THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: MEREDITH F-X-0291(011), 11386 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: SEPTEMBER 14, 2006 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: US ROUTE 3 IN MEREDITH COMPLETION DATE: MAY 23, 2008 A R. D. EDMUNDS & SONS, INC. 221 FRANKLIN STREET, FRANKLIN, NH 03235 $ 2,194,775.00 B VIRGIN CONSTRUCTION CORP. 346 LAKESHORE DRIVE, WEST FRANKLIN, NH 03235 $ 2,254,000.00 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,349,904.80 D BUSBY CONSTRUCTION CO., INC. 9 POND LANE, ATKINSON, NH 03811 $ 2,388,388.00 E JAMES S. PISCOPO G.C. INC. PO BOX 130, WINNISQUAM, NH 03289 $ 2,557,477.75 F WEAVER BROS., CONST. CO. INC. PO BOX 1326, CONCORD, NH 03302 $ 2,574,392.60 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.21 REMOVING SMALL TREES EA 43. 250.00 10,750.00 300.00 12,900.00 400.00 17,200.00 201.22 REMOVING LARGE TREES EA 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,100.00 1,100.00 201.4 REMOVING STUMPS EA 3. 500.00 1,500.00 280.00 840.00 300.00 900.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 120. 15.00 1,800.00 19.50 2,340.00 12.00 1,440.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 4. 400.00 1,600.00 235.00 940.00 400.00 1,600.00 203.1 COMMON EXCAVATION CY 16,700. 7.50 125,250.00 7.00 116,900.00 6.00 100,200.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 2. 1,200.00 2,400.00 1,850.00 3,700.00 1,800.00 3,600.00 203.6 EMBANKMENT-IN-PLACE (F) CY 3,929. 7.00 27,503.00 4.00 15,716.00 3.00 11,787.00 206.1 COMMON STRUCTURE EXCAVATION CY 130. 20.00 2,600.00 32.00 4,160.00 12.00 1,560.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 30. 40.00 1,200.00 50.00 1,500.00 50.00 1,500.00 206.2 ROCK STRUCTURE EXCAVATION CY 16. 100.00 1,600.00 185.00 2,960.00 100.00 1,600.00 209.4 GRANULAR BACKFILL (GRAV) CY 70. 35.00 2,450.00 28.00 1,960.00 30.00 2,100.00 211.11 VIBRATION MONITORING SERVICES HR 170. 100.00 17,000.00 70.00 11,900.00 70.00 11,900.00 214. FINE GRADING U 1. 50,000.00 50,000.00 123,000.00 123,000.00 40,000.00 40,000.00 304.1 SAND (F) CY 696. 20.00 13,920.00 15.00 10,440.00 17.00 11,832.00 304.2 GRAVEL (F) CY 4,659. 20.00 93,180.00 23.00 107,157.00 19.00 88,521.00 304.3 CRUSHED GRAVEL (F) CY 5,314. 22.00 116,908.00 25.50 135,507.00 23.00 122,222.00 11386 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.31 CRUSHED GRAVEL FOR SHIMMING CY 155. 30.00 4,650.00 39.00 6,045.00 30.00 4,650.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 600. 30.00 18,000.00 24.00 14,400.00 30.00 18,000.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 5,100. 65.00 331,500.00 63.00 321,300.00 66.00 336,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 800. 120.00 96,000.00 110.00 88,000.00 100.00 80,000.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 261. 90.00 23,490.00 85.00 22,185.00 100.00 26,100.00 417. COLD PLANING BITUMINOUS SURFACES SY 2,445. 10.00 24,450.00 8.00 19,560.00 8.00 19,560.00 570.4 MORTAR RUBBLE MASONRY (F) CY 2.93 600.00 1,758.00 500.00 1,465.00 400.00 1,172.00 585.2 STONE FILL, CLASS B CY 43. 55.00 2,365.00 40.00 1,720.00 40.00 1,720.00 585.3 STONE FILL, CLASS C CY 60. 50.00 3,000.00 32.50 1,950.00 40.00 2,400.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 310. 5.00 1,550.00 4.00 1,240.00 2.50 775.00 603.00215 15" R.C. PIPE, 2000D LF 560. 45.00 25,200.00 47.00 26,320.00 50.00 28,000.00 603.00218 18" R.C. PIPE, 2000D LF 180. 55.00 9,900.00 49.50 8,910.00 65.00 11,700.00 603.00224 24" R.C. PIPE, 2000D LF 400. 