THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BARTLETT BRF-MGS-X-032-1(23), 13043 COUNTIES AND CODES: CARROLL 003 DATE BIDS OPEN: OCTOBER 4, 2006 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: US ROUTE 302 AND WEST SIDE ROAD COMPLETION DATE: OCTOBER 17, 2008 A R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $10,583,772.65 B ALVIN J. COLEMAN & SON INC. 9 NH RTE. 113, CONWAY, NH 03818 $10,686,931.84 C CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $10,712,126.47 D R.S. AUDLEY, INC 609 RT 3A, BOW, NH 03304 $10,777,918.10 E SARGENT CORPORATION 378 BENNOCH RD., STILLWATER, ME 04489 $11,752,522.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 5.12 8,000.00 40,960.00 15,000.00 76,800.00 15,000.00 76,800.00 201.21 REMOVING SMALL TREES EA 19. 450.00 8,550.00 378.04 7,182.76 500.00 9,500.00 201.22 REMOVING LARGE TREES EA 1. 850.00 850.00 810.08 810.08 1,500.00 1,500.00 201.4 REMOVING STUMPS EA 1. 200.00 200.00 864.08 864.08 300.00 300.00 202.101 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 2,500.00 2,500.00 3,500.00 3,500.00 50,000.00 50,000.00 202.31 FILL ABANDONED PIPE CY 3. 250.00 750.00 216.02 648.06 215.00 645.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 545. 15.00 8,175.00 20.41 11,123.45 15.00 8,175.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 42. 40.00 1,680.00 78.95 3,315.90 47.00 1,974.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,439. 3.00 7,317.00 1.63 3,975.57 3.50 8,536.50 203.1 COMMON EXCAVATION CY 14,550. 6.00 87,300.00 7.56 109,998.00 8.00 116,400.00 203.2 ROCK EXCAVATION CY 230. 30.00 6,900.00 54.01 12,422.30 13.00 2,990.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 14. 1,600.00 22,400.00 2,700.26 37,803.64 900.00 12,600.00 203.6 EMBANKMENT-IN-PLACE (F) CY 45,740. 8.40 384,216.00 15.12 691,588.80 7.00 320,180.00 206.1 COMMON STRUCTURE EXCAVATION CY 725. 8.00 5,800.00 17.28 12,528.00 8.00 5,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 200. 20.00 4,000.00 54.01 10,802.00 57.00 11,400.00 206.2 ROCK STRUCTURE EXCAVATION CY 870. 40.00 34,800.00 86.41 75,176.70 10.00 8,700.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 1,475. 12.00 17,700.00 19.44 28,674.00 12.00 17,700.00 209.1 GRANULAR BACKFILL CY 200. 24.00 4,800.00 23.76 4,752.00 21.00 4,200.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 5,700. 23.00 131,100.00 23.76 135,432.00 18.00 102,600.00 13043 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.202 GRANULAR BACKFILL (BRIDGE) (F) CY 1,900. 23.00 43,700.00 23.76 45,144.00 18.00 34,200.00 209.3 GRANULAR BACKFILL (SAND) CY 250. 20.00 5,000.00 32.40 8,100.00 13.00 3,250.00 211.11 VIBRATION MONITORING SERVICES HR 600. 80.00 48,000.00 108.01 64,806.00 75.00 45,000.00 214. FINE GRADING U 1. 75,000.00 75,000.00 43,204.23 43,204.23 120,000.00 120,000.00 304.1 SAND (F) CY 4,580. 20.00 91,600.00 23.76 108,820.80 21.00 96,180.00 304.2 GRAVEL (F) CY 5,513. 22.00 121,286.00 23.76 130,988.88 24.00 132,312.00 304.3 CRUSHED GRAVEL (F) CY 5,991. 28.00 167,748.00 27.00 161,757.00 28.00 167,748.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 950. 35.00 33,250.00 28.08 26,676.00 34.00 32,300.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 70. 40.00 2,800.00 28.08 1,965.60 52.00 3,640.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 860. 30.00 25,800.00 32.40 27,864.00 35.00 30,100.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 4,900. 68.00 333,200.00 70.76 346,724.00 70.00 343,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 540. 120.00 64,800.00 135.01 72,905.40 130.00 70,200.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 46. 150.00 6,900.00 270.03 12,421.38 250.00 11,500.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 95. 93.00 8,835.00 81.01 7,695.95 80.00 7,600.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,750. 70.00 122,500.00 70.76 123,830.00 70.00 122,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,150. 7.75 24,412.50 7.78 24,507.00 8.00 25,200.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 110,000.00 110,000.00 159,732.51 159,732.51 25,000.00 25,000.00 501.101 TEMPORARY BRIDGE U 1. 860,000.00 860,000.00 506,761.83 506,761.83 160,000.00 160,000.00 501.102 TEMPORARY BRIDGE U 1. 