THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BEDFORD-MANCHESTER-LONDONDERRY-MERRIMACK A000 (255), 11512D COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 13, 2007 SCOPE OF WORK: ROADWAY AND BRIDGE WORK LOCATION: MANCHESTER AIRPORT ACCESS ROAD COMPLETION DATE: NOVEMBER 13, 2009 A E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $12,661,218.00 B BECK & BELLUCCI, INC. PO BOX 429, 10 SALISBURY RD., FRANKLIN, NH 03235 $13,147,779.23 C EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $14,164,114.99 D R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $14,682,544.39 E SPS NEW ENGLAND, INC. 98 ELM STREET, SALISBURY, MA 01952 $14,899,626.00 F THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $14,976,538.40 G MTG COPRATION, INC. ONC ACTON PLACE, SUITE 200, ACTON, MA 01720 $17,937,550.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .53 1,700.00 901.00 3,090.00 1,637.70 5,000.00 2,650.00 201.1 CLEARING AND GRUBBING (F) A 7.72 5,350.00 41,302.00 9,167.00 70,769.24 5,000.00 38,600.00 201.6 CLEARING FOR FENCE LINES (F) A .09 6,000.00 540.00 5,150.00 463.50 10,000.00 900.00 203.1 COMMON EXCAVATION CY 49,900. 3.50 174,650.00 2.83 141,217.00 5.00 249,500.00 203.2 ROCK EXCAVATION CY 440. 15.00 6,600.00 15.45 6,798.00 30.00 13,200.00 203.4 MUCK EXCAVATION CY 2,300. 6.75 15,525.00 5.76 13,248.00 12.00 27,600.00 203.6 EMBANKMENT-IN-PLACE (F) CY 309,301. 6.50 2,010,456.50 6.90 2,134,176.90 10.00 3,093,010.00 203.61 MODIFIED EMBANKMENT-IN- PLACE CY 60,300. 8.60 518,580.00 8.00 482,400.00 10.00 603,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 440. 10.00 4,400.00 15.45 6,798.00 10.00 4,400.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 100. 25.00 2,500.00 20.60 2,060.00 25.00 2,500.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 550. 10.00 5,500.00 10.30 5,665.00 25.00 13,750.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 3,320. 32.00 106,240.00 27.20 90,304.00 22.00 73,040.00 210.1 SETTLEMENT PLATFORMS EA 2. 1,500.00 3,000.00 824.00 1,648.00 1,000.00 2,000.00 214. FINE GRADING U 1. 150,000.00 150,000.00 79,310.00 79,310.00 25,000.00 25,000.00 304.102 ADDITIONAL SAND CY 37,600. 12.00 451,200.00 8.40 315,840.00 10.00 376,000.00 11512D PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 200,000.00 200,000.00 167,250.00 167,250.00 280,000.00 280,000.00 503.201 COFFERDAMS U 1. 100,000.00 100,000.00 165,000.00 165,000.00 355,000.00 355,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,790. 20.00 115,800.00 8.65 50,083.50 16.00 92,640.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 35. 100.00 3,500.00 165.00 5,775.00 300.00 10,500.00 508. STRUCTURAL FILL CY 2,550. 32.00 81,600.00 34.00 86,700.00 22.00 56,100.00 510.1 PILE DRIVING EQUIPMENT U 1. 50,000.00 50,000.00 49,000.00 49,000.00 44,500.00 44,500.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 207,230. .50 103,615.00 .76 157,494.80 .56 116,048.80 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 46. 200.00 9,200.00 200.00 9,200.00 400.00 18,400.00 510.9 PILE SPLICES EA 46. 200.00 9,200.00 200.00 9,200.00 300.00 13,800.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 180. 300.00 54,000.00 340.00 61,200.00 230.00 41,400.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 545. 500.00 272,500.00 456.00 248,520.00 538.00 293,210.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 1,600. 600.00 960,000.00 568.00 908,800.00 517.00 827,200.00 520.210 CONCRETE CLASS B, SUB-FOOTINGS CY 915. 100.00 91,500.00 188.00 172,020.00 150.00 137,250.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 1,575. 300.00 472,500.00 206.50 325,237.50 158.00 248,850.