65.00 26,000.00 79.00 31,600.00 100.00 40,000.00 603.30115 15" R.C. END SECTIONS EA 1. 700.00 700.00 620.00 620.00 500.00 500.00 603.30124 24" R.C. END SECTIONS EA 1. 900.00 900.00 760.00 760.00 700.00 700.00 603.34112 12" STEEL END SECTIONS EA 9. 200.00 1,800.00 84.00 756.00 300.00 2,700.00 603.34115 15" STEEL END SECTIONS EA 2. 400.00 800.00 120.00 240.00 350.00 700.00 603.34124 24" STEEL END SECTIONS EA 2. 500.00 1,000.00 200.00 400.00 450.00 900.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 280. 40.00 11,200.00 37.00 10,360.00 28.00 7,840.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 220. 45.00 9,900.00 39.00 8,580.00 33.00 7,260.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 430. 50.00 21,500.00 36.50 15,695.00 42.00 18,060.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 90. 60.00 5,400.00 56.00 5,040.00 54.00 4,860.00 604.0007 POLYETHYLENE LINER EA 9. 200.00 1,800.00 160.00 1,440.00 180.00 1,620.00 604.12 CATCH BASINS TYPE B U 21. 1,500.00 31,500.00 2,000.00 42,000.00 1,800.00 37,800.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 2. 2,000.00 4,000.00 2,200.00 4,400.00 3,000.00 6,000.00 604.32 DRAINAGE MANHOLES U 1. 2,000.00 2,000.00 1,650.00 1,650.00 2,650.00 2,650.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 33. 250.00 8,250.00 250.00 8,250.00 400.00 13,200.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 3. 350.00 1,050.00 250.00 750.00 560.00 1,680.00 604.6 MANHOLE COVERS & FRAMES EA 1. 500.00 500.00 525.00 525.00 500.00 500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 2,200. 12.00 26,400.00 17.50 38,500.00 20.00 44,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 265. 20.00 5,300.00 36.00 9,540.00 30.00 7,950.00 605.79 UNDERDRAIN FLUSHING BASINS EA 5. 600.00 3,000.00 300.00 1,500.00 350.00 1,750.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 537.5 20.00 10,750.00 17.00 9,137.50 18.00 9,675.00 11386 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 2,500.00 5,000.00 2,100.00 4,200.00 2,200.00 4,400.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 4. 600.00 2,400.00 500.00 2,000.00 525.00 2,100.00 608.24 4" CONCRETE SIDEWALK (F) SY 569. 50.00 28,450.00 50.00 28,450.00 90.00 51,210.00 608.4615 6" GRANITE COBBLES SY 470. 175.00 82,250.00 89.00 41,830.00 160.00 75,200.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 20. 400.00 8,000.00 260.00 5,200.00 500.00 10,000.00 609.01 STRAIGHT GRANITE CURB LF 2,550. 17.00 43,350.00 17.50 44,625.00 20.00 51,000.00 609.02 CURVED GRANITE CURB LF 185. 30.00 5,550.00 27.00 4,995.00 32.00 5,920.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 250. 15.00 3,750.00 15.50 3,875.00 16.50 4,125.00 609.5 RESET GRANITE CURB LF 150. 15.00 2,250.00 7.00 1,050.00 10.00 1,500.00 612.04 SEWER MANHOLES VF 8. 250.00 2,000.00 500.00 4,000.00 550.00 4,400.00 612.3508 8" PVC SEWER PIPE, SDR 35 LF 75. 60.00 4,500.00 74.00 5,550.00 60.00 4,500.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 400.00 1,600.00 300.00 1,200.00 325.00 1,300.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 345. 10.00 3,450.00 7.00 2,415.00 7.50 2,587.50 615.02 TRAFFIC SIGN TYPE B (F) SF 124. 70.00 8,680.00 60.00 7,440.00 63.00 7,812.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 94. 110.00 10,340.00 75.00 7,050.00 80.00 7,520.00 615.03 TRAFFIC SIGN TYPE C (F) SF 292. 40.00 11,680.00 36.00 10,512.00 47.00 13,724.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 250.00 250.00 200.00 200.00 210.00 210.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 69. 