Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Albany 13632-B X-A000(190) April 13, 2006 NH 112, Roadway rehabilitation and shoulder widening
Alstead 14541-G   May 18, 2006 NH 123, Design, manufacture and deliver 1 precast concrete box culvert
Alstead 14541-H X-A000(471) June 8, 2006 NH 123, Install culvert & reconstruct roadway
Bath-Landaff 13427   December 7, 2006 US 302 & NH 10, Guardrail upgrade & other related work
Bartlett 13043 BRF-MGS-X-0321(023) October 4, 2006 US 302, Replace bridge over NHRR & over the Saco River
Bedford 10018-F STP-X-5037(008) March 2, 2006 US 3, Landscaping Kilton Road & associated areas
Bedford-Manchester-Londonderry 11512-E A000(203) May 8, 2006 Airport access road, building demolition on airport property
Bedford-Manchester-Londonderry 11512-M X-A000(468) July 6, 2006 NH 3A & South River Road, building demolitions
Belmont 12916 STP-X-T-0291(012) September 21, 2006 US3/NH11, reconstruction & widening
Bow 13714   December 21, 2006 Grandview Road, Bridge rehabilitation over I-93/FEE TPK
Canaan-Dorchester 14478   March 30, 2006 NH 118, pavement rehabilitation and drainage upgrades
Candia-Hooksett 14703 & 14625 X-A000(491) October 5, 2006 Slope Stabilization, NH 101
Claremont-Newport 10433 MGS-STP-NHS-F-X-T-0141(023) August 11, 2006 NH 11 & 103, Reconstruct from urban compact line to Kelleyville Bridge
Colebrook P2493-C BRS-RS-X-0201(007) September 28, 2006 NH 26, Widening and road reconstruction & bridge replacement
Concord-Canterbury 14283 X-A000(279) March 16, 2006 I-93, Pavement & bridge work from Exit 17 to 18
Gorham 14204 X-A000(238) April 6, 2006 NH 16, pavement rehabilitation and safety work
Hampton-Hooksett 80268-R & 14630   September 14, 2006 Re-roof toll plaza canopies and administration buildings
Hampton-Portsmouth-Dover-Rochester 14522   April 4, 2006 I-95, resurfacing from Sherburne Road to Spaulding Turnpike
Hillsborough-Henniker 14447 X-A000(387) May 11, 2006 US 202/NH 9, Pavement rehabilitation and roadway work
Hooksett 13715   Mach 30, 2006 Pine Street, bridge rehabilitation over I-93/F.E.E.T.
Hopkinton-Warner-Sunapee-Lebanon 14608 X-A000(465) June 22, 2006 I-89 Crack seal Exit 5 north 6.5 miles to Exit 7 & at Exit 12A north
Hudson-Londonderry 13743   January 5, 2006 NH 102, West Road and Robinson intersection improvements
Keene-Milford 13856 X-A000(061) March 9, 2006 NH 101, upgrade guardrail & terminal units
Keene-Swanzey 10309H & 10309O A000(281) & A000(457) October 5, 2006 NH 9/10/12/101, intersection improvements
Lincoln 13334-A X-A000(462) April 20, 2006 NH 112, Paving and guardrail work
Livermore-Albany 14512 X-A000(475) December 5, 2006 NH112, Replace existing guardrail
Manchester-Concord 14099-A   May 8, 2006 I-93 & I-293, Replace signs & 3 overhead sign structures
Meredith 11386 F-X-0291(011) September 14, 2006 US 3, Widen and construct a roundabout at the Parade Road intersection
Milton 14660   July 27, 2006 NH 16, Slope and drainage repairs
Monroe, NH-Barnet, VT 14095 A000(336) January 26, 2006 Bridge rehabilitation over the Connecticut River
Nashua-Merrimack-Hooksett 14507   April 5, 2006 FE Everett Tpk, resurfacing between exits 4 & 5
New London to Enfield 14255 X-A000(261) March 2, 2006 I-89, Update signing from Exit 14 to Exit 12
Portsmouth-Milton 14232   March 30, 2006 Spaulding Turnpike & I-95, install emergency reference markers
Resurfacing District 1 14581   April 4, 2006 Counties of Coos, Carroll & Grafton
Resurfacing District 2 14582   April 5, 2006 Counties of Grafton, Merrimack & Sullivan
Resurfacing District 3 14583   April 6, 2006 Counties of Belknap, Gragton & Merrimack
Resurfacing District 4 14584   April 4, 2006 Counties of Cheshire, Hillsboro & Sullivan
