THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SUTTON A000(322), 14328A COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MARCH 23, 2006 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: I-89 SOUTH OF EXIT 10 COMPLETION DATE: JUNE 8, 2007 A WEAVER BROS. CONST. CO. INC. PO BOX 1326, CONCORD, NH 03302 $ 3,948,629.00 B GEORGE R CAIRNS AND SONS INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 3,979,532.25 C R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 4,185,445.40 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.0101 CLEARING A .5 5,000.00 2,500.00 5,750.00 2,875.00 7,500.00 3,750.00 201.101 CLEARING AND GRUBBING A 4. 5,500.00 22,000.00 7,000.00 28,000.00 11,000.00 44,000.00 202.31 FILL ABANDONED PIPE CY 70. 150.00 10,500.00 98.00 6,860.00 200.00 14,000.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 1,770. 6.50 11,505.00 11.50 20,355.00 15.00 26,550.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 45. 15.00 675.00 28.75 1,293.75 20.00 900.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 8. 300.00 2,400.00 345.00 2,760.00 225.00 1,800.00 202.701 REMOVAL OF GUARDRAIL LF 6,100. 1.65 10,065.00 2.00 12,200.00 1.50 9,150.00 203.1 COMMON EXCAVATION CY 23,600. 5.90 139,240.00 3.70 87,320.00 8.40 198,240.00 203.2 ROCK EXCAVATION CY 25,800. 13.40 345,720.00 11.75 303,150.00 12.00 309,600.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 111. 25.00 2,775.00 55.00 6,105.00 12.65 1,404.15 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 825.00 2,475.00 1,280.00 3,840.00 1,400.00 4,200.00 203.55549 TEMPORARY GUARDRAIL 50 FT EAGRT PLATFORM U 2. 950.00 1,900.00 1,925.50 3,851.00 1,400.00 2,800.00 203.5596 GUARDRAIL E-2 PLATFORM LF 325. 12.00 3,900.00 30.00 9,750.00 12.65 4,111.25 203.601 EMBANKMENT-IN-PLACE CY 31,800. 6.75 214,650.00 4.70 149,460.00 4.00 127,200.00 203.81 PRESPLITTING HOLES LF 5,600. 9.25 51,800.00 6.60 36,960.00 4.00 22,400.00 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 2,450. 2.10 5,145.00 2.30 5,635.00 2.00 4,900.00 203.91 ROCK SCALING HAND METHOD HR 200. 75.00 15,000.00 125.35 25,070.00 600.00 120,000.00 203.92 ROCK SCALING MACHINE METHOD HR 120. 250.00 30,000.00 172.00 20,640.00 420.00 50,400.00 206.1 COMMON STRUCTURE EXCAVATION CY 240. 12.00 2,880.00 17.25 4,140.00 11.50 2,760.00 206.2 ROCK STRUCTURE EXCAVATION CY 2,350. 46.00 108,100.00 58.00 136,300.00 38.00 89,300.00 14328A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.1 GRANULAR BACKFILL CY 170. 22.00 3,740.00 25.00 4,250.00 25.00 4,250.00 214. FINE GRADING U 1. 121,000.00 121,000.00 46,000.00 46,000.00 50,000.00 50,000.00 214.3 FINE GRADING EARTH BERMS IN ROCKCUTS LF 875. 3.50 3,062.50 5.00 4,375.00 8.00 7,000.00 224.1 HORIZONTAL DRAIN HOLES LF 4,300. 9.50 40,850.00 8.00 34,400.00 4.00 17,200.00 225.2 PRESTRESSED ROCK BOLTS LF 1,200. 75.00 90,000.00 92.00 110,400.00 100.00 120,000.00 225.3 ROCK DOWELS (UNTENSIONED ROCK BOLT) LF 600. 75.00 45,000.00 80.50 48,300.00 100.00 60,000.00 304.101 SAND CY 8,300. 13.25 109,975.00 15.50 128,650.00 14.00 116,200.00 304.201 GRAVEL CY 4,150. 14.25 59,137.50 13.25 54,987.50 17.00 70,550.00 304.301 CRUSHED GRAVEL CY 11,000. 20.00 220,000.00 13.25 145,750.00 17.00 187,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 340. 20.00 6,800.00 17.00 5,780.00 15.00 5,100.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 5,500. 55.00 302,500.00 57.50 316,250.00 50.00 275,000.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 1,550. 55.00 85,250.00 57.50 89,125.00 50.00 77,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 90.00 6,300.00 103.50 7,245.00 90.00 6,300.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,200. 57.00 68,400.00 57.50 69,000.00 50.00 60,000.00 417. COLD PLANING BITUMINOUS SURFACES (F) SY 15,300. 