THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BEDFORD-MANCHESTER-LONDONDERRY A000(253), 11512A COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: MAY 17, 2007 SCOPE OF WORK: ROAD AND BRIDGE CONSTRUCTION LOCATION: MANCHESTER AIRPORT ACCESS ROAD BRIDGE OVER THE MERRIMACK RIVER, B&M RAILROAD AND NH 3A COMPLETION DATE: JUNE 25, 2010 A BECK & BELLUCCI, INC. 10 SALISBURY RD., FRANKLIN, NH 03235 $30,138,779.85 B R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $30,968,294.30 C REED & REED INC. PO BOX 370, WOOLWICH, ME 04579 $31,025,167.38 D THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $31,463,821.87 E E. D. SWETT, INC. 8 INDUSTRIAL PARK DR. CONCORD, N.H. 03301 $31,745,151.95 F CIANBRO CORPORATION ONE HUNNEWELL SQUARE, PITTSFIELD, ME 04967 $32,265,440.55 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .53 3,502.00 1,856.06 2,500.00 1,325.00 3,400.00 1,802.00 201.1 CLEARING AND GRUBBING (F) A 7.3 8,240.00 60,152.00 5,000.00 36,500.00 8,000.00 58,400.00 201.21 REMOVING SMALL TREES EA 14. 170.00 2,380.00 400.00 5,600.00 165.00 2,310.00 201.22 REMOVING LARGE TREES EA 1. 412.00 412.00 750.00 750.00 400.00 400.00 202.31 FILL ABANDONED PIPE CY 10. 464.00 4,640.00 170.00 1,700.00 450.00 4,500.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 105. 17.50 1,837.50 16.50 1,732.50 17.00 1,785.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 2. 257.50 515.00 270.00 540.00 250.00 500.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,138. 1.54 1,752.52 2.00 2,276.00 1.50 1,707.00 203.1 COMMON EXCAVATION CY 104,900. 5.04 528,696.00 6.00 629,400.00 5.00 524,500.00 203.2 ROCK EXCAVATION CY 1,100. 22.66 24,926.00 6.00 6,600.00 22.00 24,200.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 5. 1,030.00 5,150.00 1,200.00 6,000.00 1,000.00 5,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 96,631. 2.88 278,297.28 6.00 579,786.00 3.00 289,893.00 206.1 COMMON STRUCTURE EXCAVATION CY 2,800. 8.75 24,500.00 13.00 36,400.00 8.50 23,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 46.00 1,150.00 48.00 1,200.00 45.00 1,125.00 206.2 ROCK STRUCTURE EXCAVATION CY 53. 206.00 10,918.00 100.00 5,300.00 200.00 10,600.00 11512A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.2 GRANULAR BACKFILL (BRIDGE) CY 9,982. 21.63 215,910.66 33.00 329,406.00 21.00 209,622.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 3,358. 23.69 79,551.02 29.00 97,382.00 23.00 77,234.00 209.5 GRANULAR BACKFILL (STONE) CY 50. 30.90 1,545.00 63.00 3,150.00 30.00 1,500.00 214. FINE GRADING U 1. 92,700.00 92,700.00 70,000.00 70,000.00 90,000.00 90,000.00 304.1 SAND (F) CY 2,645. 17.51 46,313.95 24.00 63,480.00 17.00 44,965.00 304.102 ADDITIONAL SAND CY 12,800. 16.06 205,568.00 5.00 64,000.00 16.00 204,800.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 330. 30.90 10,197.00 37.50 12,375.00 30.00 9,900.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 2,212. 26.05 57,622.60 31.50 69,678.00 26.00 57,512.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 2,001. 26.05 52,126.05 31.50 63,031.50 26.00 52,026.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 2,700. 55.62 150,174.00 54.00 145,800.00 54.00 145,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 110. 97.85 10,763.50 95.00 10,450.00 95.00 10,450.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,500. .30 2,850.00 .15 1,425.00 .25 2,375.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 270. 82.40 22,248.00 70.00 18,900.00 80.00 21,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 330. 18.54 6,118.20 12.00 3,960.00 18.00 5,940.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 2,625,000.00 2,625,000.00 1,430,000.00 1,430,000.00 1,100,000.00 1,100,000.00 503.201 COFFERDAMS U 1. 100,000.00 100,000.00 111,000.00 111,000.00 75,000.00 75,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,735. 9.16 52,532.60 15.00 86,025.00 9.00 51,615.00 504.101 COMMON BRIDGE EXCAVATION CY 1,177. 9.27 10,910.79 15.00 17,655.00 9.00 10,593.00 508. STRUCTURAL FILL CY 600. 37.08 22,248.00 35.00 21,000.00 36.00 21,600.00 509.1 DRILLED SHAFT MOBILIZATION U 1. 169,025.00 169,025.00 165,000.00 165,000.00 600,000.00 600,000.00 509.2 DRILLED SHAFTS LF 329. 1,800.00 592,200.00 3,400.00 1,118,600.00 2,000.00 658,000.00 509.3 OBSTRUCTION REMOVAL LF 32. 1,500.00 48,000.00 4,500.00 144,000.00 2,500.00 80,000.00 509.4 ROCK SOCKET EXCAVATION LF 160. 