25.00 1,725.00 15.00 1,035.00 21.00 1,449.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 618.7 FLAGGERS HR 4,800. 17.00 81,600.00 20.00 96,000.00 20.00 96,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 80,000.00 80,000.00 109,356.75 109,356.75 150,000.00 150,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 15,000.00 45,000.00 10,000.00 30,000.00 10,000.00 30,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 40. 350.00 14,000.00 425.00 17,000.00 600.00 24,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 11. 10.00 110.00 4.00 44.00 4.25 46.75 621.31 SINGLE DELINEATOR WITH POST EA 75. 30.00 2,250.00 28.00 2,100.00 30.00 2,250.00 622.1 STEEL WITNESS MARKERS EA 26. 30.00 780.00 20.00 520.00 22.00 572.00 622.2 CONCRETE BOUNDS EA 21. 275.00 5,775.00 250.00 5,250.00 260.00 5,460.00 622.5 RESETTING BOUNDS EA 1. 250.00 250.00 200.00 200.00 225.00 225.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 2. 1,000.00 2,000.00 600.00 1,200.00 625.00 1,250.00 628.2 SAWED BITUMINOUS PAVEMENT LF 4,550. 2.00 9,100.00 2.50 11,375.00 2.00 9,100.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 116,400. .18 20,952.00 .14 16,296.00 .16 18,624.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 555. .80 444.00 .35 194.25 .21 116.55 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 1,450. .80 1,160.00 .55 797.50 .23 333.50 11386 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 210. 4.00 840.00 1.35 283.50 1.10 231.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 420. 4.00 1,680.00 1.65 693.00 2.10 882.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 280. 4.00 1,120.00 .95 266.00 1.05 294.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 710. 4.00 2,840.00 1.25 887.50 1.30 923.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 80. 10.00 800.00 2.95 236.00 2.10 168.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 210. 10.00 2,100.00 3.75 787.50 7.50 1,575.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 15,250. .50 7,625.00 .35 5,337.50 .37 5,642.50 641. LOAM CY 2,100. 20.00 42,000.00 23.50 49,350.00 24.00 50,400.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 1.6 800.00 1,280.00 600.00 960.00 700.00 1,120.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 8,950. 1.60 14,320.00 1.40 12,530.00 1.50 13,425.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 3,900. 2.00 7,800.00 1.90 7,410.00 1.80 7,020.00 645.3 EROSION STONE TON 220. 30.00 6,600.00 31.00 6,820.00 25.00 5,500.00 645.531 SILT FENCE LF 2,200. 3.00 6,600.00 4.50 9,900.00 3.60 7,920.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 10,000.00 10,000.00 2,500.00 2,500.00 6,500.00 6,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 150. 125.00 18,750.00 70.00 10,500.00 75.00 11,250.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3.7 1,500.00 5,550.00 1,400.00 5,180.00 1,450.00 5,365.00 650.2 LANDSCAPING U 1. 90,000.00 90,000.00 83,000.00 83,000.00 84,000.00 84,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 17. 250.00 4,250.00 200.00 3,400.00 210.00 3,570.00 692. MOBILIZATION U 1. 110,000.00 110,000.00 154,000.00 154,000.00 225,000.00 225,000.00 698.13 FIELD OFFICE TYPE C MON 17. 2,000.00 34,000.00 1,500.00 25,500.00 1,200.00 20,400.00 698.2 PHYSICAL TESTING LABORATORY MON 8. 