THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: KEENE-SWANZEY A000(281), 10309H & A000(457), 10309O COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: OCTOBER 5, 2006 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: VARIOUS ROADS IN THE CITY OF KEENE, SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 1, 2008 A PARK CONSTRUCTION CORP. PO BOX 600, FITZWILLIAM, NH 03447 $ 6,386,989.80 B THE LANE CONSTRUCTION CORPORATION 965 EAST MAIN STREET, MERIDEN, CT 06450 $ 6,899,586.42 C R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 7,029,327.05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .35 20,000.00 7,000.00 30,000.00 10,500.00 85,000.00 29,750.00 201.21 REMOVING SMALL TREES EA 3. 450.00 1,350.00 400.00 1,200.00 700.00 2,100.00 201.22 REMOVING LARGE TREES EA 3. 650.00 1,950.00 600.00 1,800.00 1,100.00 3,300.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 50. 60.00 3,000.00 40.00 2,000.00 65.00 3,250.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 350.00 350.00 3,000.00 3,000.00 325.00 325.00 203.1 COMMON EXCAVATION M3 22,790. 14.00 319,060.00 9.50 216,505.00 19.00 433,010.00 203.2 ROCK EXCAVATION M3 125. 50.00 6,250.00 125.00 15,625.00 150.00 18,750.00 203.6 EMBANKMENT-IN-PLACE (F) M3 30,345. 15.00 455,175.00 8.50 257,932.50 19.00 576,555.00 206.1 COMMON STRUCTURE EXCAVATION M3 385. 22.00 8,470.00 25.00 9,625.00 26.00 10,010.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 110. 30.00 3,300.00 25.00 2,750.00 61.00 6,710.00 206.2 ROCK STRUCTURE EXCAVATION M3 70. 125.00 8,750.00 150.00 10,500.00 55.00 3,850.00 209.1 GRANULAR BACKFILL M3 110. 30.00 3,300.00 40.00 4,400.00 44.00 4,840.00 214. FINE GRADING U 1. 120,000.00 120,000.00 200,000.00 200,000.00 135,000.00 135,000.00 304.1 SAND (F) M3 7,329. 18.00 131,922.00 25.00 183,225.00 30.00 219,870.00 304.2 GRAVEL (F) M3 7,224. 22.00 158,928.00 25.00 180,600.00 38.00 274,512.00 304.3 CRUSHED GRAVEL (F) M3 9,413. 32.00 301,216.00 25.00 235,325.00 44.00 414,172.00 304.31 CRUSHED GRAVEL FOR SHIMMING M3 2,900. 32.00 92,800.00 35.00 101,500.00 44.00 127,600.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 10. 32.00 320.00 75.00 750.00 55.00 550.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) T 12,600. 78.00 982,800.00 79.50 1,001,700.00 73.00 919,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 310. 150.00 46,500.00 200.00 62,000.00 120.00 37,200.00 10309H PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.99 TEMPORARY BITUMINOUS PAVEMENT T 750. 110.00 82,500.00 110.00 82,500.00 100.00 75,000.00 417. COLD PLANING BITUMINOUS SURFACES M2 10,800. 5.00 54,000.00 6.00 64,800.00 7.00 75,600.00 520.1 CONCRETE CLASS A M3 46. 470.00 21,620.00 850.00 39,100.00 1,350.00 62,100.00 520.21 CONCRETE CLASS B, FOOTINGS (F) M3 85. 410.00 34,850.00 395.00 33,575.00 400.00 34,000.00 544. REINFORCING STEEL (F) KG 5,425. 2.50 13,562.50 2.50 13,562.50 2.00 10,850.00 544.1 REINFORCING STEEL (ROADWAY) KG 410. 2.50 1,025.00 2.00 820.00 2.00 820.00 585.2 STONE FILL, CLASS B M3 150. 45.00 6,750.00 80.00 12,000.00 65.00 9,750.00 585.3 STONE FILL, CLASS C M3 120. 45.00 5,400.00 85.00 10,200.00 63.00 7,560.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 500. 3.00 1,500.00 3.00 1,500.00 5.00 2,500.00 603.00203 300 MM R.C. PIPE, CLASS III LM 4. 485.00 1,940.00 600.00 2,400.00 220.00 880.00 603.00204 375 MM R.C. PIPE, CLASS III LM 705. 265.00 186,825.00 150.00 105,750.00 225.00 158,625.00 603.00205 450 MM R.C. PIPE, CLASS III LM 180. 