THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: LIVERMORE-ALBANY X-A000(475), 14512 COUNTIES AND CODES: GRAFTON 009 CARROLL 003 DATE BIDS OPEN: DECEMBER 5, 2006 SCOPE OF WORK: GUARDRAIL REPLACEMENT LOCATION: NH ROUTE 112 (KANCAMAGUS HIGHWAY) COMPLETION DATE: SEPTEMBER 14, 2007 A CWS FENCE & GUARDRAIL 18 TEN PENNY LANE, ANDOVER, NH 03216 $ 1,347,022.00 B DELUCCA FENCE COMPANY, INC. FIVE OLD FERRY ROAD, METHUEN, MA 01844 $ 1,391,354.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 29,025. 1.00 29,025.00 2.97 86,204.25 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 1,100. 16.80 18,480.00 18.00 19,800.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 41. 1,312.50 53,812.50 900.00 36,900.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 37. 945.00 34,965.00 725.00 26,825.00 203.5596 GUARDRAIL E-2 PLATFORM LF 1,900. 16.80 31,920.00 15.50 29,450.00 203.601 EMBANKMENT-IN-PLACE CY 50. 7.35 367.50 50.00 2,500.00 206.2 ROCK STRUCTURE EXCAVATION CY 100. 68.25 6,825.00 80.00 8,000.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 5,300. 21.00 111,300.00 27.00 143,100.00 585.2 STONE FILL, CLASS B CY 250. 47.25 11,812.50 46.00 11,500.00 585.3 STONE FILL, CLASS C CY 75. 47.25 3,543.75 46.00 3,450.00 603.34112 12" STEEL END SECTIONS EA 30. 147.00 4,410.00 225.00 6,750.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAIN LF 275. 29.40 8,085.00 24.50 6,737.50 603.83112 12" PLASTIC PIPE (CORR. INTERIOR) LF 25. 31.50 787.50 45.00 1,125.00 604.0007 POLYETHYLENE LINER EA 35. 246.75 8,636.25 270.00 9,450.00 604.246 DROP INLETS TYPE D-F U 30. 2,100.00 63,000.00 1,750.00 52,500.00 606.0001 STEEL BEAM FOR BEAM GUARDRAIL, INCLUDING HARDWARE LF 3,300. 7.00 23,100.00 7.00 23,100.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 25. 45.00 1,125.00 60.00 1,500.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 25. 10.00 250.00 15.00 375.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 26,500. 18.85 499,525.00 17.40 461,100.00 14512 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 41. 2,040.00 83,640.00 2,175.00 89,175.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 37. 1,640.00 60,680.00 1,725.00 63,825.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 5. 500.00 2,500.00 470.00 2,350.00 606.1485 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 16. 1,100.00 17,600.00 900.00 14,400.00 606.1496 BEAM GUARDRAIL (TERMINAL UNIT TYPE E-2) LF 1,000. 26.00 26,000.00 23.65 23,650.00 606.1497 BEAM GUARDRAIL TERMINAL TYPE E-2 MODIFIED LF 1,100. 26.00 28,600.00 23.65 26,015.00 618.7 FLAGGERS HR 2,500. 20.00 50,000.00 10.50 26,250.00 619.1 MAINTENANCE OF TRAFFIC U 1. 13,307.00 13,307.00 46,000.00 46,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 350. 4.00 1,400.00 4.25 1,487.50 621.31 SINGLE DELINEATOR WITH POST EA 350. 28.00 9,800.00 27.00 9,450.00 622.1 STEEL WITNESS MARKERS EA 30. 25.00 750.00 22.00 660.00 645.531 SILT FENCE LF 6,500. 4.00 26,000.00 2.00 13,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,500.00 7,500.00 7,000.00 7,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 30.00 3,000.00 35.00 3,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .75 2,500.00 1,875.00 2,500.00 1,875.00 647.1 HUMUS CY 350. 24.00 8,400.00 31.00 10,850.00 692. MOBILIZATION U 1. 50,000.00 50,000.00 76,500.00 76,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008.6 ALTERATIONS AND ADDITIONS AS NEEDED - PAVEMENT PATCH $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 $1,347,022.00 $1,391,354.25