1,000.00 8,000.00 880.00 7,040.00 1,000.00 8,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 11386 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 6,700.00 6,700.00 6,700.00 6,700.00 6,700.00 6,700.00 $2,194,775.00 $2,254,000.00 $2,349,904.80 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: MEREDITH F-X-0291(011), 11386 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: SEPTEMBER 14, 2006 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: US ROUTE 3 IN MEREDITH COMPLETION DATE: MAY 23, 2008 A R. D. EDMUNDS & SONS, INC. 221 FRANKLIN STREET, FRANKLIN, NH 03235 $ 2,194,775.00 B VIRGIN CONSTRUCTION CORP. 346 LAKESHORE DRIVE, WEST FRANKLIN, NH 03235 $ 2,254,000.00 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,349,904.80 D BUSBY CONSTRUCTION CO., INC. 9 POND LANE, ATKINSON, NH 03811 $ 2,388,388.00 E JAMES S. PISCOPO G.C. INC. PO BOX 130, WINNISQUAM, NH 03289 $ 2,557,477.75 F WEAVER BROS., CONST. CO. INC. PO BOX 1326, CONCORD, NH 03302 $ 2,574,392.60 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.21 REMOVING SMALL TREES EA 43. 250.00 10,750.00 190.00 8,170.00 150.00 6,450.00 201.22 REMOVING LARGE TREES EA 1. 1,000.00 1,000.00 325.00 325.00 1,000.00 1,000.00 201.4 REMOVING STUMPS EA 3. 500.00 1,500.00 165.00 495.00 200.00 600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 120. 20.00 2,400.00 12.00 1,440.00 14.00 1,680.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 4. 500.00 2,000.00 200.00 800.00 350.00 1,400.00 203.1 COMMON EXCAVATION CY 16,700. 15.55 259,685.00 7.50 125,250.00 8.50 141,950.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 2. 2,250.00 4,500.00 1,250.00 2,500.00 1,000.00 2,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 3,929. 6.50 25,538.50 5.00 19,645.00 9.00 35,361.00 206.1 COMMON STRUCTURE EXCAVATION CY 130. 40.00 5,200.00 26.00 3,380.00 10.00 1,300.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 30. 50.00 1,500.00 48.00 1,440.00 21.00 630.00 206.2 ROCK STRUCTURE EXCAVATION CY 16. 150.00 2,400.00 75.00 1,200.00 90.00 1,440.00 209.4 GRANULAR BACKFILL (GRAV) CY 70. 75.00 5,250.00 150.00 10,500.00 28.00 1,960.00 211.11 VIBRATION MONITORING SERVICES HR 170. 65.00 11,050.00 75.00 12,750.00 75.00 12,750.00 214. FINE GRADING U 1. 38,000.00 38,000.00 72,000.00 72,000.00 80,000.00 80,000.00 304.1 SAND (F) CY 696. 14.00 9,744.00 22.00 15,312.00 22.00 15,312.00 304.2 GRAVEL (F) CY 4,659. 18.00 83,862.00 28.00 130,452.00 23.00 107,157.00 304.3 CRUSHED GRAVEL (F) CY 5,314. 20.00 106,280.00 33.00 175,362.00 24.00 127,536.00 11386 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.31 CRUSHED GRAVEL FOR SHIMMING CY 155. 25.00 3,875.00 33.00 5,115.00 25.00 3,875.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 600. 35.00 21,000.00 40.00 24,000.00 25.00 15,000.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 5,100. 65.00 331,500.00 80.00 408,000.00 68.00 346,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 800. 100.00 80,000.00 120.00 96,000.00 120.00 96,000.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 261. 100.00 26,100.00 120.00 31,320.00 85.00 22,185.00 417. COLD PLANING BITUMINOUS SURFACES SY 2,445. 8.50 20,782.50 8.60 21,027.00 9.00 22,005.00 570.4 MORTAR RUBBLE MASONRY (F) CY 2.93 500.00 1,465.00 450.00 1,318.50 550.00 1,611.50 585.2 STONE FILL, CLASS B CY 43. 50.00 2,150.00 40.00 1,720.00 38.00 1,634.00 585.3 STONE FILL, CLASS C CY 60. 40.00 2,400.00 45.00 2,700.00 38.00 2,280.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 310. 1.50 465.00 1.60 496.00 2.50 775.00 603.00215 15" R.C. PIPE, 2000D LF 560. 45.00 25,200.00 39.00 21,840.00 35.00 19,600.00 603.00218 18" R.C. PIPE, 2000D LF 180. 50.00 9,000.00 44.00 7,920.00 45.00 8,100.00 603.00224 24" R.C. PIPE, 2000D LF 400. 