285,000.00 285,000.00 191,866.73 191,866.73 315,000.00 315,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 90,000.00 90,000.00 236,606.37 236,606.37 110,000.00 110,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 30,000.00 30,000.00 49,765.87 49,765.87 125,000.00 125,000.00 502.103 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 40,000.00 40,000.00 65,978.26 65,978.26 35,000.00 35,000.00 502.104 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 50,000.00 50,000.00 42,480.56 42,480.56 85,000.00 85,000.00 503.201 COFFERDAMS U 1. 165,000.00 165,000.00 173,897.02 173,897.02 150,000.00 150,000.00 503.202 COFFERDAMS U 1. 160,000.00 160,000.00 23,087.26 23,087.26 .01 .01 503.203 COFFERDAMS U 1. 26,500.00 26,500.00 179,297.54 179,297.54 125,000.00 125,000.00 503.204 COFFERDAMS U 1. 70,000.00 70,000.00 61,566.02 61,566.02 46,000.00 46,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 135,000.00 135,000.00 100,449.83 100,449.83 105,000.00 105,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,800. 11.00 63,800.00 19.44 112,752.00 7.00 40,600.00 504.11 COMMON BRIDGE EXCAVATION (F) CY 1,900. 10.00 19,000.00 24.31 46,189.00 7.00 13,300.00 13043 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 504.2 ROCK BRIDGE EXCAVATION CY 100. 60.00 6,000.00 102.61 10,261.00 6.00 600.00 508. STRUCTURAL FILL CY 330. 40.00 13,200.00 43.20 14,256.00 33.00 10,890.00 520.0001 PRECAST CONCRETE BOX CULVERT U 1. 26,700.00 26,700.00 35,068.48 35,068.48 30,000.00 30,000.00 520.0002 PRECAST CONCRETE BOX CULVERT U 1. 34,000.00 34,000.00 37,643.74 37,643.74 52,000.00 52,000.00 520.0003 PRECAST CONCRETE BOX CULVERT U 1. 64,000.00 64,000.00 70,957.30 70,957.30 70,000.00 70,000.00 520.0031 PRECAST CONCRETE ARCH FRAME U 1. 245,850.00 245,850.00 251,815.84 251,815.84 300,000.00 300,000.00 520.01 CONCRETE CLASS AA CY 40. 900.00 36,000.00 670.00 26,800.00 800.00 32,000.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 9. 1,100.00 9,900.00 870.00 7,830.00 800.00 7,200.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 110. 300.00 33,000.00 325.00 35,750.00 280.00 30,800.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 1,393.4 600.00 836,040.00 500.00 696,700.00 650.00 905,710.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 352. 500.00 176,000.00 500.00 176,000.00 750.00 264,000.00 520.21 CONCRETE CLASS B, FOOTINGS (F) CY 468. 220.00 102,960.00 350.00 163,800.00 260.00 121,680.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 857. 220.00 188,540.00 300.00 257,100.00 420.00 359,940.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL CY 270. 240.00 64,800.00 185.00 49,950.00 180.00 48,600.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 300. 1,000.00 300,000.00 770.12 231,036.00 800.00 240,000.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 148. 60.00 8,880.00 55.09 8,153.32 55.00 8,140.00 537. CONCRETE SEALER (F) SF 5,100. 1.00 5,100.00 1.24 6,324.00 .50 2,550.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 600. 24.00 14,400.00 42.23 25,338.00 33.00 19,800.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 830. 22.00 18,260.00 28.94 24,020.20 24.00 19,920.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 161. 4.50 724.50 9.94 1,600.34 3.00 483.00 541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 27. 5.00 135.00 24.84 670.68 20.00 540.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 216. 7.50 1,620.00 8.42 1,818.72 10.00 2,160.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 90. 7.50 675.00 5.97 537.30 10.00 900.00 544. REINFORCING STEEL (F) LB 162,152. .86 139,450.72 .90 145,936.80 1.20 194,582.40 544.0 REINFORCING STEEL (F) LB 54,013. .86 46,451.18 .90 48,611.70 1.10 59,414.30 544.1 REINFORCING STEEL (ROADWAY) LB 175. .86 150.50 1.50 262.50 2.50 437.50 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 2,446. 2.75 6,726.50 3.25 7,949.50 2.50 6,115.00 13043 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 104,788. 1.00 104,788.00 1.10 115,266.80 1.12 117,362.56 547. SHEAR CONNECTORS (F) EA 2,230. 3.00 6,690.00 2.50 5,575.00 2.50 5,575.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 1,000.00 10,000.00 2,037.08 20,370.80 2,236.00 22,360.00 550.1 STRUCTURAL STEEL (F) LB 293,500. 1.60 469,600.00 2.02 592,870.00 1.70 498,950.00 550.2 BRIDGE SHOES (F) EA 5. 1,600.00 8,000.00 1,990.00 9,950.00 2,160.00 10,800.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 88. 80.00 7,040.00 81.01 7,128.88 100.00 8,800.00 559.5 SILICONE JOINT SEALANT (F LF 315. 