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 1,685. 500.00 842,500.00 751.00 1,265,435.00 670.00 1,128,950.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 180. 100.00 18,000.00 60.00 10,800.00 90.00 16,200.00 536.11 EPOXY COATING FOR CONCRETE (F) SF 2,410. 10.00 24,100.00 8.66 20,870.60 10.00 24,100.00 537. CONCRETE SEALER (F) SF 23,760. 1.00 23,760.00 .50 11,880.00 1.00 23,760.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 76. 50.00 3,800.00 40.00 3,040.00 40.00 3,040.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 202. 4.00 808.00 4.00 808.00 5.00 1,010.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 42. 4.00 168.00 4.00 168.00 5.00 210.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 87. 7.00 609.00 7.00 609.00 5.00 435.00 544. REINFORCING STEEL (F) LB 508,261. 1.00 508,261.00 .84 426,939.24 .80 406,608.80 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 539,183. 1.00 539,183.00 .97 523,007.51 .58 312,726.14 547. SHEAR CONNECTORS (F) EA 12,197. 2.50 30,492.50 2.92 35,615.24 3.25 39,640.25 550.1 STRUCTURAL STEEL (F) LB 1,529,000. 1.67 2,553,430.00 1.70 2,599,300.00 1.79 2,736,910.00 550.210 BRIDGE SHOES (F) EA 40. 4,000.00 160,000.00 3,800.00 152,000.00 3,340.00 133,600.00 559.5 SILICONE JOINT SEALANT (F LF 100. 20.00 2,000.00 10.00 1,000.00 10.00 1,000.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 210. 500.00 105,000.00 472.00 99,120.00 460.00 96,600.00 563.22 BRIDGE RAIL T2 (F) LF 870.5 100.00 87,050.00 91.00 79,215.50 88.00 76,604.00 11512D PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 564. BRIDGE LIGHTING SYSTEM U 1. 5,000.00 5,000.00 5,775.00 5,775.00 30,500.00 30,500.00 585.2 STONE FILL, CLASS B CY 390. 30.00 11,700.00 30.90 12,051.00 35.00 13,650.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 1,850. 40.00 74,000.00 28.84 53,354.00 35.00 64,750.00 585.3 STONE FILL, CLASS C CY 41. 35.00 1,435.00 51.50 2,111.50 50.00 2,050.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 3,200. 3.00 9,600.00 2.16 6,912.00 2.60 8,320.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 730. 3.00 2,190.00 2.50 1,825.00 2.60 1,898.00 603.00212 12" R.C. PIPE, 2000D LF 32. 33.00 1,056.00 41.20 1,318.40 50.00 1,600.00 603.00215 15" R.C. PIPE, 2000D LF 2,300. 36.00 82,800.00 33.00 75,900.00 40.00 92,000.00 603.00218 18" R.C. PIPE, 2000D LF 460. 39.00 17,940.00 37.00 17,020.00 55.00 25,300.00 603.00224 24" R.C. PIPE, 2000D LF 1,500. 44.00 66,000.00 43.25 64,875.00 62.00 93,000.00 603.00230 30" R.C. PIPE, 2000D LF 440. 65.00 28,600.00 57.70 25,388.00 72.00 31,680.00 603.00330 30" R.C. PIPE, 3000D LF 52. 100.00 5,200.00 87.55 4,552.60 82.00 4,264.00 603.30115 15" R.C. END SECTIONS EA 1. 650.00 650.00 721.00 721.00 500.00 500.00 603.30118 18" R.C. END SECTIONS EA 2. 700.00 1,400.00 773.00 1,546.00 550.00 1,100.00 603.30124 24" R.C. END SECTIONS EA 2. 900.00 1,800.00 927.00 1,854.00 600.00 1,200.00 603.36115 15" ALUMNIZED STEEL END SECTIONS EA 2. 400.00 800.00 180.00 360.00 300.00 600.00 604.0007 POLYETHYLENE LINER EA 28. 150.00 4,200.00 283.00 7,924.00 150.00 4,200.00 604.12 CATCH BASINS TYPE B U 33. 1,360.00 44,880.00 1,725.00 56,925.00 1,800.00 59,400.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 8. 2,200.00 17,600.00 2,266.00 18,128.00 2,400.00 19,200.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 2,800.00 5,600.00 3,090.00 6,180.00 3,200.00 6,400.00 604.15 CATCH BASINS TYPE E U 10. 1,500.00 15,000.00 2,060.00 20,600.00 2,000.00 20,000.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 4. 2,300.00 9,200.00 2,390.00 9,560.00 2,400.00 9,600.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 3. 