2.75 42,075.00 2.90 44,370.00 3.00 45,900.00 520.1 CONCRETE CLASS A CY 15. 500.00 7,500.00 1,150.00 17,250.00 1,000.00 15,000.00 544.1 REINFORCING STEEL (ROADWAY) LB 120. 4.30 516.00 6.00 720.00 2.00 240.00 570.4 MORTAR RUBBLE MASONRY (F) CY 3. 425.00 1,275.00 1,150.00 3,450.00 450.00 1,350.00 585.2 STONE FILL, CLASS B CY 1,650. 20.00 33,000.00 34.25 56,512.50 18.00 29,700.00 585.3 STONE FILL, CLASS C CY 60. 35.00 2,100.00 40.00 2,400.00 24.00 1,440.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 75. 3.50 262.50 3.00 225.00 5.35 401.25 593.431 GEOTEXTILE; PERM CONTROL CL.3, NON-WOVEN SY 175. 3.50 612.50 3.00 525.00 5.35 936.25 603.00215 15" R.C. PIPE, 2000D LF 370. 28.00 10,360.00 42.50 15,725.00 50.00 18,500.00 603.00224 24" R.C. PIPE, 2000D LF 65. 50.00 3,250.00 72.00 4,680.00 62.00 4,030.00 603.00230 30" R.C. PIPE, 2000D LF 100. 55.00 5,500.00 84.00 8,400.00 70.00 7,000.00 603.34112 12" STEEL END SECTIONS EA 5. 145.00 725.00 100.00 500.00 180.00 900.00 603.34115 15" STEEL END SECTIONS EA 1. 175.00 175.00 110.00 110.00 190.00 190.00 603.34124 24" STEEL END SECTIONS EA 1. 265.00 265.00 200.00 200.00 250.00 250.00 603.44012 12" CORR. POLY. PIPE FOR SLOPE DRAINAGE LF 125. 26.00 3,250.00 36.00 4,500.00 38.00 4,750.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 55. 26.00 1,430.00 37.00 2,035.00 35.00 1,925.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 930. 26.00 24,180.00 29.00 26,970.00 40.00 37,200.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 20. 40.00 800.00 60.00 1,200.00 50.00 1,000.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 7. 100.00 700.00 200.00 1,400.00 60.00 420.00 14328A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.86924 18" SOLID WALL POLYETHYLE PIPE LINER FOR EXISTING 24" PIPE LF 270. 235.00 63,450.00 355.00 95,850.00 150.00 40,500.00 603.8699 CONTROLLED DENSITY FILL CONCRETE CY 21. 355.00 7,455.00 375.00 7,875.00 250.00 5,250.00 604.12 CATCH BASINS TYPE B U 2.9 1,600.00 4,640.00 1,615.00 4,683.50 1,900.00 5,510.00 604.15 CATCH BASINS TYPE E U 22.9 1,700.00 38,930.00 1,733.00 39,685.70 2,000.00 45,800.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 2. 3,200.00 6,400.00 3,350.00 6,700.00 3,500.00 7,000.00 604.242 DROP INLETS TYPE D-B U 1.1 950.00 1,045.00 1,158.00 1,273.80 1,100.00 1,210.00 604.245 DROP INLETS TYPE D-E U 4. 1,050.00 4,200.00 1,273.00 5,092.00 1,200.00 4,800.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1.5 3,000.00 4,500.00 3,585.00 5,377.50 3,000.00 4,500.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 3.9 300.00 1,170.00 345.00 1,345.50 325.00 1,267.50 604.6 MANHOLE COVERS & FRAMES EA 1. 475.00 475.00 500.00 500.00 500.00 500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 2,050. 14.00 28,700.00 17.50 35,875.00 21.00 43,050.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 990. 23.00 22,770.00 26.00 25,740.00 32.00 31,680.00 605.518 18" PERF. CORR. POLYETHYL PIPE UND. LF 390. 29.00 11,310.00 30.00 11,700.00 36.00 14,040.00 605.831 AGGREGATE DRAIN (BRIDGE) TYPE 1 EA 28. 600.00 16,800.00 600.00 16,800.00 525.00 14,700.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 5,750. 16.00 92,000.00 17.20 98,900.00 15.00 86,250.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 5. 2,100.00 10,500.00 2,300.00 11,500.00 2,000.00 10,000.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 5. 550.00 2,750.00 650.00 3,250.00 500.00 2,500.00 606.1496 BEAM GUARDRAIL TERMINAL TYPE E-2 LF 325. 24.00 7,800.00 28.00 9,100.00 25.00 8,125.00 606.93 TEMPORARY BEAM GUARDRAIL LF 1,200. 10.00 12,000.00 9.80 11,760.00 8.00 9,600.00 606.9347 TEMPORARY BEAM GUARDRAIL (TERM. UNIT TYPE G-2) U 1. 550.00 550.00 500.00 500.00 450.00 450.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 510. 