10.00 3,150.00 8.21 2,586.15 5.00 1,575.00 563.23 BRIDGE RAIL T3 (F) LF 733.5 150.00 110,025.00 159.83 117,235.31 155.00 113,692.50 565.23 BRIDGE APPROACH RAIL T3 (F) LF 232.6 165.00 38,379.00 154.43 35,920.42 127.00 29,540.20 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 400.00 2,000.00 700.00 3,500.00 250.00 1,250.00 585.2 STONE FILL, CLASS B CY 440. 30.00 13,200.00 37.80 16,632.00 62.00 27,280.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 1,150. 30.00 34,500.00 39.74 45,701.00 38.00 43,700.00 585.3 STONE FILL, CLASS C CY 160. 30.00 4,800.00 37.80 6,048.00 65.00 10,400.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 2,000. 2.35 4,700.00 3.97 7,940.00 3.25 6,500.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 1,050. 2.35 2,467.50 3.97 4,168.50 3.25 3,412.50 603.00215 15" R.C. PIPE, 2000D LF 190. 65.00 12,350.00 43.20 8,208.00 122.00 23,180.00 603.00218 18" R.C. PIPE, 2000D LF 170. 70.00 11,900.00 58.74 9,985.80 68.00 11,560.00 603.00224 24" R.C. PIPE, 2000D LF 52. 80.00 4,160.00 109.65 5,701.80 106.00 5,512.00 603.34112 12" STEEL END SECTIONS EA 5. 250.00 1,250.00 149.05 745.25 110.00 550.00 603.34115 15" STEEL END SECTIONS EA 1. 275.00 275.00 162.02 162.02 120.00 120.00 603.34124 24" STEEL END SECTIONS EA 3. 300.00 900.00 280.83 842.49 200.00 600.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 100. 28.00 2,800.00 27.00 2,700.00 34.00 3,400.00 603.44024 24" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 25. 50.00 1,250.00 32.40 810.00 74.00 1,850.00 603.60036 RELAYING 36" DRAINAGE PIPE LF 10. 130.00 1,300.00 49.68 496.80 2,000.00 20,000.00 603.60042 RELAYING 42" DRAINAGE PIPE LF 10. 150.00 1,500.00 59.41 594.10 1,800.00 18,000.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 340. 26.00 8,840.00 38.63 13,134.20 27.00 9,180.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,000. 28.00 28,000.00 39.87 39,870.00 29.00 29,000.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 675. 45.00 30,375.00 51.41 34,701.75 35.00 23,625.00 603.85212 12" CORR. POLYETHYLENE END SECTION EA 1. 300.00 300.00 246.32 246.32 420.00 420.00 603.85224 24" CORR. POLYETHYLENE END SECTION EA 3. 400.00 1,200.00 367.01 1,101.03 1,000.00 3,000.00 603.99012 12" TEMPORARY PIPE LF 50. 20.00 1,000.00 36.52 1,826.00 77.00 3,850.00 603.99015 15" TEMPORARY PIPE LF 120. 30.00 3,600.00 38.17 4,580.40 33.00 3,960.00 604.0007 POLYETHYLENE LINER EA 10. 175.00 1,750.00 210.90 2,109.00 200.00 2,000.00 604.12 CATCH BASINS TYPE B U 19. 1,500.00 28,500.00 2,513.71 47,760.49 1,800.00 34,200.00 13043 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 4.2 2,400.00 10,080.00 2,913.56 12,236.95 1,900.00 7,980.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 1.2 3,200.00 3,840.00 3,459.13 4,150.96 2,900.00 3,480.00 604.13 CATCH BASINS TYPE C U 2. 1,800.00 3,600.00 2,647.37 5,294.74 1,800.00 3,600.00 604.242 DROP INLETS TYPE D-B U 2. 1,200.00 2,400.00 1,353.27 2,706.54 1,800.00 3,600.00 604.2429 TEMPORARY DROP INLETS TYPE D-B U 2. 1,200.00 2,400.00 1,827.76 3,655.52 1,800.00 3,600.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 1.3 2,500.00 3,250.00 3,090.89 4,018.16 1,900.00 2,470.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 3,300. 15.00 49,500.00 14.44 47,652.00 30.00 99,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 130. 25.00 3,250.00 18.64 2,423.20 38.00 4,940.00 605.524 24" PERF. CORR. POLYETHYL PIPE UND. LF 240. 35.00 8,400.00 33.70 8,088.00 57.00 13,680.00 605.79 UNDERDRAIN FLUSHING BASINS EA 6. 500.00 3,000.00 367.67 2,206.02 945.00 5,670.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 1,900. 20.00 38,000.00 19.99 37,981.00 19.00 36,100.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 10. 2,250.00 22,500.00 2,268.22 22,682.20 2,400.00 24,000.00 606.14549 TEMPORARY BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT) EA 4. 2,300.00 9,200.00 2,268.22 9,072.88 2,400.00 9,600.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,750. 20.00 35,000.00 24.84 43,470.00 22.00 38,500.00 606.93 TEMPORARY BEAM GUARDRAIL LF 625. 11.00 6,875.00 10.80 6,750.00 11.00 6,875.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 8. 8,000.00 64,000.00 2,527.45 20,219.60 5,000.00 40,000.00 607.9 RESETTING RAILING AND FENCING LF 215. 12.00 2,580.00 19.99 4,297.85 11.00 2,365.00 609.01 STRAIGHT GRANITE CURB LF 340. 20.00 6,800.00 18.36 6,242.40 23.00 7,820.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 190. 18.00 3,420.00 14.04 2,667.60 18.00 3,420.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 48. 