3,000.00 9,000.00 3,300.00 9,900.00 3,500.00 10,500.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,900. 16.40 31,160.00 14.50 27,550.00 20.00 38,000.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 4,800. 21.00 100,800.00 21.25 102,000.00 20.60 98,880.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 28. 224.00 6,272.00 130.00 3,640.00 125.00 3,500.00 614.3459 4 INCH 5-DUCT STEEL CONDUIT (BRIDGE) LF 490. 75.00 36,750.00 93.00 45,570.00 107.00 52,430.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 618.7 FLAGGERS HR 1,100. 24.00 26,400.00 23.69 26,059.00 22.00 24,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 20,000.00 20,000.00 77,250.00 77,250.00 25,000.00 25,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 25. 100.00 2,500.00 412.00 10,300.00 500.00 12,500.00 622.1 STEEL WITNESS MARKERS EA 14. 28.00 392.00 26.25 367.50 25.00 350.00 622.2 CONCRETE BOUNDS EA 28. 224.00 6,272.00 278.25 7,791.00 250.00 7,000.00 625.52 LIGHT POLE (HIGHWAY) U 1. 2,000.00 2,000.00 2,060.00 2,060.00 2,000.00 2,000.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 5. 900.00 4,500.00 930.00 4,650.00 500.00 2,500.00 11512D PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,500. 1.75 2,625.00 1.80 2,700.00 2.00 3,000.00 645.26 FLEXIBLE GROWTH MEDIUM SY 2,900. 1.00 2,900.00 1.05 3,045.00 2.00 5,800.00 645.3 EROSION STONE TON 200. 30.00 6,000.00 26.00 5,200.00 35.00 7,000.00 645.531 SILT FENCE LF 8,400. 3.00 25,200.00 2.83 23,772.00 3.00 25,200.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 5,000.00 5,000.00 3,300.00 3,300.00 3,500.00 3,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 60.00 12,000.00 57.00 11,400.00 55.00 11,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 25. 1,425.00 35,625.00 1,520.00 38,000.00 1,900.00 47,500.00 647.1 HUMUS CY 5,400. 10.00 54,000.00 13.40 72,360.00 15.00 81,000.00 692. MOBILIZATION U 1. 600,000.00 600,000.00 931,000.00 931,000.00 785,000.00 785,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 698.14 FIELD OFFICE TYPE D MON 24. 1,000.00 24,000.00 840.00 20,160.00 1,600.00 38,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 $12,661,218.00 $13,147,779.23 $14,164,114.99 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BEDFORD-MANCHESTER-LONDONDERRY-MERRIMACK A000 (255), 11512D COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 13, 2007 SCOPE OF WORK: ROADWAY AND BRIDGE WORK LOCATION: MANCHESTER AIRPORT ACCESS ROAD COMPLETION DATE: NOVEMBER 13, 2009 A E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $12,661,218.00 B BECK & BELLUCCI, INC. PO BOX 429, 10 SALISBURY RD., FRANKLIN, NH 03235 $13,147,779.23 C EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $14,164,114.99 D R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $14,682,544.39 E SPS NEW ENGLAND, INC. 98 ELM STREET, SALISBURY, MA 01952 $14,899,626.00 F THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $14,976,538.40 G MTG COPRATION, INC. ONC ACTON PLACE, SUITE 200, ACTON, MA 01720 $17,937,550.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .53 2,500.00 1,325.00 5,000.00 2,650.00 4,000.00 2,120.00 201.1 CLEARING AND GRUBBING (F) A 7.72 9,500.00 73,340.00 7,500.00 57,900.00 6,000.00 46,320.00 201.6 CLEARING FOR FENCE LINES (F) A .09 5,000.00 450.00 5,000.00 450.00 4,000.00 360.00 203.1 COMMON EXCAVATION CY 49,900. 4.00 199,600.00 5.00 249,500.00 2.30 114,770.00 203.2 ROCK EXCAVATION CY 440. 20.00 8,800.00 120.00 52,800.00 22.00 9,680.00 203.4 MUCK EXCAVATION CY 2,300. 8.00 18,400.00 11.00 25,300.00 15.00 34,500.00 203.6 EMBANKMENT-IN-PLACE (F) CY 309,301. 