5,248.00 839,680.00 4,800.00 768,000.00 5,000.00 800,000.00 509.5 CROSSHOLE SONIC LOGGING (CSL) TESTS EA 8. 2,100.00 16,800.00 2,000.00 16,000.00 2,800.00 22,400.00 510.1 PILE DRIVING EQUIPMENT U 1. 63,000.00 63,000.00 130,000.00 130,000.00 50,000.00 50,000.00 510.611 FURNISHING & DRIVING STEEL BEARING PILES (HP14X117) LB 197,730. .76 150,274.80 .57 112,706.10 .75 148,297.50 510.612 FURNISHING & DRIVING STEEL BEARING PILES (HP14X89) LB 323,070. .79 255,225.30 .57 184,149.90 .85 274,609.50 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 136. 140.00 19,040.00 330.00 44,880.00 200.00 27,200.00 510.9 PILE SPLICES EA 16. 10.00 160.00 100.00 1,600.00 200.00 3,200.00 520.001 CONCRETE CLASS AAA CY 352. 573.00 201,696.00 825.00 290,400.00 600.00 211,200.00 520.0031 PRECAST CONCRETE ARCHED FRAME U 1. 248,882.00 248,882.00 194,000.00 194,000.00 200,000.00 200,000.00 11512A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 520.01 CONCRETE CLASS AA CY 2,421. 490.00 1,186,290.00 600.00 1,452,600.00 700.00 1,694,700.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 777. 558.00 433,566.00 1,290.00 1,002,330.00 1,200.00 932,400.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 302. 360.00 108,720.00 320.00 96,640.00 450.00 135,900.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 125. 500.00 62,500.00 740.00 92,500.00 1,200.00 150,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 183. 350.00 64,050.00 420.00 76,860.00 400.00 73,200.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 4,716. 616.00 2,905,056.00 614.00 2,895,624.00 800.00 3,772,800.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 376. 50.00 18,800.00 75.00 28,200.00 100.00 37,600.00 536.11 EPOXY COATING FOR CONCRETE (F) SF 3,636. 8.66 31,487.76 9.00 32,724.00 8.25 29,997.00 537. CONCRETE SEALER (F) SF 31,840. .50 15,920.00 .50 15,920.00 1.00 31,840.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 230. 40.00 9,200.00 35.00 8,050.00 50.00 11,500.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 270. 5.00 1,350.00 5.00 1,350.00 12.00 3,240.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 90. 6.00 540.00 6.00 540.00 11.00 990.00 544. REINFORCING STEEL (F) LB 854,654. .90 769,188.60 1.45 1,239,248.30 .95 811,921.30 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 438. 4.50 1,971.00 5.00 2,190.00 3.50 1,533.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 1,783,397. .99 1,765,563.03 1.15 2,050,906.55 .98 1,747,729.06 544.5 REINFORCING STEEL-COUPLER CONNECTOR EA 352. 94.00 33,088.00 125.00 44,000.00 95.00 33,440.00 547.1 SHEAR CONNECTORS (F) EA 42,500. 2.56 108,800.00 2.50 106,250.00 2.50 106,250.00 550.1 STRUCTURAL STEEL (F) LB 6,371,123. 1.36 8,664,727.28 1.41 8,983,283.43 1.44 9,174,417.12 550.11 STRUCTURAL STEEL (CLOSED DRAINAGE SYSTEM) U 1. 767,458.00 767,458.00 840,000.00 840,000.00 975,000.00 975,000.00 550.210 BRIDGE SHOES (F) EA 84. 4,591.00 385,644.00 4,900.00 411,600.00 6,000.00 504,000.00 559.5 SILICONE JOINT SEALANT (F LF 330. 10.00 3,300.00 10.00 3,300.00 13.00 4,290.00 561.111 PREFABRICATED EXPANSION JOINT, MODULAR TYPE A (F) LF 254. 944.00 239,776.00 1,000.00 254,000.00 950.00 241,300.00 563.22 BRIDGE RAIL T2 (F) LF 2,428. 90.00 218,520.00 95.00 230,660.00 92.00 223,376.00 563.24 BRIDGE RAIL T4 (F) LF 1,214. 136.00 165,104.00 135.00 163,890.00 135.00 163,890.00 563.921 PROTECTIVE SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 1,552. 46.43 72,059.36 40.00 62,080.00 40.00 62,080.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 123. 29.00 3,567.00 30.24 3,719.52 30.00 3,690.00 570.4 MORTAR RUBBLE MASONRY (F) CY 13. 515.00 6,695.00 450.00 5,850.00 500.00 6,500.00 585.2 STONE FILL, CLASS B CY 1,000. 38.11 38,110.00 57.00 57,000.00 37.00 37,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 759. 39.14 29,707.26 55.00 41,745.00 38.00 28,842.00 11512A PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 585.3 STONE FILL, CLASS C CY 1,231. 39.14 48,181.34 60.00 73,860.00 38.00 46,778.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 7,889. 43.38 342,224.82 44.00 347,116.00 42.00 331,338.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 1,241. 2.57 3,189.37 3.50 4,343.50 2.50 3,102.50 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 5,200. 2.57 13,364.00 3.50 18,200.00 2.50 13,000.00 603.00215 15" R.C. PIPE, 2000D LF 310. 38.11 11,814.10 50.00 15,500.00 37.00 11,470.00 603.00218 18" R.C. PIPE, 2000D LF 335. 