15.00 7,650.00 22.00 11,220.00 30.00 15,300.00 609.5 RESET GRANITE CURB LF 300. 9.00 2,700.00 16.00 4,800.00 6.00 1,800.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 1,500. 4.25 6,375.00 2.90 4,350.00 3.00 4,500.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 102. 90.00 9,180.00 143.50 14,637.00 75.00 7,650.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 1. 550.00 550.00 460.00 460.00 500.00 500.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 1. 275.00 275.00 29.00 29.00 250.00 250.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 550.00 550.00 200.00 200.00 500.00 500.00 615.054 RELOCATING TRAFFIC SIGN TYPE BB U 1. 110.00 110.00 55.00 55.00 100.00 100.00 14328A PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 1. 55.00 55.00 55.00 55.00 50.00 50.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 66,000.00 66,000.00 66,000.00 66,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 9,000.00 27,000.00 23,000.00 69,000.00 25,000.00 75,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,000.00 2,000.00 6,000.00 12,000.00 2,000.00 4,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 70. 4.40 308.00 6.00 420.00 4.00 280.00 621.31 SINGLE DELINEATOR WITH POST EA 60. 32.00 1,920.00 32.00 1,920.00 25.00 1,500.00 621.73 FLEXIBLE DELINEATOR POST W/ BASE (TEMPORARY) EA 450. 65.00 29,250.00 38.00 17,100.00 70.00 31,500.00 622.1 STEEL WITNESS MARKERS EA 25. 27.00 675.00 29.00 725.00 25.00 625.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,150. 3.50 11,025.00 2.00 6,300.00 2.00 6,300.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 130,000. .13 16,900.00 .18 23,400.00 .10 13,000.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 430. .70 301.00 .25 107.50 .50 215.00 632.1106 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 6" LINE LF 41,500. 1.35 56,025.00 1.50 62,250.00 1.25 51,875.00 632.82 RAISED PAVEMENT MARKER, DOUBLE FACE EA 200. 25.00 5,000.00 5.75 1,150.00 22.00 4,400.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 9,300. .38 3,534.00 .35 3,255.00 .40 3,720.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 960. 1.75 1,680.00 1.85 1,776.00 1.50 1,440.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 3,000. 2.00 6,000.00 2.20 6,600.00 2.00 6,000.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,350. 2.30 3,105.00 2.40 3,240.00 2.10 2,835.00 645.3 EROSION STONE TON 1,500. 30.00 45,000.00 30.00 45,000.00 17.00 25,500.00 645.531 SILT FENCE LF 9,700. 2.35 22,795.00 5.00 48,500.00 4.25 41,225.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,800.00 2,800.00 2,875.00 2,875.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 75.00 7,500.00 75.00 7,500.00 60.00 6,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 13. 1,550.00 20,150.00 1,650.00 21,450.00 1,450.00 18,850.00 647.1 HUMUS CY 6,500. 11.30 73,450.00 16.00 104,000.00 19.00 123,500.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 82,000.00 82,000.00 93,000.00 93,000.00 150,000.00 150,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 88,000.00 88,000.00 94,000.00 94,000.00 120,000.00 120,000.00 670.046 CONSTRUCT AND REMOVE TEMPORARY WIDENINGS U 3. 5,000.00 15,000.00 2,100.00 6,300.00 40,000.00 120,000.00 14328A PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.101 TEMPORARY LIGHTING U 1. 5,000.00 5,000.00 5,300.00 5,300.00 4,000.00 4,000.00 670.95 TEMPORARY SAFETY FENCE LF 2,000. 3.25 6,500.00 4.60 9,200.00 4.00 8,000.00 692. MOBILIZATION U 1. 295,000.00 295,000.00 396,000.00 396,000.00 344,000.00 344,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.13 FIELD OFFICE TYPE C MON 15. 1,700.00 25,500.00 1,500.00 22,500.00 1,600.00 24,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 16,500.00 16,500.00 16,500.00 16,500.00 16,500.00 16,500.00 $3,948,629.00 $3,979,532.25 $4,185,445.40