11.00 3,402,311.00 10.50 3,247,660.50 10.00 3,093,010.00 203.61 MODIFIED EMBANKMENT-IN- PLACE CY 60,300. 14.00 844,200.00 11.00 663,300.00 12.00 723,600.00 206.1 COMMON STRUCTURE EXCAVATION CY 440. 11.00 4,840.00 13.00 5,720.00 12.00 5,280.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 100. 50.00 5,000.00 26.00 2,600.00 80.00 8,000.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 550. 12.00 6,600.00 8.00 4,400.00 12.00 6,600.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 3,320. 33.00 109,560.00 22.00 73,040.00 24.00 79,680.00 210.1 SETTLEMENT PLATFORMS EA 2. 700.00 1,400.00 1,500.00 3,000.00 800.00 1,600.00 214. FINE GRADING U 1. 51,000.00 51,000.00 21,000.00 21,000.00 30,000.00 30,000.00 304.102 ADDITIONAL SAND CY 37,600. 11.00 413,600.00 .01 376.00 12.00 451,200.00 11512D PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 247,000.00 247,000.00 175,000.00 175,000.00 220,000.00 220,000.00 503.201 COFFERDAMS U 1. 382,000.00 382,000.00 475,000.00 475,000.00 400,000.00 400,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,790. 15.00 86,850.00 20.00 115,800.00 7.00 40,530.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 35. 80.00 2,800.00 125.00 4,375.00 140.00 4,900.00 508. STRUCTURAL FILL CY 2,550. 37.00 94,350.00 25.00 63,750.00 28.00 71,400.00 510.1 PILE DRIVING EQUIPMENT U 1. 50,000.00 50,000.00 50,000.00 50,000.00 55,000.00 55,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 207,230. .56 116,048.80 .60 124,338.00 .60 124,338.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 46. 400.00 18,400.00 400.00 18,400.00 400.00 18,400.00 510.9 PILE SPLICES EA 46. 300.00 13,800.00 300.00 13,800.00 300.00 13,800.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 180. 310.00 55,800.00 200.00 36,000.00 220.00 39,600.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 545. 440.00 239,800.00 640.00 348,800.00 500.00 272,500.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 1,600. 560.00 896,000.00 535.00 856,000.00 550.00 880,000.00 520.210 CONCRETE CLASS B, SUB-FOOTINGS CY 915. 125.00 114,375.00 170.00 155,550.00 120.00 109,800.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 1,575. 215.00 338,625.00 210.00 330,750.00 200.00 315,000.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 1,685. 610.00 1,027,850.00 700.00 1,179,500.00 740.00 1,246,900.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 180. 75.00 13,500.00 60.00 10,800.00 75.00 13,500.00 536.11 EPOXY COATING FOR CONCRETE (F) SF 2,410. 8.25 19,882.50 6.00 14,460.00 10.00 24,100.00 537. CONCRETE SEALER (F) SF 23,760. 1.00 23,760.00 .50 11,880.00 1.50 35,640.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 76. 40.00 3,040.00 18.00 1,368.00 45.00 3,420.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 202. 5.00 1,010.00 4.00 808.00 5.00 1,010.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 42. 5.00 210.00 7.00 294.00 7.00 294.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 87. 8.00 696.00 9.00 783.00 10.00 870.00 544. REINFORCING STEEL (F) LB 508,261. 1.20 609,913.20 1.00 508,261.00 1.00 508,261.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 539,183. 1.08 582,317.64 1.00 539,183.00 .80 431,346.40 547. SHEAR CONNECTORS (F) EA 12,197. 2.75 33,541.75 2.00 24,394.00 3.00 36,591.00 550.1 STRUCTURAL STEEL (F) LB 1,529,000. 1.63 2,492,270.00 2.00 3,058,000.00 1.80 2,752,200.00 550.210 BRIDGE SHOES (F) EA 40. 3,600.00 144,000.00 3,500.00 140,000.00 3,750.00 150,000.00 559.5 SILICONE JOINT SEALANT (F LF 100. 10.00 1,000.00 10.00 1,000.00 12.00 1,200.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 210. 