25.00 1,200.00 15.12 725.76 24.00 1,152.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 260. 7.50 1,950.00 10.80 2,808.00 11.00 2,860.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 100. 70.00 7,000.00 70.21 7,021.00 161.00 16,100.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 150. 70.00 10,500.00 51.85 7,777.50 200.00 30,000.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 5,000. 70.00 350,000.00 58.57 292,850.00 65.00 325,000.00 611.35216 16" CASING PIPE WITH 8" DIA. CL. 52 D.I.M.J. LF 200. 425.00 85,000.00 207.77 41,554.00 200.00 40,000.00 611.35220 20" CASING PIPE WITH 12" DIA. CL. 52 D.I.M.J. LF 50. 550.00 27,500.00 257.77 12,888.50 360.00 18,000.00 13043 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 611.5011 1" COPPER WATER PIPE LF 200. 30.00 6,000.00 56.37 11,274.00 42.00 8,400.00 611.5101 1" CORPORATION STOP EA 7. 450.00 3,150.00 108.01 756.07 230.00 1,610.00 611.5201 1" CURB STOP EA 7. 470.00 3,290.00 99.37 695.59 200.00 1,400.00 611.71006 6" GATE VALVE EA 7. 575.00 4,025.00 707.47 4,952.29 700.00 4,900.00 611.71008 8" GATE VALVE EA 10. 800.00 8,000.00 972.10 9,721.00 650.00 6,500.00 611.71012 12" GATE VALVE EA 7. 1,650.00 11,550.00 1,803.78 12,626.46 1,500.00 10,500.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 2,000.00 2,000.00 993.70 993.70 7,200.00 7,200.00 611.815 INSTALL HYDRANTS EA 7. 1,100.00 7,700.00 1,242.12 8,694.84 3,200.00 22,400.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 2. 50.00 100.00 172.82 345.64 65.00 130.00 611.951 WATER MAIN INSULATION SY 20. 30.00 600.00 20.09 401.80 9.00 180.00 611.96 RIVER CROSSING U 1. 225,000.00 225,000.00 131,664.88 131,664.88 35,000.00 35,000.00 611.97 RAILROAD CROSSING U 1. 75,000.00 75,000.00 64,694.04 64,694.04 110,000.00 110,000.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 612. 10.00 6,120.00 18.90 11,566.80 12.00 7,344.00 615.02 TRAFFIC SIGN TYPE B (F) SF 22. 105.00 2,310.00 73.45 1,615.90 100.00 2,200.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 25. 120.00 3,000.00 118.81 2,970.25 110.00 2,750.00 615.03 TRAFFIC SIGN TYPE C (F) SF 177.75 75.00 13,331.25 41.04 7,294.86 68.00 12,087.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 325.00 325.00 151.21 151.21 300.00 300.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8. 16.00 128.00 21.60 172.80 15.00 120.00 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 2. 27.00 54.00 64.81 129.62 50.00 100.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 618.7 FLAGGERS HR 12,000. 20.00 240,000.00 19.87 238,440.00 15.00 180,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 100,000.00 100,000.00 79,495.78 79,495.78 25,000.00 25,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 12,000.00 24,000.00 14,905.46 29,810.92 15,000.00 30,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 35. 60.00 2,100.00 7.56 264.60 10.00 350.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 50. 4.50 225.00 27.00 1,350.00 5.00 250.00 621.31 SINGLE DELINEATOR WITH POST EA 190. 30.00 5,700.00 29.16 5,540.40 30.00 5,700.00 622.1 STEEL WITNESS MARKERS EA 50. 26.00 1,300.00 27.00 1,350.00 27.00 1,350.00 622.2 CONCRETE BOUNDS EA 9. 270.00 2,430.00 270.03 2,430.27 250.00 2,250.00 624. RAILROAD PROTECTION U 1. 85,000.00 85,000.00 9,936.97 9,936.97 25,000.00 25,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 600. 2.00 1,200.00 3.97 2,382.00 3.00 1,800.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 111,100. .12 13,332.00 .12 13,332.00 .11 12,221.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 150. 1.10 165.00 1.08 162.00 1.00 150.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 60. 5.50 330.00 5.40 324.00 5.00 300.00 641. LOAM CY 270. 30.00 8,100.00 25.06 6,766.20 35.00 9,450.00 645.2 MATTING FOR EROSION CONTROL SY 3,000. 1.65 4,950.00 2.27 6,810.00 1.65 4,950.00 13043 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 7,200. 2.00 14,400.00 2.49 17,928.00 2.00 14,400.00 645.3 EROSION STONE TON 300. 30.00 9,000.00 25.06 7,518.00 47.00 14,100.00 645.531 SILT FENCE LF 3,300. 3.50 11,550.00 3.97 13,101.00 3.50 11,550.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 6,500.00 6,500.00 2,700.26 2,700.26 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 275. 100.00 27,500.00 97.21 26,732.75 35.00 9,625.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 8.3 1,600.00 13,280.00 1,836.18 15,240.29 1,500.00 12,450.00 647.1 HUMUS CY 3,600. 