THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT V 14585 COUNTIES AND CODES: HILLSBOROUGH 011 MERRIMACK 013 ROCKINGHAM 015 DATE BIDS OPEN: APRIL 6, 2006 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 31, 2006 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,507,931.25 B BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,746,850.00 C CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 2,922,075.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 11,900. 15.00 178,500.00 18.00 214,200.00 18.00 214,200.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 14,300. 47.25 675,675.00 53.00 757,900.00 56.00 800,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 115. 85.00 9,775.00 100.00 11,500.00 95.00 10,925.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 125. 47.25 5,906.25 100.00 12,500.00 70.00 8,750.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 30,700. 47.25 1,450,575.00 50.00 1,535,000.00 51.00 1,565,700.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 10,600. 2.00 21,200.00 5.50 58,300.00 5.50 58,300.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 10. 250.00 2,500.00 250.00 2,500.00 400.00 4,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 618.7 FLAGGERS HR 1,700. 19.00 32,300.00 22.00 37,400.00 22.00 37,400.00 632.93 OBLITERATE PAVEMENT MARKINGS, SNOW PLOWABLE RAISED PAVEMENT MARKINGS EA 150. 10.00 1,500.00 15.00 2,250.00 100.00 15,000.00 692. MOBILIZATION U 1. 25,000.00 25,000.00 10,300.00 10,300.00 102,000.00 102,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 $2,507,931.25 $2,746,850.00 $2,922,075.00