75.00 30,000.00 47.00 18,800.00 65.00 26,000.00 603.30115 15" R.C. END SECTIONS EA 1. 675.00 675.00 580.00 580.00 800.00 800.00 603.30124 24" R.C. END SECTIONS EA 1. 840.00 840.00 760.00 760.00 900.00 900.00 603.34112 12" STEEL END SECTIONS EA 9. 125.00 1,125.00 68.00 612.00 140.00 1,260.00 603.34115 15" STEEL END SECTIONS EA 2. 150.00 300.00 84.00 168.00 155.00 310.00 603.34124 24" STEEL END SECTIONS EA 2. 225.00 450.00 160.00 320.00 300.00 600.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 280. 28.00 7,840.00 39.00 10,920.00 34.00 9,520.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 220. 34.00 7,480.00 40.00 8,800.00 36.00 7,920.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 430. 42.00 18,060.00 42.00 18,060.00 55.00 23,650.00 603.83224 24" PLASTIC PIPE (SMOOTH INTERIOR) LF 90. 48.00 4,320.00 52.00 4,680.00 60.00 5,400.00 604.0007 POLYETHYLENE LINER EA 9. 225.00 2,025.00 380.00 3,420.00 300.00 2,700.00 604.12 CATCH BASINS TYPE B U 21. 1,950.00 40,950.00 2,100.00 44,100.00 1,650.00 34,650.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 2. 2,850.00 5,700.00 4,700.00 9,400.00 2,500.00 5,000.00 604.32 DRAINAGE MANHOLES U 1. 2,150.00 2,150.00 2,000.00 2,000.00 2,000.00 2,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 33. 275.00 9,075.00 200.00 6,600.00 310.00 10,230.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 3. 275.00 825.00 200.00 600.00 350.00 1,050.00 604.6 MANHOLE COVERS & FRAMES EA 1. 250.00 250.00 595.00 595.00 450.00 450.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 2,200. 20.00 44,000.00 23.00 50,600.00 16.00 35,200.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 265. 25.00 6,625.00 30.00 7,950.00 23.00 6,095.00 605.79 UNDERDRAIN FLUSHING BASINS EA 5. 550.00 2,750.00 500.00 2,500.00 575.00 2,875.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 537.5 17.80 9,567.50 21.00 11,287.50 18.50 9,943.75 11386 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 2,250.00 4,500.00 2,700.00 5,400.00 2,300.00 4,600.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 4. 550.00 2,200.00 650.00 2,600.00 550.00 2,200.00 608.24 4" CONCRETE SIDEWALK (F) SY 569. 55.00 31,295.00 36.00 20,484.00 45.00 25,605.00 608.4615 6" GRANITE COBBLES SY 470. 160.00 75,200.00 177.00 83,190.00 165.00 77,550.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 20. 275.00 5,500.00 300.00 6,000.00 700.00 14,000.00 609.01 STRAIGHT GRANITE CURB LF 2,550. 17.40 44,370.00 21.00 53,550.00 15.75 40,162.50 609.02 CURVED GRANITE CURB LF 185. 26.60 4,921.00 32.00 5,920.00 25.00 4,625.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 250. 166.80 41,700.00 16.00 4,000.00 12.00 3,000.00 609.5 RESET GRANITE CURB LF 150. 8.30 1,245.00 7.00 1,050.00 7.00 1,050.00 612.04 SEWER MANHOLES VF 8. 325.00 2,600.00 380.00 3,040.00 250.00 2,000.00 612.3508 8" PVC SEWER PIPE, SDR 35 LF 75. 80.00 6,000.00 55.00 4,125.00 30.00 2,250.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 315.00 1,260.00 380.00 1,520.00 400.00 1,600.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 345. 7.35 2,535.75 9.00 3,105.00 10.00 3,450.00 615.02 TRAFFIC SIGN TYPE B (F) SF 124. 60.00 7,440.00 80.00 9,920.00 68.00 8,432.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 94. 75.00 7,050.00 90.00 8,460.00 90.00 8,460.00 615.03 TRAFFIC SIGN TYPE C (F) SF 292. 45.00 13,140.00 42.00 12,264.00 38.00 11,096.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 200.00 200.00 200.00 200.00 175.00 175.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 69. 