15.00 54,000.00 22.90 82,440.00 12.00 43,200.00 650.2 LANDSCAPING U 1. 120,000.00 120,000.00 96,129.41 96,129.41 114,000.00 114,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 365,000.00 365,000.00 313,230.65 313,230.65 500,000.00 500,000.00 670.0452 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 130,000.00 130,000.00 118,622.81 118,622.81 250,000.00 250,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 300.00 300.00 189.02 189.02 250.00 250.00 670.101 TEMPORARY LIGHTING U 1. 9,000.00 9,000.00 9,936.97 9,936.97 5,000.00 5,000.00 692. MOBILIZATION U 1. 520,000.00 520,000.00 500,000.00 500,000.00 970,000.00 970,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.12 FIELD OFFICE TYPE B MON 27. 1,000.00 27,000.00 1,593.16 43,015.32 800.00 21,600.00 698.2 PHYSICAL TESTING LABORATORY MON 22. 650.00 14,300.00 945.09 20,791.98 250.00 5,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1002.11 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.32 ALTERATIONS AND ADDITIONS AS NEEDED - WELL EXTENSION $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAIN- TENANCE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1009.4 BUILDING ASBESTOS ABATEMENT $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1010.15 FUEL ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 6,400.00 6,400.00 6,400.00 6,400.00 6,400.00 6,400.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.411 QUALITY CONTROL QUALITY ASSURANCE (QC/QA) FOR CONCRETE $ 1. 400.00 400.00 400.00 400.00 400.00 400.00 $10,583,772.65 $10,686,931.84 $10,732,576.47 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BARTLETT BRF-MGS-X-032-1(23), 13043 COUNTIES AND CODES: CARROLL 003 DATE BIDS OPEN: OCTOBER 4, 2006 SCOPE OF WORK: ROADWAY AND BRIDGE REHABILITATION LOCATION: US ROUTE 302 AND WEST SIDE ROAD COMPLETION DATE: OCTOBER 17, 2008 A R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $10,583,772.65 B ALVIN J. COLEMAN & SON INC. 9 NH RTE. 113, CONWAY, NH 03818 $10,686,931.84 C CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $10,712,126.47 D R.S. AUDLEY, INC 609 RT 3A, BOW, NH 03304 $10,777,918.10 E SARGENT CORPORATION 378 BENNOCH RD., STILLWATER, ME 04489 $11,752,522.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 5.12 15,500.00 79,360.00 5,500.00 28,160.00 201.21 REMOVING SMALL TREES EA 19. 350.00 6,650.00 250.00 4,750.00 201.22 REMOVING LARGE TREES EA 1. 500.00 500.00 500.00 500.00 201.4 REMOVING STUMPS EA 1. 250.00 250.00 300.00 300.00 202.101 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 2,500.00 2,500.00 7,500.00 7,500.00 202.31 FILL ABANDONED PIPE CY 3. 200.00 600.00 120.00 360.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 545. 12.50 6,812.50 9.00 4,905.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 42. 16.00 672.00 15.00 630.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,439. 2.50 6,097.50 3.50 8,536.50 203.1 COMMON EXCAVATION CY 14,550. 9.80 142,590.00 5.00 72,750.00 203.2 ROCK EXCAVATION CY 230. 45.00 10,350.00 18.00 4,140.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 14. 1,100.00 15,400.00 2,200.00 30,800.00 203.6 EMBANKMENT-IN-PLACE (F) CY 45,740. 9.00 411,660.00 8.50 388,790.00 206.1 COMMON STRUCTURE EXCAVATION CY 725. 12.50 9,062.50 20.00 14,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 200. 30.00 6,000.00 34.00 6,800.00 206.2 ROCK STRUCTURE EXCAVATION CY 870. 60.00 52,200.00 75.00 65,250.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 1,475. 19.00 28,025.00 36.00 53,100.00 209.1 GRANULAR BACKFILL CY 200. 31.50 6,300.00 28.00 5,600.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 5,700. 44.00 250,800.00 28.00 159,600.00 13043 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.202 GRANULAR BACKFILL (BRIDGE) (F) CY 1,900. 44.00 83,600.00 28.00 53,200.00 209.3 GRANULAR BACKFILL (SAND) CY 250. 31.50 7,875.00 26.00 6,500.00 211.11 VIBRATION MONITORING SERVICES HR 600. 50.00 30,000.00 75.00 45,000.00 214. FINE GRADING U 1. 120,000.00 120,000.00 40,000.00 40,000.00 304.1 SAND (F) CY 4,580. 22.00 100,760.00 21.00 96,180.00 304.2 GRAVEL (F) CY 5,513. 25.00 137,825.00 23.00 126,799.00 304.3 CRUSHED GRAVEL (F) CY 5,991. 30.00 179,730.00 28.00 167,748.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 950. 31.00 29,450.00 32.00 30,400.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 70. 31.00 2,170.00 32.00 2,240.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 860. 