425.00 89,250.00 385.00 80,850.00 420.00 88,200.00 563.22 BRIDGE RAIL T2 (F) LF 870.5 89.00 77,474.50 95.00 82,697.50 220.00 191,510.00 11512D PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 564. BRIDGE LIGHTING SYSTEM U 1. 5,000.00 5,000.00 6,000.00 6,000.00 7,000.00 7,000.00 585.2 STONE FILL, CLASS B CY 390. 30.00 11,700.00 26.00 10,140.00 37.00 14,430.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 1,850. 31.00 57,350.00 26.00 48,100.00 40.00 74,000.00 585.3 STONE FILL, CLASS C CY 41. 39.00 1,599.00 26.00 1,066.00 74.00 3,034.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 3,200. 3.00 9,600.00 2.30 7,360.00 1.10 3,520.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 730. 3.00 2,190.00 2.30 1,679.00 1.80 1,314.00 603.00212 12" R.C. PIPE, 2000D LF 32. 35.00 1,120.00 35.00 1,120.00 45.00 1,440.00 603.00215 15" R.C. PIPE, 2000D LF 2,300. 37.00 85,100.00 40.00 92,000.00 46.00 105,800.00 603.00218 18" R.C. PIPE, 2000D LF 460. 42.00 19,320.00 50.00 23,000.00 56.00 25,760.00 603.00224 24" R.C. PIPE, 2000D LF 1,500. 50.00 75,000.00 60.00 90,000.00 74.00 111,000.00 603.00230 30" R.C. PIPE, 2000D LF 440. 65.00 28,600.00 70.00 30,800.00 80.00 35,200.00 603.00330 30" R.C. PIPE, 3000D LF 52. 70.00 3,640.00 70.00 3,640.00 100.00 5,200.00 603.30115 15" R.C. END SECTIONS EA 1. 520.00 520.00 450.00 450.00 550.00 550.00 603.30118 18" R.C. END SECTIONS EA 2. 640.00 1,280.00 500.00 1,000.00 600.00 1,200.00 603.30124 24" R.C. END SECTIONS EA 2. 775.00 1,550.00 650.00 1,300.00 700.00 1,400.00 603.36115 15" ALUMNIZED STEEL END SECTIONS EA 2. 360.00 720.00 450.00 900.00 400.00 800.00 604.0007 POLYETHYLENE LINER EA 28. 225.00 6,300.00 230.00 6,440.00 225.00 6,300.00 604.12 CATCH BASINS TYPE B U 33. 1,800.00 59,400.00 3,000.00 99,000.00 1,900.00 62,700.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 8. 2,750.00 22,000.00 3,200.00 25,600.00 1,800.00 14,400.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 3,800.00 7,600.00 3,500.00 7,000.00 2,200.00 4,400.00 604.15 CATCH BASINS TYPE E U 10. 1,830.00 18,300.00 3,200.00 32,000.00 1,800.00 18,000.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 4. 2,900.00 11,600.00 3,500.00 14,000.00 1,750.00 7,000.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 3. 3,900.00 11,700.00 3,500.00 10,500.00 2,200.00 6,600.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,900. 21.00 39,900.00 16.00 30,400.00 18.00 34,200.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 4,800. 20.00 96,000.00 21.00 100,800.00 21.00 100,800.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 28. 200.00 5,600.00 215.00 6,020.00 220.00 6,160.00 614.3459 4 INCH 5-DUCT STEEL CONDUIT (BRIDGE) LF 490. 75.00 36,750.00 90.00 44,100.00 92.00 45,080.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 618.7 FLAGGERS HR 1,100. 18.00 19,800.00 20.00 22,000.00 18.00 19,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 32,000.00 32,000.00 50,000.00 50,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 25. 400.00 10,000.00 425.00 10,625.00 160.00 4,000.00 622.1 STEEL WITNESS MARKERS EA 14. 25.00 350.00 22.00 308.00 30.00 420.00 622.2 CONCRETE BOUNDS EA 28. 225.00 6,300.00 200.00 5,600.00 225.00 6,300.00 625.52 LIGHT POLE (HIGHWAY) U 1. 1,500.00 1,500.00 2,250.00 2,250.00 2,400.00 2,400.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 5. 750.00 3,750.00 900.00 4,500.00 900.00 4,500.00 11512D PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,500. 1.75 2,625.00 2.00 3,000.00 1.80 2,700.00 645.26 FLEXIBLE GROWTH MEDIUM SY 2,900. 1.10 3,190.00 1.10 3,190.00 1.00 2,900.00 645.3 EROSION STONE TON 200. 29.00 5,800.00 24.00 4,800.00 30.00 6,000.00 645.531 SILT FENCE LF 8,400. 