THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HUDSON-LONDONDERRY 13743 COUNTIES AND CODES: HILLSBOROUGH 011 ROCKINGHAM 015 DATE BIDS OPEN: JANUARY 5, 2006 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH 102 INTERSECTION IN THE TOWN OF HUDSON COMPLETION DATE: OCTOBER 13, 2006 A CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 1,664,468.50 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 1,690,809.40 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.101 CLEARING AND GRUBBING HA .5 10,000.00 5,000.00 34,000.00 17,000.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 10. 45.00 450.00 60.00 600.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 5. 300.00 1,500.00 300.00 1,500.00 202.7 REMOVAL OF GUARDRAIL (F) LM 26.8 10.00 268.00 8.00 214.40 203.1 COMMON EXCAVATION M3 17,100. 13.00 222,300.00 10.00 171,000.00 203.2 ROCK EXCAVATION M3 2,050. 50.00 102,500.00 35.00 71,750.00 203.5554 GUARDRAIL 15.2M EAGRT PLATFORM U 3. 750.00 2,250.00 700.00 2,100.00 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 1. 750.00 750.00 400.00 400.00 203.6 EMBANKMENT-IN-PLACE (F) M3 1,910. 7.00 13,370.00 12.00 22,920.00 206.1 COMMON STRUCTURE EXCAVATION M3 40. 20.00 800.00 20.00 800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 50. 25.00 1,250.00 33.00 1,650.00 206.2 ROCK STRUCTURE EXCAVATION M3 40. 90.00 3,600.00 125.00 5,000.00 209.1 GRANULAR BACKFILL M3 75. 35.00 2,625.00 40.00 3,000.00 211.11 VIBRATION MONITORING SERVICES HR 40. 80.00 3,200.00 75.00 3,000.00 214. FINE GRADING U 1. 30,000.00 30,000.00 50,000.00 50,000.00 304.1 SAND (F) M3 3,725. 18.30 68,167.50 20.00 74,500.00 304.2 GRAVEL (F) M3 4,360. 23.50 102,460.00 30.00 130,800.00 304.3 CRUSHED GRAVEL (F) M3 4,870. 28.00 136,360.00 30.00 146,100.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 150. 30.00 4,500.00 32.00 4,800.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 135. 30.00 4,050.00 32.00 4,320.00 13743 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11053 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE)(QC/QA TIER 3 T 5,650. 50.00 282,500.00 50.00 282,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 160. 90.00 14,400.00 90.00 14,400.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE T 400. 50.00 20,000.00 45.00 18,000.00 417.01 COLD PLANING BITUMINOUS SURFACES M2 1,200. 7.00 8,400.00 7.00 8,400.00 570.4 MORTAR RUBBLE MASONRY (F) M3 9. 450.00 4,050.00 510.00 4,590.00 585.2 STONE FILL, CLASS B M3 100. 30.00 3,000.00 35.00 3,500.00 585.3 STONE FILL, CLASS C M3 800. 30.00 24,000.00 40.00 32,000.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 60. 4.00 240.00 6.00 360.00 603.00204 375 MM R.C. PIPE, CLASS III LM 20. 70.00 1,400.00 200.00 4,000.00 603.34104 375 MM STEEL END SECTION EA 2. 400.00 800.00 190.00 380.00 603.34105 450 MM STEEL END SECTION EA 2. 500.00 1,000.00 210.00 420.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 108. 110.00 11,880.00 50.00 5,400.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 40. 115.00 4,600.00 60.00 2,400.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 4. 150.00 600.00 75.00 300.00 604.0007 POLYETHYLENE LINER EA 2. 200.00 400.00 225.00 450.00 604.12 CATCH BASINS TYPE B U 6. 1,800.00 10,800.00 1,650.00 9,900.00 604.15 CATCH BASINS TYPE E U 2. 2,000.00 4,000.00 1,700.00 3,400.00 604.32 DRAINAGE MANHOLES U 1. 1,800.00 1,800.00 1,650.00 1,650.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 740. 70.00 51,800.00 70.00 51,800.00 605.79 UNDERDRAIN FLUSHING BASINS EA 5. 550.00 2,750.00 500.00 2,500.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 141. 52.00 7,332.00 50.00 7,050.00 606.1454 BEAM GUARDRAIL (TERMINAL UNIT EAGRT 15.2M) U 3. 2,000.00 6,000.00 2,000.00 6,000.00 606.1455 BEAM GUARDRAIL (TERMINAL UNIT EAGRT 7.6M) U 1. 1,850.00 1,850.00 1,650.00 1,650.