57.68 19,322.80 55.00 18,425.00 56.00 18,760.00 603.00224 24" R.C. PIPE, 2000D LF 455. 63.86 29,056.30 63.00 28,665.00 62.00 28,210.00 603.00230 30" R.C. PIPE, 2000D LF 150. 72.10 10,815.00 76.00 11,400.00 70.00 10,500.00 603.00236 36" R.C. PIPE, 2000D LF 450. 84.46 38,007.00 90.00 40,500.00 82.00 36,900.00 603.30136 36" R.C. END SECTIONS EA 3. 1,442.00 4,326.00 1,100.00 3,300.00 1,400.00 4,200.00 603.36118 18" ALUMINIZED STEEL END SECTIONS EA 1. 386.00 386.00 410.00 410.00 375.00 375.00 603.36124 24" ALUMINIZED STEEL END SECTIONS EA 2. 695.00 1,390.00 550.00 1,100.00 675.00 1,350.00 603.36130 30" ALUMINIZED STEEL END SECTIONS EA 1. 978.00 978.00 850.00 850.00 950.00 950.00 603.36136 36" ALUMINIZED STEEL END SECTIONS EA 2. 1,236.00 2,472.00 900.00 1,800.00 1,200.00 2,400.00 603.69012 12" DRAINAGE PIPE (CONTRACTORS OPTION) LF 140. 26.80 3,752.00 40.00 5,600.00 26.00 3,640.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 60. 31.00 1,860.00 41.00 2,460.00 30.00 1,800.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 230. 36.05 8,291.50 49.00 11,270.00 35.00 8,050.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 54. 61.80 3,337.20 63.00 3,402.00 60.00 3,240.00 604.0007 POLYETHYLENE LINER EA 7. 267.80 1,874.60 225.00 1,575.00 260.00 1,820.00 604.12 CATCH BASINS TYPE B U 11. 1,803.00 19,833.00 2,050.00 22,550.00 1,750.00 19,250.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 2. 2,369.00 4,738.00 2,800.00 5,600.00 2,300.00 4,600.00 604.135 CATCH BASINS TYPE C, 5-FOOT DIAMETER U 2. 2,420.00 4,840.00 2,800.00 5,600.00 2,350.00 4,700.00 604.15 CATCH BASINS TYPE E U 2. 1,957.00 3,914.00 2,200.00 4,400.00 1,900.00 3,800.00 604.158 CATCH BASINS TYPE E, 8-FOOT DIAMETER U 3. 8,240.00 24,720.00 5,400.00 16,200.00 8,000.00 24,000.00 604.32 DRAINAGE MANHOLES U 11. 1,751.00 19,261.00 2,100.00 23,100.00 1,700.00 18,700.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 10. 2,369.00 23,690.00 2,850.00 28,500.00 2,300.00 23,000.00 604.39 SPECIAL MANHOLES U 1. 5,150.00 5,150.00 6,500.00 6,500.00 5,000.00 5,000.00 604.395 SPECIAL MANHOLES, 5-FOOT DIAMETER U 1. 7,210.00 7,210.00 9,500.00 9,500.00 7,000.00 7,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 1. 412.00 412.00 325.00 325.00 400.00 400.00 604.6 MANHOLE COVERS & FRAMES EA 1. 515.00 515.00 475.00 475.00 500.00 500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 515.00 515.00 525.00 525.00 500.00 500.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 330. 20.60 6,798.00 26.00 8,580.00 30.00 9,900.00 11512A PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 1,800. 17.14 30,852.00 17.50 31,500.00 17.00 30,600.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 5. 1,905.00 9,525.00 1,850.00 9,250.00 1,850.00 9,250.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,700. 19.57 33,269.00 25.00 42,500.00 19.00 32,300.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 3,605.00 7,210.00 3,000.00 6,000.00 5,000.00 10,000.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 710. 24.00 17,040.00 20.00 14,200.00 20.00 14,200.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 9. 110.00 990.00 180.00 1,620.00 211.00 1,899.00 607.71265 12 FT.CHAIN LINK GATES WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH EA 1. 600.00 600.00 1,500.00 1,500.00 1,410.00 1,410.00 607.82462 24 FT. OPENING CHAIN LINK DOUBLE GATES /ALUM.-CTD. STEEL FABRIC, 6 FT. HIGH EA 1. 1,300.00 1,300.00 2,000.00 2,000.00 2,000.00 2,000.00 607.996 TEMPORARY CHAIN LINK FENCE LF 1,100. 9.00 9,900.00 10.00 11,000.00 9.00 9,900.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 1,184. 14.42 17,073.28 15.00 17,760.00 14.00 16,576.00 608.24 4" CONCRETE SIDEWALK (F) SY 14.5 51.50 746.75 38.00 551.00 50.00 725.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 4. 721.00 2,884.00 475.00 1,900.00 700.00 2,800.00 609.01 STRAIGHT GRANITE CURB LF 570. 16.48 9,393.60 15.00 8,550.00 16.00 9,120.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 225. 5.15 1,158.75 4.00 900.00 5.00 1,125.00 612.197 ABANDONMENT OF EXISTING PIPES IN-PLACE U 1. 6,180.00 6,180.00 700.00 700.00 6,000.00 6,000.00 612.198 REMODEL EXISTING SMH TO RECEIVE RELOCATED FORCE MAIN EA 1. 2,575.00 2,575.00 2,000.00 2,000.00 2,500.00 2,500.00 612.199 BYPASS PUMPING SYSTEM FOR THE TROLLEY CROSSING PUMP STATION U 1. 