270.00 48,600.00 350.00 63,000.00 255.00 45,900.00 603.00206 600 MM R.C. PIPE, CLASS III LM 40. 337.00 13,480.00 400.00 16,000.00 285.00 11,400.00 603.00212 1200 MM R.C. PIPE, CLASS III LM 6. 715.00 4,290.00 650.00 3,900.00 675.00 4,050.00 603.00214 1350 MM R.C. PIPE, CLASS III LM 54. 587.00 31,698.00 700.00 37,800.00 835.00 45,090.00 603.00215 1500 MM R.C. PIPE, CLASS III LM 25. 870.00 21,750.00 1,500.00 37,500.00 1,075.00 26,875.00 603.00304 375 MM R.C. PIPE, CLASS IV LM 5. 485.00 2,425.00 460.00 2,300.00 275.00 1,375.00 603.11003 300 MM CORR. STEEL PIPE, 1.63 MM LM 4. 110.00 440.00 450.00 1,800.00 190.00 760.00 603.30104 375 MM R.C. END SECT. EA 8. 600.00 4,800.00 200.00 1,600.00 880.00 7,040.00 603.30105 450 MM R.C. END SECT. EA 1. 650.00 650.00 225.00 225.00 1,100.00 1,100.00 603.30106 600 MM R.C. END SECT. EA 2. 950.00 1,900.00 320.00 640.00 1,300.00 2,600.00 604.0007 POLYETHYLENE LINER EA 66. 150.00 9,900.00 240.00 15,840.00 300.00 19,800.00 604.12 CATCH BASINS TYPE B U 66. 1,600.00 105,600.00 2,200.00 145,200.00 1,900.00 125,400.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 4. 2,200.00 8,800.00 3,800.00 15,200.00 3,000.00 12,000.00 604.1218 CATCH BASINS TYPE B, 1.8 M DIA U 1.1 2,800.00 3,080.00 4,200.00 4,620.00 4,000.00 4,400.00 604.15 CATCH BASINS TYPE E U 10. 1,800.00 18,000.00 2,000.00 20,000.00 1,900.00 19,000.00 604.32 DRAINAGE MANHOLES U 1. 3,500.00 3,500.00 1,800.00 1,800.00 1,800.00 1,800.00 604.3218 DRAINAGE MANHOLES, 1.8 M DIA U 1. 4,500.00 4,500.00 3,800.00 3,800.00 4,000.00 4,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LM 3. 400.00 1,200.00 1,600.00 4,800.00 340.00 1,020.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LM 2. 700.00 1,400.00 1,000.00 2,000.00 340.00 680.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LM 2. 700.00 1,400.00 1,100.00 2,200.00 400.00 800.00 10309H PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.6 MANHOLE COVERS & FRAMES EA 6. 400.00 2,400.00 475.00 2,850.00 440.00 2,640.00 605.79 UNDERDRAIN FLUSHING BASINS EA 11. 150.00 1,650.00 600.00 6,600.00 885.00 9,735.00 605.915 150 MM PIPE UND.(CONTRACT ORS OPTION) LM 700. 76.00 53,200.00 60.00 42,000.00 75.00 52,500.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 7.62 190.00 1,447.80 115.00 876.30 180.00 1,371.60 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LM 9.53 200.00 1,906.00 164.00 1,562.92 190.00 1,810.70 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 1,500.00 1,500.00 650.00 650.00 1,400.00 1,400.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 2,300.00 2,300.00 1,500.00 1,500.00 2,200.00 2,200.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 120. 30.00 3,600.00 25.00 3,000.00 25.00 3,000.00 608.210 100 MM CONCRETE SIDEWALK (F) M2 3,032. 60.00 181,920.00 45.00 136,440.00 65.00 197,080.00 608.215 150 MM CONCRETE SIDEWALK (F) M2 1,871. 65.00 121,615.00 60.00 112,260.00 70.00 130,970.00 608.220 200 MM CONCRETE SIDEWALK (F) M2 445. 110.00 48,950.00 120.00 53,400.00 110.00 48,950.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON M2 80. 450.00 36,000.00 375.00 30,000.00 500.00 40,000.00 609.01 STRAIGHT GRANITE CURB LM 2,190. 57.00 124,830.00 60.00 131,400.00 52.00 113,880.00 609.02 CURVED GRANITE CURB LM 77. 96.00 7,392.00 115.00 8,855.00 90.00 6,930.00 609.21 STRAIGHT GRANITE SLOPE CURB LM 20. 47.00 940.00 53.00 1,060.00 50.00 1,000.00 609.2115 STRAIGHT GRANITE SLOPE CURB 150 MM HIGH LM 80. 53.00 4,240.00 56.00 4,480.00 55.00 4,400.00 609.2215 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 150 MM HIGH LM 25. 