 8,000.00 65.00 13,000.00 206.2 ROCK STRUCTURE EXCAVATION M3 180. 165.00 29,700.00 250.00 45,000.00 209.1 GRANULAR BACKFILL M3 150. 33.00 4,950.00 40.00 6,000.00 211.11 VIBRATION MONITORING SERVICES HR 150. 105.00 15,750.00 75.00 11,250.00 214. FINE GRADING U 1. 75,000.00 75,000.00 135,000.00 135,000.00 304.1 SAND (F) M3 7,850. 24.00 188,400.00 32.00 251,200.00 304.2 GRAVEL (F) M3 7,800. 25.00 195,000.00 32.00 249,600.00 304.299 TEMPORARY GRAVEL M3 3,000. 28.00 84,000.00 32.00 96,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING T 180. 35.00 6,300.00 42.00 7,560.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 310. 50.00 15,500.00 42.00 13,020.00 13209 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.4 CRUSHED STONE (FINE GRADATION) (F) M3 3,800. 42.00 159,600.00 44.00 167,200.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) M3 3,550. 41.00 145,550.00 44.00 156,200.00 304.7 STREAM LINING GRAVEL M3 35. 245.00 8,575.00 60.00 2,100.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) T 6,050. 75.00 453,750.00 72.00 435,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 180. 112.00 20,160.00 120.00 21,600.00 403.6 PAVEMENT JOINT ADHESIVE LM 7,200. .76 5,472.00 1.00 7,200.00 417. COLD PLANING BITUMINOUS SURFACES M2 10,120. 3.10 31,372.00 2.80 28,336.00 520.0001 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 52,000.00 52,000.00 52,000.00 52,000.00 520.0002 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 49,000.00 49,000.00 55,000.00 55,000.00 520.0003 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 47,000.00 47,000.00 52,000.00 52,000.00 520.0004 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 33,000.00 33,000.00 41,000.00 41,000.00 520.1 CONCRETE CLASS A M3 20. 650.00 13,000.00 1,400.00 28,000.00 544.1 REINFORCING STEEL (ROADWAY) KG 115. 4.00 460.00 4.80 552.00 585.2 STONE FILL, CLASS B M3 150. 53.00 7,950.00 70.00 10,500.00 585.3 STONE FILL, CLASS C M3 325. 59.00 19,175.00 55.00 17,875.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 1,000. 3.60 3,600.00 4.50 4,500.00 603.00205 450 MM R.C. PIPE, CLASS III LM 100. 290.00 29,000.00 175.00 17,500.00 603.00206 600 MM R.C. PIPE, CLASS III LM 20. 320.00 6,400.00 215.00 4,300.00 603.00208 750 MM R.C. PIPE, CLASS III LM 20. 360.00 7,200.00 275.00 5,500.00 603.11003 300 MM CORR. STEEL PIPE, 1.63 MM LM 25. 180.00 4,500.00 140.00 3,500.00 603.11004 375 MM CORR. STEEL PIPE, 1.63 MM LM 25. 195.00 4,875.00 150.00 3,750.00 603.34106 600 MM STEEL END SECTION EA 4. 400.00 1,600.00 250.00 1,000.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 35. 150.00 5,250.00 140.00 4,900.00 604.0007 POLYETHYLENE LINER EA 3. 275.00 825.00 255.00 765.00 604.15 CATCH BASINS TYPE E U 3. 1,800.00 5,400.00 2,300.00 6,900.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LM 1. 690.00 690.00 900.00 900.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 1,700. 127.00 215,900.00 65.00 110,500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 20. 750.00 15,000.00 600.00 12,000.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LM 30. 35.00 1,050.00 30.00 900.00 13209 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 520. 60.00 31,200.00 60.00 31,200.00 606.1454 BEAM GUARDRAIL (TERM. UNIT EAGRT (15.2M) U 4. 2,700.00 10,800.00 2,500.00 10,000.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 2. 1,500.00 3,000.00 1,500.00 3,000.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LM 470. 65.00 30,550.00 125.00 58,750.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 17. 175.00 2,975.00 180.00 3,060.00 615.02 TRAFFIC SIGN TYPE B (F) M2 3.96 962.00 3,809.52 900.00 3,564.00 615.03 TRAFFIC SIGN TYPE C (F) M2 13.86 678.00 9,397.08 650.00 9,009.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 1.08 285.00 307.80 300.00 324.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,500.00 5,500.00 5,500.00 5,500.00 618.7 FLAGGERS HR 6,500. 23.00 149,500.00 17.00 110,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 65,000.00 65,000.00 147,000.00 147,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 6,000.00 12,000.00 17,000.00 34,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 25. 6.00 150.00 5.00 125.00 621.31 SINGLE DELINEATOR WITH POST EA 140. 30.00 4,200.00 28.00 3,920.00 622.1 STEEL WITNESS MARKERS EA 50. 27.00 1,350.00 28.00 1,400.00 622.2 CONCRETE BOUNDS EA 37. 275.00 10,175.00 250.00 9,250.00 628.2 SAWED BITUMINOUS PAVEMENT LM 110. 11.50 1,265.00 6.00 660.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 25,200. .43 10,836.00 .50 12,600.00 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 40. 13.65 546.00 23.50 940.00 644.21 SCRUB/SHRUB WETLAND SEED MIX KG 12. 440.00 5,280.00 200.00 2,400.00 645.12 TEMPORARY MULCH HA 1.26 6,200.00 7,812.00 2,500.00 3,150.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) M2 1,200. 2.40 2,880.00 1.50 1,800.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) M2 1,825. 3.60 6,570.00 1.80 3,285.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 125. 3.00 375.00 1.90 237.50 645.3 EROSION STONE T 600. 28.00 16,800.00 50.00 30,000.00 645.531 SILT FENCE LM 3,300. 11.50 37,950.00 8.50 28,050.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,575.00 3,575.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 100. 88.00 8,800.00 65.00 6,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 3.27 11,500.00 37,605.00 3,350.00 10,954.50 13209 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS M3 5,960. 18.50 110,260.00 42.00 250,320.00 670.0461 CONSTRUCT & REMOVE TEMP. WIDENINGS U 1. 5,000.00 5,000.00 120,000.00 120,000.00 670.0462 CONSTRUCT & REMOVE TEMP WIDENINGS U 1. 5,000.00 5,000.00 95,000.00 95,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 350.00 1,400.00 175.00 700.00 670.105 TEMPORARY PORTABLE LIGHTING UWK 10. 350.00 3,500.00 500.00 5,000.00 692. MOBILIZATION U 1. 250,000.00 250,000.00 266,000.00 266,000.00 698.13 FIELD OFFICE TYPE C MON 13. 1,000.00 13,000.00 1,600.00 20,800.00 698.2 PHYSICAL TESTING LABORATORY MON 6. 500.00 3,000.00 800.00 4,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 1008.12 ALTERATIONS AND ADDITIONS AS NEEDED-HISTORIC/ARCH- AEOLOGICAL DOCUMENTATION $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 8,800.00 8,800.00 8,800.00 8,800.00 $3,482,202.40 $4,229,509.50