15,450.00 15,450.00 5,000.00 5,000.00 15,000.00 15,000.00 612.394 BLOW-OFF SEWER MANHOLE ASSEMBLY EA 1. 5,665.00 5,665.00 6,500.00 6,500.00 5,500.00 5,500.00 612.43208 8" DIAMETER DICL SEWER FORCE MAIN, CLASS 52 LF 1,156. 66.95 77,394.20 90.00 104,040.00 65.00 75,140.00 612.55 ADJUST SMH COVERS AND FRAMES ON EXISTING STRUCTURES EA 2. 412.00 824.00 400.00 800.00 400.00 800.00 612.9508 8" DIAMETER SEWER PIPE INSULTATION LF 40. 56.65 2,266.00 70.00 2,800.00 55.00 2,200.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 2,575. 31.00 79,825.00 28.00 72,100.00 30.00 77,250.00 614.511 CONCRETE PULL BOX 14" EA 3. 335.00 1,005.00 310.00 930.00 325.00 975.00 11512A PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.523 MOLDED PULL BOX 17"X30" EA 2. 375.00 750.00 340.00 680.00 360.00 720.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 80. 21.00 1,680.00 19.00 1,520.00 20.00 1,600.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 95. 24.00 2,280.00 21.00 1,995.00 23.00 2,185.00 615.03 TRAFFIC SIGN TYPE C (F) SF 43. 56.65 2,435.95 37.00 1,591.00 45.00 1,935.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 8. 10.50 84.00 25.00 200.00 45.00 360.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 12. 15.50 186.00 25.00 300.00 16.00 192.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 8,400. 22.66 190,344.00 20.00 168,000.00 21.00 176,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 113,300.00 113,300.00 50,000.00 50,000.00 22,500.00 22,500.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 24. 4.15 99.60 4.00 96.00 4.00 96.00 621.31 SINGLE DELINEATOR WITH POST EA 19. 28.84 547.96 28.00 532.00 28.00 532.00 622.1 STEEL WITNESS MARKERS EA 22. 25.75 566.50 25.00 550.00 25.00 550.00 622.2 CONCRETE BOUNDS EA 24. 293.55 7,045.20 250.00 6,000.00 285.00 6,840.00 624. RAILROAD PROTECTION U 1. 133,600.00 133,600.00 42,000.00 42,000.00 100,000.00 100,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 170. 4.12 700.40 2.00 340.00 4.00 680.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 36,000. .11 3,960.00 .11 3,960.00 .14 5,040.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 42. 7.72 324.24 11.50 483.00 20.00 840.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 920. .46 423.20 .45 414.00 .42 386.40 643.22 FERTILIZER FOR REFERTIL- IZATION TON 6. 824.00 4,944.00 600.00 3,600.00 800.00 4,800.00 644.62 WET BASIN SEED, TYPE 62 LB 22. 7.75 170.50 6.00 132.00 8.00 176.00 645.0001 TURBIDITY BARRIER LF 1,200. 25.00 30,000.00 30.00 36,000.00 62.00 74,400.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 610. 1.90 1,159.00 2.00 1,220.00 2.00 1,220.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,100. 1.91 2,101.00 2.00 2,200.00 2.00 2,200.00 645.25 PERMANENT STABILIZATION SY 1,700. 8.00 13,600.00 5.00 8,500.00 5.00 8,500.00 645.3 EROSION STONE TON 55. 25.75 1,416.25 45.00 2,475.00 25.00 1,375.00 645.531 SILT FENCE LF 2,400. 2.83 6,792.00 2.50 6,000.00 3.00 7,200.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 6,200.00 6,200.00 3,500.00 3,500.00 6,000.00 6,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 520. 63.00 32,760.00 60.00 31,200.00 60.00 31,200.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,700.00 23,800.00 1,600.00 22,400.00 1,650.00 23,100.00 647.1 HUMUS CY 6,200. 16.48 102,176.00 16.00 99,200.00 16.00 99,200.00 650.2 LANDSCAPING U 1. 103,000.00 103,000.00 80,000.00 80,000.00 100,000.00 100,000.00 662.282 DECOMMISION MONITORING WELL LF 150. 15.00 2,250.00 20.00 3,000.00 10.00 1,500.00 670.045 CONSTRUCT AND REMOVE DETOUR U 1. 41,200.00 41,200.00 45,000.00 45,000.00 40,000.00 40,000.00 11512A PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.101 TEMPORARY LIGHTING U 1. 9,300.00 9,300.00 6,500.00 6,500.00 9,000.00 9,000.00 670.42 CONCRETE FILLED BOLLARD EA 2. 500.00 1,000.00 375.00 750.00 375.00 750.00 692. MOBILIZATION U 1. 1,728,116.32 1,728,116.32 850,000.00 850,000.00 1,000,000.00 1,000,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 698.11 FIELD OFFICE TYPE A MON 36. 2,200.00 79,200.00 1,500.00 54,000.00 1,000.00 36,000.00 698.2 PHYSICAL TESTING LABORATORY MON 36. 800.00 28,800.00 700.00 25,200.00 750.00 27,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1008.91 CSL EQUIPMENT PURCHASE AND TRAINING $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.15 FUEL ADJUSTMENT $ 1. 