THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: CANAAN-DORCHESTER 14478 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: MARCH 30, 2006 SCOPE OF WORK: PAVEMENT REHABILITATION AND DRAINAGE WORK LOCATION: NH ROUTE 118 NORTH OF THE BRIDGE OVER THE INDIAN RIVER COMPLETION DATE: AUGUST 25, 2006 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,249,679.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 175. 3.00 525.00 203.3 UNCLASSIFIED EXCAVATION CY 125. 19.00 2,375.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 6. 2,500.00 15,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 125. 140.00 17,500.00 209.4 GRANULAR BACKFILL (GRAV) CY 200. 48.00 9,600.00 214. FINE GRADING U 1. 41,000.00 41,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,250. 22.00 27,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 100. 66.00 6,600.00 306.108 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 8" DEEP (F) SY 18,490. 1.30 24,037.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 3,000. 17.00 51,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 5,000. 56.00 280,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 250. 125.00 31,250.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 900. 60.00 54,000.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 1,000. 17.00 17,000.00 520.0001 PRECAST CONCRETE BOX CULVERT U 1. 45,000.00 45,000.00 570.401 MORTAR RUBBLE MASONRY CY 4.25 595.00 2,528.75 585.2 STONE FILL, CLASS B CY 15. 68.00 1,020.00 585.3 STONE FILL, CLASS C CY 50. 47.00 2,350.00 603.00224 24" R.C. PIPE, 2000D LF 145. 93.00 13,485.00 603.00236 36" R.C. PIPE, 2000D LF 250. 120.00 30,000.00 603.00248 48" R.C. PIPE, 2000D LF 100. 200.00 20,000.00 603.15464 64" X 43"CORR. STEEL PIPE-ARCH, .109" LF 50. 265.00 13,250.00 14478 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.30124 24" R.C. END SECTIONS EA 4. 1,050.00 4,200.00 603.30136 36" R.C. END SECTIONS EA 2. 1,450.00 2,900.00 603.30148 48" R.C. END SECTIONS EA 4. 2,050.00 8,200.00 603.34118 18" STEEL END SECTIONS EA 1. 235.00 235.00 603.44012 12" CORRUGATED POLY PIPE FOR SLOPE DRAIN LF 100. 24.00 2,400.00 603.83118 18" PLASTIC PIPE (CORR. INTERIOR) LF 375. 95.00 35,625.00 603.83124 24" PLASTIC PIPE (CORR. INTERIOR) LF 50. 105.00 5,250.00 603.86920 20" OD SOLID WALL POLY PIPE FOR EXISTING 24" PIPE LF 60. 190.00 11,400.00 603.8699 CONTROLLED DENSITY FILL CONCRETE CY 7. 545.00 3,815.00 604.242 DROP INLETS TYPE D-B U 2. 1,250.00 2,500.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 1. 500.00 500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 600. 24.00 14,400.00 605.82251 24" AGGREGATE UNDERDRAIN, TYPE 2 WITH 6" PERF. CORR. POLY. PIPE LF 2,550. 35.00 89,250.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 900. 21.00 18,900.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 6. 2,450.00 14,700.00 606.1485 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 4. 2,450.00 9,800.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 50. 10.00 500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 618.7 FLAGGERS HR 3,000. 20.00 60,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 67,000.00 67,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 15. 5.60 84.00 621.31 SINGLE DELINEATOR WITH POST EA 200. 30.00 6,000.00 622.1 STEEL WITNESS MARKERS EA 25. 26.00 650.00 628.2 SAWED BITUMINOUS PAVEMENT LF 125. 2.20 275.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 177,500. .12 21,300.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 150. 11.00 1,650.00 645.3 EROSION STONE TON 500. 40.00 20,000.00 645.531 SILT FENCE LF 5,000. 2.90 14,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,350.00 4,350.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 75. 55.00 4,125.00 14478 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1. 2,350.00 2,350.00 647.1 HUMUS CY 100. 48.00 4,800.00 692. MOBILIZATION U 1. 68,000.00 68,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 $1,249,679.75