THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPTON-PORTSMOUTH-DOVER-ROCHESTER 14522 COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: APRIL 4, 2006 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 15, 2006 A BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,155,257.50 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,347,035.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 5,000. 18.00 90,000.00 17.90 89,500.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 28,000. 54.00 1,512,000.00 56.90 1,593,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 200. 100.00 20,000.00 100.00 20,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,000. 54.00 54,000.00 65.00 65,000.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 78,000. 1.97 153,660.00 2.00 156,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 90. 250.00 22,500.00 250.00 22,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 72,000.00 72,000.00 72,000.00 72,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 35,000.00 35,000.00 75,000.00 75,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 6,000.00 12,000.00 5,000.00 10,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 12,500. .12 1,500.00 .12 1,500.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 174,000. .14 24,360.00 .14 24,360.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 14,800. 1.15 17,020.00 1.50 22,200.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 200. 1.85 370.00 3.00 600.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 850. 3.35 2,847.50 5.50 4,675.00 692. MOBILIZATION U 1. 63,000.00 63,000.00 115,500.00 115,500.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 14522 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 $2,155,257.50 $2,347,035.00