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 $30,138,779.85 $30,968,294.30 $31,025,167.38 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BEDFORD-MANCHESTER-LONDONDERRY A000(253), 11512A COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: MAY 17, 2007 SCOPE OF WORK: ROAD AND BRIDGE CONSTRUCTION LOCATION: MANCHESTER AIRPORT ACCESS ROAD BRIDGE OVER THE MERRIMACK RIVER, B&M RAILROAD AND NH 3A COMPLETION DATE: JUNE 25, 2010 A BECK & BELLUCCI, INC. 10 SALISBURY RD., FRANKLIN, NH 03235 $30,138,779.85 B R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $30,968,294.30 C REED & REED INC. PO BOX 370, WOOLWICH, ME 04579 $31,025,167.38 D THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $31,463,821.87 E E. D. SWETT, INC. 8 INDUSTRIAL PARK DR. CONCORD, N.H. 03301 $31,745,151.95 F CIANBRO CORPORATION ONE HUNNEWELL SQUARE, PITTSFIELD, ME 04967 $32,265,440.55 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .53 8,000.00 4,240.00 2,500.00 1,325.00 3,400.00 1,802.00 201.1 CLEARING AND GRUBBING (F) A 7.3 8,000.00 58,400.00 5,000.00 36,500.00 8,000.00 58,400.00 201.21 REMOVING SMALL TREES EA 14. 500.00 7,000.00 100.00 1,400.00 165.00 2,310.00 201.22 REMOVING LARGE TREES EA 1. 1,600.00 1,600.00 400.00 400.00 400.00 400.00 202.31 FILL ABANDONED PIPE CY 10. 400.00 4,000.00 150.00 1,500.00 450.00 4,500.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 105. 70.00 7,350.00 12.00 1,260.00 17.00 1,785.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 2. 1,400.00 2,800.00 300.00 600.00 250.00 500.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,138. 2.50 2,845.00 1.50 1,707.00 2.25 2,560.50 203.1 COMMON EXCAVATION CY 104,900. 6.00 629,400.00 5.00 524,500.00 4.90 514,010.00 203.2 ROCK EXCAVATION CY 1,100. 30.00 33,000.00 20.00 22,000.00 22.00 24,200.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 5. 1,300.00 6,500.00 1,000.00 5,000.00 2,800.00 14,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 96,631. 3.00 289,893.00 9.50 917,994.50 2.80 270,566.80 206.1 COMMON STRUCTURE EXCAVATION CY 2,800. 14.00 39,200.00 12.00 33,600.00 8.50 23,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 110.00 2,750.00 40.00 1,000.00 45.00 1,125.00 206.2 ROCK STRUCTURE EXCAVATION CY 53. 120.00 6,360.00 60.00 3,180.00 200.00 10,600.00 11512A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.2 GRANULAR BACKFILL (BRIDGE) CY 9,982. 26.00 259,532.00 30.00 299,460.00 21.00 209,622.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 3,358. 28.00 94,024.00 35.00 117,530.00 23.00 77,234.00 209.5 GRANULAR BACKFILL (STONE) CY 50. 38.00 1,900.00 40.00 2,000.00 30.00 1,500.00 214. FINE GRADING U 1. 25,000.00 25,000.00 20,000.00 20,000.00 90,000.00 90,000.00 304.1 SAND (F) CY 2,645. 32.00 84,640.00 14.00 37,030.00 17.00 44,965.00 304.102 ADDITIONAL SAND CY 12,800. 27.00 345,600.00 14.00 179,200.00 15.60 199,680.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 330. 36.00 11,880.00 25.00 8,250.00 30.00 9,900.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 2,212. 28.00 61,936.00 35.00 77,420.00 25.30 55,963.60 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 2,001. 27.00 54,027.00 35.00 70,035.00 25.30 50,625.30 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 2,700. 54.00 145,800.00 54.00 145,800.00 54.00 145,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 110. 110.00 12,100.00 95.00 10,450.00 95.00 10,450.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,500. .30 2,850.00 .90 8,550.00 1.00 9,500.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 270. 72.00 19,440.00 70.00 18,900.00 80.00 21,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 330. 18.00 5,940.00 18.00 5,940.00 18.00 5,940.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 1,887,000.00 1,887,000.00 2,500,000.00 2,500,000.00 955,000.00 955,000.00 503.201 COFFERDAMS U 1. 140,000.00 140,000.00 100,000.00 100,000.00 700,000.00 700,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,735. 24.00 137,640.00 20.00 114,700.00 8.90 51,041.50 504.101 COMMON BRIDGE EXCAVATION CY 1,177. 4.00 4,708.00 12.00 14,124.00 9.00 10,593.00 508. STRUCTURAL FILL CY 600. 35.00 21,000.00 40.00 24,000.00 36.00 21,600.00 509.1 DRILLED SHAFT MOBILIZATION U 1. 350,000.00 350,000.00 1,000,000.00 1,000,000.00 151,100.00 151,100.00 509.2 DRILLED SHAFTS LF 329. 2,600.00 855,400.00 1,500.00 493,500.00 2,825.00 929,425.00 509.3 OBSTRUCTION REMOVAL LF 32. 350.00 11,200.00 100.00 3,200.00 2,525.00 80,800.00 509.4 ROCK SOCKET EXCAVATION LF 160. 