2.50 21,000.00 4.50 37,800.00 2.00 16,800.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 4,500.00 4,500.00 6,000.00 6,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 45.00 9,000.00 50.00 10,000.00 55.00 11,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 25. 1,400.00 35,000.00 1,500.00 37,500.00 1,400.00 35,000.00 647.1 HUMUS CY 5,400. 19.00 102,600.00 16.00 86,400.00 16.00 86,400.00 692. MOBILIZATION U 1. 520,000.00 520,000.00 740,000.00 740,000.00 988,000.00 988,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 698.14 FIELD OFFICE TYPE D MON 24. 1,500.00 36,000.00 1,750.00 42,000.00 2,200.00 52,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 $14,682,544.39 $14,899,626.00 $14,976,538.40 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BEDFORD-MANCHESTER-LONDONDERRY-MERRIMACK A000 (255), 11512D COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 13, 2007 SCOPE OF WORK: ROADWAY AND BRIDGE WORK LOCATION: MANCHESTER AIRPORT ACCESS ROAD COMPLETION DATE: NOVEMBER 13, 2009 A E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $12,661,218.00 B BECK & BELLUCCI, INC. PO BOX 429, 10 SALISBURY RD., FRANKLIN, NH 03235 $13,147,779.23 C EVROKS CORPORATION PO BOX 669, WINNISQUAM, NH 03289 $14,164,114.99 D R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $14,682,544.39 E SPS NEW ENGLAND, INC. 98 ELM STREET, SALISBURY, MA 01952 $14,899,626.00 F THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $14,976,538.40 G MTG COPRATION, INC. ONC ACTON PLACE, SUITE 200, ACTON, MA 01720 $17,937,550.80 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .53 8,000.00 4,240.00 201.1 CLEARING AND GRUBBING (F) A 7.72 6,600.00 50,952.00 201.6 CLEARING FOR FENCE LINES (F) A .09 6,600.00 594.00 203.1 COMMON EXCAVATION CY 49,900. 10.00 499,000.00 203.2 ROCK EXCAVATION CY 440. 25.00 11,000.00 203.4 MUCK EXCAVATION CY 2,300. 10.00 23,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 309,301. 10.00 3,093,010.00 203.61 MODIFIED EMBANKMENT-IN- PLACE CY 60,300. 13.00 783,900.00 206.1 COMMON STRUCTURE EXCAVATION CY 440. 8.00 3,520.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 100. 22.00 2,200.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 550. 12.00 6,600.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 3,320. 22.00 73,040.00 210.1 SETTLEMENT PLATFORMS EA 2. 1,000.00 2,000.00 214. FINE GRADING U 1. 150,000.00 150,000.00 304.102 ADDITIONAL SAND CY 37,600. 20.00 752,000.00 11512D PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 400,000.00 400,000.00 503.201 COFFERDAMS U 1. 400,000.00 400,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,790. 14.00 81,060.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 35. 255.00 8,925.00 508. STRUCTURAL FILL CY 2,550. 25.00 63,750.00 510.1 PILE DRIVING EQUIPMENT U 1. 65,000.00 65,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 207,230. .80 165,784.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 46. 300.00 13,800.00 510.9 PILE SPLICES EA 46. 100.00 4,600.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 180. 400.00 72,000.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 545. 800.00 436,000.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 1,600. 800.00 1,280,000.00 520.210 CONCRETE CLASS B, SUB-FOOTINGS CY 915. 200.00 183,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 1,575. 210.00 330,750.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 1,685. 1,100.00 1,853,500.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 180. 80.00 14,400.00 536.11 EPOXY COATING FOR CONCRETE (F) SF 2,410. 8.00 19,280.00 537. CONCRETE SEALER (F) SF 23,760. 1.00 23,760.