55.00 1,375.00 56.00 1,400.00 58.00 1,450.00 609.5 RESET GRANITE CURB LM 836. 30.00 25,080.00 27.00 22,572.00 21.00 17,556.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 2,000.00 2,000.00 5,000.00 5,000.00 4,500.00 4,500.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 16. 150.00 2,400.00 200.00 3,200.00 550.00 8,800.00 614.3081 75 MM STEEL CONDUIT LM 64. 42.00 2,688.00 50.00 3,200.00 40.00 2,560.00 614.511 CONCRETE PULL BOX 350 MM EA 20. 270.00 5,400.00 300.00 6,000.00 250.00 5,000.00 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 9. 300.00 2,700.00 290.00 2,610.00 275.00 2,475.00 614.70814 75 MM PVC PLASTIC CONDUIT SCHEDULE 40 LM 220. 22.00 4,840.00 24.60 5,412.00 22.00 4,840.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 820. 42.00 34,440.00 85.00 69,700.00 45.00 36,900.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) M2 36.6 700.00 25,620.00 650.00 23,790.00 600.00 21,960.00 615.02 TRAFFIC SIGN TYPE B (F) M2 2.2 700.00 1,540.00 650.00 1,430.00 600.00 1,320.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) M2 45.2 750.00 33,900.00 700.00 31,640.00 650.00 29,380.00 10309H PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 12. 1,400.00 16,800.00 1,200.00 14,400.00 1,250.00 15,000.00 615.03 TRAFFIC SIGN TYPE C (F) M2 60.1 400.00 24,040.00 365.00 21,936.50 360.00 21,636.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 9. 250.00 2,250.00 200.00 1,800.00 250.00 2,250.00 615.04 TRAFFIC SIGN TYPE AA (F) M2 131. 200.00 26,200.00 180.00 23,580.00 150.00 19,650.00 615.043 REMOVING TRAFFIC SIGN TYPE AA U 4. 200.00 800.00 200.00 800.00 250.00 1,000.00 615.05 TRAFFIC SIGN TYPE BB (F) M2 8.9 220.00 1,958.00 200.00 1,780.00 250.00 2,225.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 19.6 200.00 3,920.00 175.00 3,430.00 250.00 4,900.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 42,000.00 42,000.00 60,000.00 60,000.00 40,000.00 40,000.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 45,000.00 45,000.00 80,000.00 80,000.00 40,000.00 40,000.00 615.20003 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 42,000.00 42,000.00 60,000.00 60,000.00 40,000.00 40,000.00 615.20004 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 45,000.00 45,000.00 80,000.00 80,000.00 42,500.00 42,500.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,500.00 8,500.00 7,000.00 7,000.00 5,500.00 5,500.00 615.30002 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,500.00 8,500.00 7,000.00 7,000.00 5,000.00 5,000.00 615.30003 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,500.00 8,500.00 7,000.00 7,000.00 5,500.00 5,500.00 616.122 COMMUNICATIONS CABLE LM 410. 9.00 3,690.00 4.60 1,886.00 6.00 2,460.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 62,000.00 62,000.00 65,000.00 65,000.00 50,000.00 50,000.00 616.192 ALTERATIONS TO TRAFFIC SIGNALS U 1. 55,000.00 55,000.00 58,000.00 58,000.00 40,000.00 40,000.00 616.193 ALTERATIONS TO TRAFFIC SIGNALS U 1. 37,000.00 37,000.00 25,000.00 25,000.00 25,000.00 25,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 272,000.00 272,000.00 272,000.00 272,000.00 272,000.00 272,000.00 618.7 FLAGGERS HR 3,050. 21.00 64,050.00 25.00 76,250.00 18.00 54,900.00 619.1 MAINTENANCE OF TRAFFIC U 1. 300,000.00 300,000.00 750,000.00 750,000.00 395,000.00 395,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 8. 25,000.00 200,000.00 20,000.00 160,000.00 12,000.00 96,000.00 621.31 SINGLE DELINEATOR WITH POST EA 120. 30.00 3,600.00 30.00 3,600.00 25.00 3,000.00 621.321 DOUBLE DELINEATOR W/POST (WHITE) EA 60. 