4,800.00 768,000.00 5,000.00 800,000.00 4,845.00 775,200.00 509.5 CROSSHOLE SONIC LOGGING (CSL) TESTS EA 8. 2,500.00 20,000.00 4,000.00 32,000.00 2,000.00 16,000.00 510.1 PILE DRIVING EQUIPMENT U 1. 180,000.00 180,000.00 250,000.00 250,000.00 90,000.00 90,000.00 510.611 FURNISHING & DRIVING STEEL BEARING PILES (HP14X117) LB 197,730. .60 118,638.00 .60 118,638.00 .75 148,297.50 510.612 FURNISHING & DRIVING STEEL BEARING PILES (HP14X89) LB 323,070. .60 193,842.00 .50 161,535.00 1.00 323,070.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 136. 350.00 47,600.00 200.00 27,200.00 110.00 14,960.00 510.9 PILE SPLICES EA 16. 1,500.00 24,000.00 200.00 3,200.00 500.00 8,000.00 520.001 CONCRETE CLASS AAA CY 352. 500.00 176,000.00 600.00 211,200.00 725.00 255,200.00 520.0031 PRECAST CONCRETE ARCHED FRAME U 1. 260,000.00 260,000.00 200,000.00 200,000.00 200,000.00 200,000.00 11512A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 520.01 CONCRETE CLASS AA CY 2,421. 520.00 1,258,920.00 450.00 1,089,450.00 575.00 1,392,075.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 777. 770.00 598,290.00 925.00 718,725.00 900.00 699,300.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 302. 275.00 83,050.00 350.00 105,700.00 525.00 158,550.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 125. 560.00 70,000.00 500.00 62,500.00 775.00 96,875.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 183. 240.00 43,920.00 350.00 64,050.00 375.00 68,625.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 4,716. 660.00 3,112,560.00 650.00 3,065,400.00 900.00 4,244,400.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 376. 75.00 28,200.00 100.00 37,600.00 65.00 24,440.00 536.11 EPOXY COATING FOR CONCRETE (F) SF 3,636. 8.00 29,088.00 12.50 45,450.00 11.00 39,996.00 537. CONCRETE SEALER (F) SF 31,840. 1.00 31,840.00 1.00 31,840.00 2.00 63,680.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 230. 30.00 6,900.00 50.00 11,500.00 65.00 14,950.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 270. 6.00 1,620.00 5.00 1,350.00 15.00 4,050.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 90. 7.00 630.00 5.00 450.00 15.00 1,350.00 544. REINFORCING STEEL (F) LB 854,654. 1.00 854,654.00 1.00 854,654.00 .85 726,455.90 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 438. 2.50 1,095.00 2.50 1,095.00 3.50 1,533.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 1,783,397. .70 1,248,377.90 1.10 1,961,736.70 1.00 1,783,397.00 544.5 REINFORCING STEEL-COUPLER CONNECTOR EA 352. 100.00 35,200.00 100.00 35,200.00 40.00 14,080.00 547.1 SHEAR CONNECTORS (F) EA 42,500. 3.00 127,500.00 3.00 127,500.00 2.00 85,000.00 550.1 STRUCTURAL STEEL (F) LB 6,371,123. 1.39 8,855,860.97 1.25 7,963,903.75 1.45 9,238,128.35 550.11 STRUCTURAL STEEL (CLOSED DRAINAGE SYSTEM) U 1. 650,000.00 650,000.00 1,000,000.00 1,000,000.00 900,000.00 900,000.00 550.210 BRIDGE SHOES (F) EA 84. 4,800.00 403,200.00 5,000.00 420,000.00 5,500.00 462,000.00 559.5 SILICONE JOINT SEALANT (F LF 330. 5.00 1,650.00 10.00 3,300.00 16.00 5,280.00 561.111 PREFABRICATED EXPANSION JOINT, MODULAR TYPE A (F) LF 254. 850.00 215,900.00 1,000.00 254,000.00 1,000.00 254,000.00 563.22 BRIDGE RAIL T2 (F) LF 2,428. 90.00 218,520.00 100.00 242,800.00 83.00 201,524.00 563.24 BRIDGE RAIL T4 (F) LF 1,214. 130.00 157,820.00 150.00 182,100.00 127.00 154,178.00 563.921 PROTECTIVE SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 1,552. 40.00 62,080.00 50.00 77,600.00 47.00 72,944.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 123. 30.00 3,690.00 30.00 3,690.00 27.50 3,382.50 570.4 MORTAR RUBBLE MASONRY (F) CY 13. 340.00 4,420.00 450.00 5,850.00 500.00 6,500.00 585.2 STONE FILL, CLASS B CY 1,000. 46.00 46,000.00 30.00 30,000.00 37.00 37,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 759. 60.00 45,540.00 45.00 34,155.00 38.00 28,842.00 11512A PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 585.3 STONE FILL, CLASS C CY 1,231. 50.00 61,550.00 32.00 39,392.00 38.00 46,778.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 7,889. 49.00 386,561.00 40.00 315,560.00 40.00 315,560.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 1,241. 3.00 3,723.00 3.00 3,723.00 2.50 3,102.50 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 5,200. 3.50 18,200.00 3.00 15,600.00 2.50 13,000.00 603.00215 15" R.C. PIPE, 2000D LF 310. 