20.00 1,380.00 17.50 1,207.50 19.00 1,311.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 618.7 FLAGGERS HR 4,800. 20.00 96,000.00 24.20 116,160.00 20.00 96,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 61,160.00 61,160.00 65,000.00 65,000.00 175,000.00 175,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 13,500.00 40,500.00 15,000.00 45,000.00 15,000.00 45,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 40. 350.00 14,000.00 415.00 16,600.00 550.00 22,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 11. 5.00 55.00 5.00 55.00 5.00 55.00 621.31 SINGLE DELINEATOR WITH POST EA 75. 28.00 2,100.00 33.00 2,475.00 30.00 2,250.00 622.1 STEEL WITNESS MARKERS EA 26. 21.00 546.00 24.00 624.00 22.00 572.00 622.2 CONCRETE BOUNDS EA 21. 275.00 5,775.00 300.00 6,300.00 275.00 5,775.00 622.5 RESETTING BOUNDS EA 1. 225.00 225.00 220.00 220.00 250.00 250.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 2. 630.00 1,260.00 725.00 1,450.00 500.00 1,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 4,550. 2.50 11,375.00 2.20 10,010.00 2.50 11,375.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 116,400. .15 17,460.00 .19 22,116.00 .15 17,460.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 555. .20 111.00 .25 138.75 .37 205.35 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 1,450. .22 319.00 .27 391.50 .60 870.00 11386 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 210. 1.00 210.00 1.15 241.50 1.50 315.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 420. 2.00 840.00 2.40 1,008.00 1.75 735.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 280. 1.00 280.00 1.25 350.00 1.00 280.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 710. 1.25 887.50 1.50 1,065.00 1.35 958.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 80. 2.00 160.00 2.25 180.00 3.00 240.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 210. 7.00 1,470.00 8.00 1,680.00 4.00 840.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 15,250. .35 5,337.50 .35 5,337.50 .40 6,100.00 641. LOAM CY 2,100. 18.00 37,800.00 24.00 50,400.00 19.00 39,900.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 1.6 650.00 1,040.00 800.00 1,280.00 700.00 1,120.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 8,950. 1.45 12,977.50 1.80 16,110.00 1.60 14,320.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 3,900. 1.75 6,825.00 2.20 8,580.00 1.90 7,410.00 645.3 EROSION STONE TON 220. 28.00 6,160.00 20.00 4,400.00 35.00 7,700.00 645.531 SILT FENCE LF 2,200. 4.75 10,450.00 2.00 4,400.00 2.75 6,050.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 10,000.00 10,000.00 3,000.00 3,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 150. 70.00 10,500.00 75.00 11,250.00 100.00 15,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3.7 1,395.00 5,161.50 1,500.00 5,550.00 1,500.00 5,550.00 650.2 LANDSCAPING U 1. 81,530.00 81,530.00 100,000.00 100,000.00 100,000.00 100,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 17. 225.00 3,825.00 220.00 3,740.00 150.00 2,550.00 692. MOBILIZATION U 1. 219,706.75 219,706.75 246,000.00 246,000.00 320,000.00 320,000.00 698.13 FIELD OFFICE TYPE C MON 17. 2,000.00 34,000.00 1,200.00 20,400.00 1,900.00 32,300.00 698.2 PHYSICAL TESTING LABORATORY MON 8. 1,250.00 10,000.00 500.00 4,000.00 1,500.00 12,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 11386 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 6,700.00 6,700.00 6,700.00 6,700.00 6,700.00 6,700.00 $2,388,388.00 $2,557,477.75 $2,574,392.60