31.00 26,660.00 32.00 27,520.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 4,900. 65.00 318,500.00 66.00 323,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 540. 115.00 62,100.00 126.00 68,040.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 46. 150.00 6,900.00 250.00 11,500.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 95. 90.00 8,550.00 76.00 7,220.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,750. 70.00 122,500.00 80.00 140,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,150. 7.20 22,680.00 8.00 25,200.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 97,000.00 97,000.00 45,000.00 45,000.00 501.101 TEMPORARY BRIDGE U 1. 640,000.00 640,000.00 750,000.00 750,000.00 501.102 TEMPORARY BRIDGE U 1. 275,000.00 275,000.00 380,000.00 380,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 92,000.00 92,000.00 100,000.00 100,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 23,000.00 23,000.00 170,000.00 170,000.00 502.103 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 54,000.00 54,000.00 502.104 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 70,000.00 70,000.00 122,000.00 122,000.00 503.201 COFFERDAMS U 1. 225,000.00 225,000.00 162,000.00 162,000.00 503.202 COFFERDAMS U 1. 2,500.00 2,500.00 1.00 1.00 503.203 COFFERDAMS U 1. 170,000.00 170,000.00 152,000.00 152,000.00 503.204 COFFERDAMS U 1. 60,000.00 60,000.00 275,000.00 275,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 145,000.00 145,000.00 140,000.00 140,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5,800. 16.00 92,800.00 8.00 46,400.00 504.11 COMMON BRIDGE EXCAVATION (F) CY 1,900. 15.00 28,500.00 12.00 22,800.00 13043 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 504.2 ROCK BRIDGE EXCAVATION CY 100. 118.00 11,800.00 75.00 7,500.00 508. STRUCTURAL FILL CY 330. 45.00 14,850.00 34.00 11,220.00 520.0001 PRECAST CONCRETE BOX CULVERT U 1. 28,000.00 28,000.00 33,000.00 33,000.00 520.0002 PRECAST CONCRETE BOX CULVERT U 1. 27,000.00 27,000.00 42,000.00 42,000.00 520.0003 PRECAST CONCRETE BOX CULVERT U 1. 53,000.00 53,000.00 74,000.00 74,000.00 520.0031 PRECAST CONCRETE ARCH FRAME U 1. 240,000.00 240,000.00 302,000.00 302,000.00 520.01 CONCRETE CLASS AA CY 40. 1,200.00 48,000.00 600.00 24,000.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) CY 9. 1,250.00 11,250.00 600.00 5,400.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 110. 400.00 44,000.00 355.00 39,050.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 1,393.4 470.00 654,898.00 500.00 696,700.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 352. 480.00 168,960.00 500.00 176,000.00 520.21 CONCRETE CLASS B, FOOTINGS (F) CY 468. 162.00 75,816.00 300.00 140,400.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 857. 270.00 231,390.00 300.00 257,100.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL CY 270. 150.00 40,500.00 250.00 67,500.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 300. 850.00 255,000.00 625.00 187,500.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 148. 50.00 7,400.00 65.00 9,620.00 537. CONCRETE SEALER (F) SF 5,100. .50 2,550.00 1.00 5,100.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 600. 30.00 18,000.00 32.00 19,200.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 830. 27.00 22,410.00 25.00 20,750.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 161. 6.00 966.00 4.00 644.00 541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 27. 7.00 189.00 8.00 216.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 216. 8.00 1,728.00 10.00 2,160.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 90. 7.00 630.00 9.00 810.00 544. REINFORCING STEEL (F) LB 162,152. 1.10 178,367.20 1.00 162,152.00 544.0 REINFORCING STEEL (F) LB 54,013. 1.05 56,713.65 1.00 54,013.00 544.1 REINFORCING STEEL (ROADWAY) LB 175. 4.00 700.00 4.00 700.00 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 2,446. 3.50 8,561.00 2.00 4,892.00 13043 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 104,788. 1.00 104,788.00 1.10 115,266.80 547. SHEAR CONNECTORS (F) EA 2,230. 2.50 5,575.00 3.00 6,690.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 2,700.00 27,000.00 2,200.00 22,000.00 550.1 STRUCTURAL STEEL (F) LB 293,500. 1.40 410,900.00 2.30 675,050.00 550.2 BRIDGE SHOES (F) EA 5. 2,200.00 11,000.00 950.00 4,750.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 88. 