54.00 16,740.00 40.00 12,400.00 37.00 11,470.00 603.00218 18" R.C. PIPE, 2000D LF 335. 56.00 18,760.00 45.00 15,075.00 56.00 18,760.00 603.00224 24" R.C. PIPE, 2000D LF 455. 75.00 34,125.00 54.00 24,570.00 62.00 28,210.00 603.00230 30" R.C. PIPE, 2000D LF 150. 92.00 13,800.00 62.00 9,300.00 70.00 10,500.00 603.00236 36" R.C. PIPE, 2000D LF 450. 84.00 37,800.00 75.00 33,750.00 82.00 36,900.00 603.30136 36" R.C. END SECTIONS EA 3. 1,200.00 3,600.00 975.00 2,925.00 1,400.00 4,200.00 603.36118 18" ALUMINIZED STEEL END SECTIONS EA 1. 500.00 500.00 400.00 400.00 375.00 375.00 603.36124 24" ALUMINIZED STEEL END SECTIONS EA 2. 650.00 1,300.00 600.00 1,200.00 675.00 1,350.00 603.36130 30" ALUMINIZED STEEL END SECTIONS EA 1. 1,000.00 1,000.00 900.00 900.00 950.00 950.00 603.36136 36" ALUMINIZED STEEL END SECTIONS EA 2. 1,600.00 3,200.00 1,000.00 2,000.00 1,200.00 2,400.00 603.69012 12" DRAINAGE PIPE (CONTRACTORS OPTION) LF 140. 70.00 9,800.00 16.00 2,240.00 26.00 3,640.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 60. 53.00 3,180.00 40.00 2,400.00 30.00 1,800.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 230. 70.00 16,100.00 42.00 9,660.00 35.00 8,050.00 603.83230 30" PLASTIC PIPE (SMOOTH INTERIOR) LF 54. 89.00 4,806.00 65.00 3,510.00 60.00 3,240.00 604.0007 POLYETHYLENE LINER EA 7. 300.00 2,100.00 150.00 1,050.00 260.00 1,820.00 604.12 CATCH BASINS TYPE B U 11. 2,400.00 26,400.00 1,600.00 17,600.00 1,750.00 19,250.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 2. 3,800.00 7,600.00 3,000.00 6,000.00 2,300.00 4,600.00 604.135 CATCH BASINS TYPE C, 5-FOOT DIAMETER U 2. 1,800.00 3,600.00 3,200.00 6,400.00 2,350.00 4,700.00 604.15 CATCH BASINS TYPE E U 2. 2,100.00 4,200.00 1,800.00 3,600.00 1,900.00 3,800.00 604.158 CATCH BASINS TYPE E, 8-FOOT DIAMETER U 3. 3,800.00 11,400.00 6,000.00 18,000.00 8,000.00 24,000.00 604.32 DRAINAGE MANHOLES U 11. 2,800.00 30,800.00 1,800.00 19,800.00 1,700.00 18,700.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 10. 3,800.00 38,000.00 3,000.00 30,000.00 2,300.00 23,000.00 604.39 SPECIAL MANHOLES U 1. 6,400.00 6,400.00 5,000.00 5,000.00 5,000.00 5,000.00 604.395 SPECIAL MANHOLES, 5-FOOT DIAMETER U 1. 8,000.00 8,000.00 6,000.00 6,000.00 7,000.00 7,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 1. 600.00 600.00 400.00 400.00 400.00 400.00 604.6 MANHOLE COVERS & FRAMES EA 1. 800.00 800.00 400.00 400.00 500.00 500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 1,200.00 1,200.00 700.00 700.00 500.00 500.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 330. 22.00 7,260.00 16.00 5,280.00 20.00 6,600.00 11512A PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 1,800. 18.00 32,400.00 16.65 29,970.00 17.50 31,500.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 5. 1,900.00 9,500.00 2,000.00 10,000.00 1,896.00 9,480.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,700. 18.00 30,600.00 25.00 42,500.00 19.00 32,300.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 5,000.00 10,000.00 3,500.00 7,000.00 15,000.00 30,000.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 710. 20.00 14,200.00 18.00 12,780.00 19.26 13,674.60 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 9. 220.00 1,980.00 200.00 1,800.00 211.00 1,899.00 607.71265 12 FT.CHAIN LINK GATES WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH EA 1. 1,500.00 1,500.00 1,250.00 1,250.00 1,410.00 1,410.00 607.82462 24 FT. OPENING CHAIN LINK DOUBLE GATES /ALUM.-CTD. STEEL FABRIC, 6 FT. HIGH EA 1. 2,000.00 2,000.00 2,500.00 2,500.00 1,918.00 1,918.00 607.996 TEMPORARY CHAIN LINK FENCE LF 1,100. 10.00 11,000.00 .01 11.00 8.50 9,350.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 1,184. 14.00 16,576.00 15.00 17,760.00 14.00 16,576.00 608.24 4" CONCRETE SIDEWALK (F) SY 14.5 60.00 870.00 50.00 725.00 50.00 725.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 4. 300.00 1,200.00 750.00 3,000.00 700.00 2,800.00 609.01 STRAIGHT GRANITE CURB LF 570. 19.00 10,830.00 20.00 11,400.00 16.00 9,120.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 225. 6.00 1,350.00 4.00 900.00 5.00 1,125.00 612.197 ABANDONMENT OF EXISTING PIPES IN-PLACE U 1. 8,000.00 8,000.00 3,200.00 3,200.00 6,000.00 6,000.00 612.198 REMODEL EXISTING SMH TO RECEIVE RELOCATED FORCE MAIN EA 1. 2,500.00 2,500.00 2,000.00 2,000.00 2,500.00 2,500.00 612.199 BYPASS PUMPING SYSTEM FOR THE TROLLEY CROSSING PUMP STATION U 1. 