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 76. 25.00 1,900.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 202. 6.00 1,212.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 42. 6.00 252.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 87. 6.00 522.00 544. REINFORCING STEEL (F) LB 508,261. 1.00 508,261.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 539,183. 1.10 593,101.30 547. SHEAR CONNECTORS (F) EA 12,197. 3.00 36,591.00 550.1 STRUCTURAL STEEL (F) LB 1,529,000. 2.00 3,058,000.00 550.210 BRIDGE SHOES (F) EA 40. 4,500.00 180,000.00 559.5 SILICONE JOINT SEALANT (F LF 100. 10.00 1,000.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 210. 550.00 115,500.00 563.22 BRIDGE RAIL T2 (F) LF 870.5 115.00 100,107.50 11512D PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 564. BRIDGE LIGHTING SYSTEM U 1. 2,800.00 2,800.00 585.2 STONE FILL, CLASS B CY 390. 25.00 9,750.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 1,850. 30.00 55,500.00 585.3 STONE FILL, CLASS C CY 41. 25.00 1,025.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 3,200. 2.50 8,000.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 730. 5.00 3,650.00 603.00212 12" R.C. PIPE, 2000D LF 32. 30.00 960.00 603.00215 15" R.C. PIPE, 2000D LF 2,300. 32.00 73,600.00 603.00218 18" R.C. PIPE, 2000D LF 460. 42.00 19,320.00 603.00224 24" R.C. PIPE, 2000D LF 1,500. 52.00 78,000.00 603.00230 30" R.C. PIPE, 2000D LF 440. 75.00 33,000.00 603.00330 30" R.C. PIPE, 3000D LF 52. 77.00 4,004.00 603.30115 15" R.C. END SECTIONS EA 1. 700.00 700.00 603.30118 18" R.C. END SECTIONS EA 2. 750.00 1,500.00 603.30124 24" R.C. END SECTIONS EA 2. 900.00 1,800.00 603.36115 15" ALUMNIZED STEEL END SECTIONS EA 2. 300.00 600.00 604.0007 POLYETHYLENE LINER EA 28. 225.00 6,300.00 604.12 CATCH BASINS TYPE B U 33. 2,500.00 82,500.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 8. 4,750.00 38,000.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 5,500.00 11,000.00 604.15 CATCH BASINS TYPE E U 10. 2,550.00 25,500.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 4. 4,750.00 19,000.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 3. 5,750.00 17,250.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,900. 22.00 41,800.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 4,800. 22.00 105,600.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 28. 225.00 6,300.00 614.3459 4 INCH 5-DUCT STEEL CONDUIT (BRIDGE) LF 490. 160.00 78,400.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 50,000.00 50,000.00 618.7 FLAGGERS HR 1,100. 22.00 24,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 25. 315.00 7,875.00 622.1 STEEL WITNESS MARKERS EA 14. 30.00 420.00 622.2 CONCRETE BOUNDS EA 28. 230.00 6,440.00 625.52 LIGHT POLE (HIGHWAY) U 1. 2,400.00 2,400.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 5. 500.00 2,500.00 11512D PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,500. 1.80 2,700.00 645.26 FLEXIBLE GROWTH MEDIUM SY 2,900. 1.05 3,045.00 645.3 EROSION STONE TON 200. 30.00 6,000.00 645.531 SILT FENCE LF 8,400. 3.00 25,200.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,500.00 4,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 55.00 11,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 25. 1,900.00 47,500.00 647.1 HUMUS CY 5,400. 14.00 75,600.00 692. MOBILIZATION U 1. 1,147,000.00 1,147,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 698.14 FIELD OFFICE TYPE D MON 24. 1,500.00 36,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 1010.15 FUEL ADJUSTMENT $ 1. 100,000.00 100,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 76,000.00 76,000.00 $17,937,550.80