35.00 2,100.00 35.00 2,100.00 30.00 1,800.00 622.1 STEEL WITNESS MARKERS EA 30. 30.00 900.00 25.00 750.00 29.00 870.00 622.2 CONCRETE BOUNDS EA 4. 200.00 800.00 300.00 1,200.00 250.00 1,000.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 9. 550.00 4,950.00 500.00 4,500.00 500.00 4,500.00 625.52 LIGHT POLE (HIGHWAY) U 9. 2,000.00 18,000.00 1,730.00 15,570.00 1,850.00 16,650.00 628.2 SAWED BITUMINOUS PAVEMENT LM 870. 6.50 5,655.00 10.00 8,700.00 6.00 5,220.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 21,900. .35 7,665.00 .32 7,008.00 .30 6,570.00 10309H PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0115 RETROREFLECTIVE PAINT PAVEMENT MARKING, 150 MM LINE LM 340. .40 136.00 .35 119.00 .50 170.00 632.0120 RETROREFLECTIVE PAINT PAVEMENT MARKING, 200 MM LINE LM 105. 1.00 105.00 .50 52.50 .75 78.75 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 290. 1.00 290.00 1.00 290.00 2.00 580.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 225. 12.00 2,700.00 10.00 2,250.00 10.00 2,250.00 632.3110 RETROREFLECT. THERMOPLAS. PAVE. MARKING 100 MM LIN LM 2,600. 1.50 3,900.00 1.30 3,380.00 1.35 3,510.00 632.3115 RETROREFLECT. THERMOPLAS. PAVE. MARKING 150 MM LIN LM 590. 1.70 1,003.00 1.55 914.50 1.75 1,032.50 632.3120 RETROREFLECT. THERMOPLAS. PAVE. MARKING 200 MM LIN LM 2,000. 3.00 6,000.00 2.80 5,600.00 3.00 6,000.00 632.3130 RETROREFLECT. THERMOPLAS. PAVE. MARKING 300 MM LIN LM 25. 3.50 87.50 3.28 82.00 3.50 87.50 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 110. 5.00 550.00 4.42 486.20 5.00 550.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD M2 165. 30.00 4,950.00 25.00 4,125.00 30.00 4,950.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 3,500. 2.00 7,000.00 1.50 5,250.00 1.50 5,250.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD M2 130. 6.00 780.00 5.00 650.00 5.00 650.00 641. LOAM M3 100. 35.00 3,500.00 55.00 5,500.00 35.00 3,500.00 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 KG 20. 30.00 600.00 25.00 500.00 25.00 500.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 1,030. 3.00 3,090.00 2.95 3,038.50 3.00 3,090.00 645.3 EROSION STONE T 200. 45.00 9,000.00 50.00 10,000.00 40.00 8,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 660. 6.00 3,960.00 10.00 6,600.00 9.00 5,940.00 645.531 SILT FENCE LM 2,900. 14.00 40,600.00 5.00 14,500.00 7.00 20,300.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,000.00 7,000.00 3,000.00 3,000.00 2,000.00 2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 256. 85.00 21,760.00 100.00 25,600.00 60.00 15,360.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 3.3 5,000.00 16,500.00 4,500.00 14,850.00 4,500.00 14,850.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS M2 950. 2.00 1,900.00 1.00 950.00 1.00 950.00 647.1 HUMUS M3 3,000. 10.00 30,000.00 35.00 105,000.00 28.00 84,000.00 647.250 HUMUS INTERMIXED 50 MM M3 100. 40.00 4,000.00 40.00 4,000.00 30.00 3,000.00 670.101 TEMPORARY LIGHTING U 1. 1,000.00 1,000.00 50,000.00 50,000.00 5,000.00 5,000.00 10309H PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 692. MOBILIZATION U 1. 620,000.00 620,000.00 630,000.00 630,000.00 650,000.00 650,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.13 FIELD OFFICE TYPE C MON 18. 1,200.00 21,600.00 2,250.00 40,500.00 1,700.00 30,600.00 698.2 PHYSICAL TESTING LABORATORY MON 18. 600.00 10,800.00 900.00 16,200.00 1,270.00 22,860.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 $6,386,989.80 $6,899,586.42 $7,029,327.05