6,000.00 6,000.00 30,000.00 30,000.00 15,000.00 15,000.00 612.394 BLOW-OFF SEWER MANHOLE ASSEMBLY EA 1. 7,000.00 7,000.00 3,500.00 3,500.00 5,500.00 5,500.00 612.43208 8" DIAMETER DICL SEWER FORCE MAIN, CLASS 52 LF 1,156. 80.00 92,480.00 60.00 69,360.00 65.00 75,140.00 612.55 ADJUST SMH COVERS AND FRAMES ON EXISTING STRUCTURES EA 2. 300.00 600.00 400.00 800.00 400.00 800.00 612.9508 8" DIAMETER SEWER PIPE INSULTATION LF 40. 45.00 1,800.00 15.00 600.00 55.00 2,200.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 2,575. 52.00 133,900.00 50.00 128,750.00 30.00 77,250.00 614.511 CONCRETE PULL BOX 14" EA 3. 375.00 1,125.00 400.00 1,200.00 325.00 975.00 11512A PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.523 MOLDED PULL BOX 17"X30" EA 2. 400.00 800.00 400.00 800.00 360.00 720.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 80. 19.00 1,520.00 16.00 1,280.00 20.00 1,600.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 95. 25.00 2,375.00 20.00 1,900.00 23.00 2,185.00 615.03 TRAFFIC SIGN TYPE C (F) SF 43. 40.00 1,720.00 50.00 2,150.00 55.00 2,365.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 8. 100.00 800.00 10.00 80.00 10.00 80.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 12. 30.00 360.00 25.00 300.00 15.00 180.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 8,400. 10.00 84,000.00 20.00 168,000.00 21.00 176,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 160,000.00 160,000.00 75,000.00 75,000.00 110,000.00 110,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 24. 5.00 120.00 4.00 96.00 5.00 120.00 621.31 SINGLE DELINEATOR WITH POST EA 19. 30.00 570.00 28.00 532.00 29.00 551.00 622.1 STEEL WITNESS MARKERS EA 22. 30.00 660.00 25.00 550.00 27.00 594.00 622.2 CONCRETE BOUNDS EA 24. 230.00 5,520.00 285.00 6,840.00 222.00 5,328.00 624. RAILROAD PROTECTION U 1. 160,000.00 160,000.00 15,000.00 15,000.00 45,000.00 45,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 170. 5.00 850.00 2.00 340.00 4.00 680.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 36,000. .14 5,040.00 .10 3,600.00 .10 3,600.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 42. 15.00 630.00 5.00 210.00 7.50 315.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 920. 1.00 920.00 .50 460.00 .45 414.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 6. 650.00 3,900.00 400.00 2,400.00 800.00 4,800.00 644.62 WET BASIN SEED, TYPE 62 LB 22. 85.00 1,870.00 7.50 165.00 7.50 165.00 645.0001 TURBIDITY BARRIER LF 1,200. 24.00 28,800.00 15.00 18,000.00 35.00 42,000.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 610. 2.50 1,525.00 3.00 1,830.00 1.85 1,128.50 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,100. 2.50 2,750.00 3.00 3,300.00 1.85 2,035.00 645.25 PERMANENT STABILIZATION SY 1,700. 2.00 3,400.00 5.00 8,500.00 5.00 8,500.00 645.3 EROSION STONE TON 55. 35.00 1,925.00 30.00 1,650.00 25.00 1,375.00 645.531 SILT FENCE LF 2,400. 2.50 6,000.00 3.00 7,200.00 2.75 6,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 14,000.00 14,000.00 5,000.00 5,000.00 6,000.00 6,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 520. 52.00 27,040.00 50.00 26,000.00 60.00 31,200.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,725.00 24,150.00 1,500.00 21,000.00 1,650.00 23,100.00 647.1 HUMUS CY 6,200. 22.00 136,400.00 12.00 74,400.00 16.00 99,200.00 650.2 LANDSCAPING U 1. 260,000.00 260,000.00 90,000.00 90,000.00 84,095.00 84,095.00 662.282 DECOMMISION MONITORING WELL LF 150. 30.00 4,500.00 10.00 1,500.00 15.00 2,250.00 670.045 CONSTRUCT AND REMOVE DETOUR U 1. 35,000.00 35,000.00 45,000.00 45,000.00 40,000.00 40,000.00 11512A PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.101 TEMPORARY LIGHTING U 1. 25,000.00 25,000.00 10,000.00 10,000.00 9,000.00 9,000.00 670.42 CONCRETE FILLED BOLLARD EA 2. 700.00 1,400.00 500.00 1,000.00 750.00 1,500.00 692. MOBILIZATION U 1. 2,500,000.00 2,500,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 698.11 FIELD OFFICE TYPE A MON 36. 2,600.00 93,600.00 2,000.00 72,000.00 4,000.00 144,000.00 698.2 PHYSICAL TESTING LABORATORY MON 36. 1,050.00 37,800.00 250.00 9,000.00 500.00 18,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1008.91 CSL EQUIPMENT PURCHASE AND TRAINING $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.15 FUEL ADJUSTMENT $ 1. 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 $31,463,821.87 $31,745,151.95 $32,265,440.55