Resurfacing District 5 14585   April 6, 2006 Counties of Hillsborough, Merrimack & Rockingham
Resurfacing District 6 14586   April 5, 2006 Counties of Merrimack, Strafford & Rockingham
Salem to Manchester 10418-I A000(210) September 21, 2006 I-93, Construct park & ride @ Exit 5 (Londonderry)
Salem to Manchester 13933-B A000(122) October 12, 2006 I-93, Replace Cross Street bridge & approaches
Salem-Manchester & Plaistow-Kingston 10418-S & 10044-J X-A000(481) November 2, 2006 Building demolitions
Statewide crack seal 14595 X-A000(455) May 18, 2006 Crack seal roads in the 2001 resurfacing program
Statewide 14480   July 13, 2006 Snow fence installation on various bridges in District 1
Stratham-Epping-Lee 14452 X-A000(392) May 8, 2006 NH 125, Pavement rehabilitation and roadway work
Sullivan-Stoddard 14599 X-A000(459) May 4, 2006 NH 9, Pavement rehabilitation and roadway work
Sutton 14328-A A000(322) March 23, 2006 I-89 southbound, remedial rock work
Turnpike guardrail repairs 14628   July 20, 2006 guardrail repairs
Winchester 14360   March 9, 2006 NH 10, replace existing span wire signal system
Woodstock-Lincoln 14361   May 4, 2006 I-93, Exit 32, replace existing traffic signals
2008 PUBLIC WORKS PROJECT BID RESULTS
Project Name State
Project
Number
Federal
Project
Number
Bid Open Scope of Work
Benton 97970-I   March 16, 2006 Asbestos abatement @Glencliff Home
Benton 80223   July 13, 2006 Water damage repair @ Glencliff Home
Benton 80224-B   October 5, 2006 New kitchen @ Glenncliff Home
Claremont 80230   April 6, 2006 Library addition & renovations @ N.H.C.T.C.
Concord 80209-A   March 9, 2006 Replace cooling units @ Data Center
Concord 80086-B   March 9, 2006 Renovations to Representative Hall
Concord 80214   March 30, 2006 Reroofing & repairs @ NH State Prison
Concord 80221   April 27, 2006 Sprinkler system upgrade @ NH Hospital
Concord 80260   May 25, 2006 North Hall remediation and restoration @ NH Technical Institute
Concord 80234R   July 20, 2006 Bistro renovations @NH Technical Institute
Concord 80287R-A   August 24, 2006 Upgrade air conditioning @ Nat'l Guard
Concord 80280   August 24, 2006 Repair & replace catch basins at Hazen Drive complex
Concord 80208   August 31, 2006 Retrofit HVAC system @ Supreme Court
Concord 80216   August 31, 2006 Boiler replacement @ Corrections
Concord 80194-A   September 28, 2006 Re-pointing & joint sealants @ State House & State Library
Concord 80144R-A   September 28, 2006 Roof replacement @ Fish & Games Headquarters
Concord 80220   November 2, 2006 Electrical and fire alarm replacement @ Dolloff Building
Hampton 80236R   March 16, 2006 Hampton beach sea wall & rail repair
Hooksett 80272R-A   July 13, 2006 Heating system replacement & office renovations
Jaffrey 80186R-F   April 27, 2006 Construct Gilson Pond campground
Manchester 80202   December 21, 2006 Roof repair & replacement @ court facilities
Nashua 80233R   November 16, 2006 Design/Build Wellness Center renovations at NH Technical College
New Durham 80295R   October 19, 2006 Remove & install underground tanks @ Powder Mill Fish Hatchery
New London 80126R-M   October 26, 2006 Construct Highway Maintenance & Salt Storage Buildings
Portsmouth 80232B   October 26, 2006 Classroom and library renovations @ NH Technical College
Sargent's Purchase 80179R   May 4, 2006 Mt Washington summit electrical building
Statewide 80258-R   January 5, 2006 Design/Build generator installations
Statewide 80249R-B   April 27, 2006 Construct salt storage buildings
Statewide 80286R-A   August 24, 2006 Armory site improvements




New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire