THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: MILTON 14660 COUNTIES AND CODES: STRAFFORD 017 DATE BIDS OPEN: JULY 27, 2006 SCOPE OF WORK: EMBANKMENT STABILIZATION AND DRAINAGE WORK LOCATION: NH ROUTE 16 (SPAULDING TURNPIKE) COMPLETION DATE: OCTOBER 20, 2006 A VICTOR VIRGIN CONST. CORP. 346 LAKE SHORE DR., FRANKLIN, NH 03235 $ 344,315.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 5,200. 7.50 39,000.00 203.62 EMBANKMENT-IN-PLACE (MODIFIED) CY 4,600. 21.00 96,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 8. 150.00 1,200.00 413.1 HOT-POURED CRACK SEALANT LB 760. 3.00 2,280.00 585.3 STONE FILL, CLASS C CY 910. 27.00 24,570.00 585.4 STONE FILL, CLASS D CY 500. 30.00 15,000.00 603.34115 15" STEEL END SECTIONS EA 1. 250.00 250.00 603.34118 18" STEEL END SECTIONS EA 1. 265.00 265.00 603.83115 15" PLASTIC PIPE (CORR. INTERIOR) LF 100. 32.00 3,200.00 604.0007 POLYETHYLENE LINER EA 1. 145.00 145.00 604.12 CATCH BASINS TYPE B U 1. 2,500.00 2,500.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 280. 19.00 5,320.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 5. 100.00 500.00 606.91 RESETTING OR SETTING GUARDRAIL LF 25. 55.00 1,375.00 607.1 WOVEN WIRE FENCE LF 200. 20.00 4,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 20. 10.00 200.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 15,000.00 15,000.00 618.7 FLAGGERS HR 350. 19.00 6,650.00 619.1 MAINTENANCE OF TRAFFIC U 1. 11,500.00 11,500.00 622.1 STEEL WITNESS MARKERS EA 3. 125.00 375.00 628.2 SAWED BITUMINOUS PAVEMENT LF 40. 4.00 160.00 645.3 EROSION STONE TON 50. 28.00 1,400.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 50. 10.00 500.00 14660 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.531 SILT FENCE LF 1,600. 5.00 8,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 15. 175.00 2,625.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .8 2,000.00 1,600.00 647.1 HUMUS CY 310. 30.00 9,300.00 670.047 CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD U 1. 13,400.00 13,400.00 692. MOBILIZATION U 1. 50,400.00 50,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,500.00 2,500.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 $344,315.00