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 95. 50.00 4,750.00 75.00 7,125.00 606.91 RESETTING OR SETTING GUARDRAIL LM 111. 36.00 3,996.00 25.00 2,775.00 608.215 150 MM CONCRETE SIDEWALK (F) M2 195. 50.00 9,750.00 40.00 7,800.00 609.2115 STRAIGHT GRANITE SLOPE CURB 150 MM HIGH LM 210. 60.00 12,600.00 40.00 8,400.00 609.2315 CURVED GRANITE SLOPE CURB 150 MM HIGH LM 17. 150.00 2,550.00 160.00 2,720.00 609.5 RESET GRANITE CURB LM 45. 40.00 1,800.00 16.00 720.00 614.511 CONCRETE PULL BOX 350 MM EA 20. 400.00 8,000.00 300.00 6,000.00 13743 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 9. 400.00 3,600.00 275.00 2,475.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 140. 50.00 7,000.00 25.00 3,500.00 614.70828 75 MM 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LM 475. 55.00 26,125.00 40.00 19,000.00 615.004 RELOCATING TRAFFIC SIGN U 2. 1,000.00 2,000.00 325.00 650.00 615.03 TRAFFIC SIGN TYPE C (F) M2 14. 375.00 5,250.00 375.00 5,250.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 155.00 155.00 155.00 155.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 2. 175.00 350.00 165.00 330.00 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 4. 125.00 500.00 125.00 500.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 40,000.00 40,000.00 16,500.00 16,500.00 618.6 UNIFORMED OFFICERS $ 1. 18,000.00 18,000.00 18,000.00 18,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 618.7 FLAGGERS HR 800. 20.00 16,000.00 17.00 13,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 55,000.00 55,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 5,000.00 10,000.00 17,500.00 35,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 25. 5.00 125.00 4.00 100.00 621.31 SINGLE DELINEATOR WITH POST EA 34. 30.00 1,020.00 25.00 850.00 622.1 STEEL WITNESS MARKERS EA 21. 25.00 525.00 23.00 483.00 622.2 CONCRETE BOUNDS EA 10. 300.00 3,000.00 300.00 3,000.00 622.4 STONE BOUNDS EA 2. 300.00 600.00 300.00 600.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 2. 500.00 1,000.00 500.00 1,000.00 625.52 LIGHT POLE (HIGHWAY) U 2. 2,500.00 5,000.00 2,000.00 4,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 130. 6.00 780.00 6.00 780.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 16,000. .70 11,200.00 .40 6,400.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 60. 10.00 600.00 3.50 210.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 30. 25.00 750.00 16.75 502.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD M2 30. 105.00 3,150.00 38.50 1,155.00 632.4145 RETROREFLECTIVE PREFORMED THERMOPLASTIC PAVEMENT MARKING, 450MM LINE LM 60. 17.00 1,020.00 8.20 492.00 641. LOAM M3 300. 30.00 9,000.00 40.00 12,000.00 13743 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) M2 2,100. 2.10 4,410.00 2.10 4,410.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 2,000. 2.30 4,600.00 2.30 4,600.00 645.3 EROSION STONE T 300. 30.00 9,000.00 40.00 12,000.00 645.531 SILT FENCE LM 1,325. 10.00 13,250.00 8.50 11,262.50 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,600.00 2,600.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 80. 60.00 4,800.00 60.00 4,800.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 1.1 3,600.00 3,960.00 3,600.00 3,960.00 647.1 HUMUS M3 750. 25.00 18,750.00 30.00 22,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 200.00 200.00 200.00 200.00 670.101 TEMPORARY LIGHTING U 1. 1,500.00 1,500.00 1,500.00 1,500.00 678.13 IMPACT ATTENUATION DEVICE (SAND BARREL CRASH CUSHION), TEST LEV 3 (F) U 1. 4,000.00 4,000.00 4,000.00 4,000.00 692. MOBILIZATION U 1. 98,500.00 98,500.00 138,000.00 138,000.00 698.14 FIELD OFFICE TYPE D MON 9. 1,500.00 13,500.00 1,700.00 15,300.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 6,200.00 6,200.00 6,200.00 6,200.00 $1,664,468.50 $1,690,809.40