95.00 8,360.00 100.00 8,800.00 559.5 SILICONE JOINT SEALANT (F LF 315. 10.00 3,150.00 8.00 2,520.00 563.23 BRIDGE RAIL T3 (F) LF 733.5 130.00 95,355.00 150.00 110,025.00 565.23 BRIDGE APPROACH RAIL T3 (F) LF 232.6 115.00 26,749.00 150.00 34,890.00 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 450.00 2,250.00 850.00 4,250.00 585.2 STONE FILL, CLASS B CY 440. 38.00 16,720.00 59.00 25,960.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 1,150. 43.00 49,450.00 59.00 67,850.00 585.3 STONE FILL, CLASS C CY 160. 46.00 7,360.00 58.00 9,280.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 2,000. 4.50 9,000.00 2.00 4,000.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 1,050. 4.50 4,725.00 2.00 2,100.00 603.00215 15" R.C. PIPE, 2000D LF 190. 50.00 9,500.00 66.00 12,540.00 603.00218 18" R.C. PIPE, 2000D LF 170. 55.00 9,350.00 72.00 12,240.00 603.00224 24" R.C. PIPE, 2000D LF 52. 65.00 3,380.00 74.00 3,848.00 603.34112 12" STEEL END SECTIONS EA 5. 190.00 950.00 220.00 1,100.00 603.34115 15" STEEL END SECTIONS EA 1. 210.00 210.00 300.00 300.00 603.34124 24" STEEL END SECTIONS EA 3. 270.00 810.00 400.00 1,200.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 100. 35.00 3,500.00 38.00 3,800.00 603.44024 24" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 25. 55.00 1,375.00 58.00 1,450.00 603.60036 RELAYING 36" DRAINAGE PIPE LF 10. 140.00 1,400.00 70.00 700.00 603.60042 RELAYING 42" DRAINAGE PIPE LF 10. 165.00 1,650.00 98.00 980.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 340. 30.00 10,200.00 39.00 13,260.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,000. 35.00 35,000.00 44.00 44,000.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 675. 50.00 33,750.00 58.00 39,150.00 603.85212 12" CORR. POLYETHYLENE END SECTION EA 1. 250.00 250.00 300.00 300.00 603.85224 24" CORR. POLYETHYLENE END SECTION EA 3. 325.00 975.00 500.00 1,500.00 603.99012 12" TEMPORARY PIPE LF 50. 75.00 3,750.00 45.00 2,250.00 603.99015 15" TEMPORARY PIPE LF 120. 80.00 9,600.00 49.00 5,880.00 604.0007 POLYETHYLENE LINER EA 10. 225.00 2,250.00 200.00 2,000.00 604.12 CATCH BASINS TYPE B U 19. 2,150.00 40,850.00 2,400.00 45,600.00 13043 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 4.2 3,000.00 12,600.00 3,700.00 15,540.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 1.2 4,000.00 4,800.00 4,500.00 5,400.00 604.13 CATCH BASINS TYPE C U 2. 1,800.00 3,600.00 2,400.00 4,800.00 604.242 DROP INLETS TYPE D-B U 2. 1,300.00 2,600.00 1,800.00 3,600.00 604.2429 TEMPORARY DROP INLETS TYPE D-B U 2. 1,300.00 2,600.00 1,800.00 3,600.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 1.3 2,900.00 3,770.00 3,600.00 4,680.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 3,300. 20.00 66,000.00 32.00 105,600.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 130. 26.00 3,380.00 37.00 4,810.00 605.524 24" PERF. CORR. POLYETHYL PIPE UND. LF 240. 38.00 9,120.00 50.00 12,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 6. 525.00 3,150.00 380.00 2,280.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 1,900. 18.00 34,200.00 20.00 38,000.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 10. 2,200.00 22,000.00 2,450.00 24,500.00 606.14549 TEMPORARY BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT) EA 4. 2,200.00 8,800.00 2,400.00 9,600.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,750. 19.00 33,250.00 35.00 61,250.00 606.93 TEMPORARY BEAM GUARDRAIL LF 625. 10.00 6,250.00 11.00 6,875.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 8. 3,000.00 24,000.00 1,900.00 15,200.00 607.9 RESETTING RAILING AND FENCING LF 215. 10.50 2,257.50 12.00 2,580.00 609.01 STRAIGHT GRANITE CURB LF 340. 18.00 6,120.00 28.00 9,520.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 190. 14.00 2,660.00 20.00 3,800.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 48. 14.00 672.00 30.00 1,440.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 260. 7.00 1,820.00 10.00 2,600.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 100. 50.00 5,000.00 47.00 4,700.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 150. 55.00 8,250.00 48.00 7,200.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 5,000. 60.00 300,000.00 52.00 260,000.00 611.35216 16" CASING PIPE WITH 8" DIA. CL. 52 D.I.M.J. LF 200. 175.00 35,000.00 188.00 37,600.00 611.35220 20" CASING PIPE WITH 12" DIA. CL. 52 D.I.M.J. LF 50. 240.00 12,000.00 214.00 10,700.00 13043 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 611.5011 1" COPPER WATER PIPE LF 200. 28.00 5,600.00 42.00 8,400.00 611.5101 1" CORPORATION STOP EA 7. 325.00 2,275.00 150.00 1,050.00 611.5201 1" CURB STOP EA 7. 290.00 2,030.00 250.00 1,750.00 611.71006 6" GATE VALVE EA 7. 900.00 6,300.00 1,100.00 7,700.00 611.71008 8" GATE VALVE EA 10. 1,150.00 11,500.00 1,400.00 14,000.00 611.71012 12" GATE VALVE EA 7. 2,100.00 14,700.00 2,200.00 15,400.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 1,250.00 1,250.00 1,800.00 1,800.00 611.815 INSTALL HYDRANTS EA 7. 1,550.00 10,850.00 1,250.00 8,750.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 2. 175.00 350.00 200.00 400.00 611.951 WATER MAIN INSULATION SY 20. 25.00 500.00 12.00 240.00 611.96 RIVER CROSSING U 1. 25,000.00 25,000.00 42,000.00 42,000.00 611.97 RAILROAD CROSSING U 1. 168,000.00 168,000.00 45,000.00 45,000.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 612. 15.00 9,180.00 10.00 6,120.00 615.02 TRAFFIC SIGN TYPE B (F) SF 22. 70.00 1,540.00 115.00 2,530.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 25. 115.00 2,875.00 160.00 4,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 177.75 35.00 6,221.25 48.00 8,532.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 200.00 200.00 775.00 775.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8. 20.00 160.00 26.00 208.00 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 2. 100.00 200.00 150.00 300.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 618.7 FLAGGERS HR 12,000. 15.00 180,000.00 15.00 180,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 145,000.00 145,000.00 130,000.00 130,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 18,000.00 36,000.00 18,000.00 36,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 35. 10.00 350.00 31.00 1,085.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 50. 4.00 200.00 6.00 300.00 621.31 SINGLE DELINEATOR WITH POST EA 190. 25.00 4,750.00 30.00 5,700.00 622.1 STEEL WITNESS MARKERS EA 50. 25.00 1,250.00 31.00 1,550.00 622.2 CONCRETE BOUNDS EA 9. 250.00 2,250.00 300.00 2,700.00 624. RAILROAD PROTECTION U 1. 52,000.00 52,000.00 90,000.00 90,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 600. 2.00 1,200.00 3.00 1,800.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 111,100. .12 13,332.00 .15 16,665.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 150. 3.00 450.00 1.50 225.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 60. 10.00 600.00 2.25 135.00 641. LOAM CY 270. 23.00 6,210.00 22.00 5,940.00 645.2 MATTING FOR EROSION CONTROL SY 3,000. 1.60 4,800.00 2.25 6,750.00 13043 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 7,200. 1.90 13,680.00 3.25 23,400.00 645.3 EROSION STONE TON 300. 40.00 12,000.00 72.00 21,600.00 645.531 SILT FENCE LF 3,300. 2.50 8,250.00 2.25 7,425.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 275. 75.00 20,625.00 95.00 26,125.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 8.3 1,500.00 12,450.00 1,800.00 14,940.00 647.1 HUMUS CY 3,600. 19.00 68,400.00 11.00 39,600.00 650.2 LANDSCAPING U 1. 90,000.00 90,000.00 98,000.00 98,000.00 670.0451 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 375,000.00 375,000.00 412,000.00 412,000.00 670.0452 CONSTRUCT AND REMOVE TEMPORARY DETOUR U 1. 135,000.00 135,000.00 215,000.00 215,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 250.00 250.00 175.00 175.00 670.101 TEMPORARY LIGHTING U 1. 2,500.00 2,500.00 15,000.00 15,000.00 692. MOBILIZATION U 1. 950,000.00 950,000.00 1,174,300.70 1,174,300.70 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 698.12 FIELD OFFICE TYPE B MON 27. 1,800.00 48,600.00 1,600.00 43,200.00 698.2 PHYSICAL TESTING LABORATORY MON 22. 1,000.00 22,000.00 1,200.00 26,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1002.11 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1008.32 ALTERATIONS AND ADDITIONS AS NEEDED - WELL EXTENSION $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAIN- TENANCE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1009.4 BUILDING ASBESTOS ABATEMENT $ 1. 1,500.00 1,500.00 1,500.00 1,500.00 1010.15 FUEL ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 6,400.00 6,400.00 6,400.00 6,400.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.411 QUALITY CONTROL QUALITY ASSURANCE (QC/QA) FOR CONCRETE $ 1. 400.00 400.00 400.00 400.00 $10,777,918.10 $11,752,522.00