THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: STODDARD X-A000(335), 14369 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: DECEMBER 1, 2005 SCOPE OF WORK: PAVEMENT REHABILITATION AND ROADWAY IMPROVEMENTS LOCATION: NH ROUTE 9 EAST OF GRANITE LAKE ROAD COMPLETION DATE: SEPTEMBER 15, 2006 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 3,642,293.10 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 3,744,304.00 C THE LANE CONSTRUCTION CORP. 965 EAST MAIN ST., MERIDEN, CT 06450 $ 4,080,104.50 D R.S. AUDLEY, INC. 609 ROUTE 3AM BOW, NH 03304 $ 4,442,674.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.0101 CLEARING A .5 4,000.00 2,000.00 5,000.00 2,500.00 10,000.00 5,000.00 201.101 CLEARING AND GRUBBING A .5 8,000.00 4,000.00 11,000.00 5,500.00 10,000.00 5,000.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,053. 2.20 4,516.60 2.00 4,106.00 2.00 4,106.00 203.1 COMMON EXCAVATION CY 5,800. 5.50 31,900.00 7.80 45,240.00 12.00 69,600.00 203.2 ROCK EXCAVATION CY 400. 38.00 15,200.00 39.50 15,800.00 50.00 20,000.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 175. 12.00 2,100.00 10.00 1,750.00 15.00 2,625.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 11. 800.00 8,800.00 650.00 7,150.00 1,000.00 11,000.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 24. 900.00 21,600.00 650.00 15,600.00 800.00 19,200.00 203.5595 GUARDRAIL E-1 PLATFORM LF 175. 9.50 1,662.50 12.00 2,100.00 15.00 2,625.00 203.601 EMBANKMENT-IN-PLACE CY 1,850. 7.25 13,412.50 10.00 18,500.00 7.00 12,950.00 203.9 ROCK SCALING- HAND METHOD HR 5. 100.00 500.00 3,000.00 15,000.00 75.00 375.00 203.92 ROCK SCALING- MACHINE METHOD HR 15. 390.00 5,850.00 600.00 9,000.00 250.00 3,750.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 13.00 650.00 40.00 2,000.00 30.00 1,500.00 206.2 ROCK STRUCTURE EXCAVATION CY 2,000. 90.00 180,000.00 100.00 200,000.00 91.00 182,000.00 209.4 GRANULAR BACKFILL (GRAV) CY 5,750. 14.00 80,500.00 15.50 89,125.00 18.00 103,500.00 214. FINE GRADING U 1. 85,000.00 85,000.00 62,000.00 62,000.00 70,000.00 70,000.00 214.3 FINE GRADING EARTH BERMS IN ROCKCUTS LF 2,750. 3.00 8,250.00 3.00 8,250.00 5.00 13,750.00 304.1 SAND (F) CY 2,635. 17.00 44,795.00 12.90 33,991.50 18.00 47,430.00 304.2 GRAVEL (F) CY 2,620. 17.40 45,588.00 18.70 48,994.00 18.00 47,160.00 304.3 CRUSHED GRAVEL (F) CY 2,400. 22.00 52,800.00 22.50 54,000.00 18.00 43,200.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 20,000. 21.20 424,000.00 23.50 470,000.00 17.00 340,000.00 14369 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,300. 23.00 29,900.00 27.50 35,750.00 22.00 28,600.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 150. 25.00 3,750.00 65.00 9,750.00 60.00 9,000.00 403.11052 HOT BITUMINOUS PAVEMENT, MACH. METHOD (SUPERPAVE) (QC/QA TIER 2) TON 16,000. 50.00 800,000.00 52.00 832,000.00 56.65 906,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 700. 90.00 63,000.00 110.00 77,000.00 75.00 52,500.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 2,175. 50.00 108,750.00 54.00 117,450.00 56.00 121,800.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 4,600. 7.00 32,200.00 6.50 29,900.00 6.00 27,600.00 520.1 CONCRETE CLASS A CY 20. 410.00 8,200.00 540.00 10,800.00 500.00 10,000.00 570.401 MOTAR RUBBLE MASONRY CY 10. 410.00 4,100.00 480.00 4,800.00 525.00 5,250.00 585.3 STONE FILL, CLASS C CY 50. 50.00 2,500.00 50.00 2,500.00 35.00 1,750.00 603.00215 15" R.C. PIPE, 2000D LF 525. 46.00 24,150.00 80.00 42,000.00 60.00 31,500.00 603.00218 18" R.C. PIPE, 2000D LF 110. 50.00 5,500.00 95.00 10,450.00 65.00 7,150.00 603.30115 15" R.C. END SECTIONS EA 5. 750.00 3,750.00 1,000.00 5,000.00 400.00 2,000.00 603.34112 12" STEEL END SECTIONS EA 5. 130.00 650.00 250.00 1,250.00 300.00 1,500.00 603.44012 12" CORRUGATED POLY. PIPE FOR SLOPE DRAIN LF 50. 25.00 1,250.00 30.00 1,500.00 30.00 1,500.00 604.0007 POLYETHYLENE LINER EA 15. 240.00 3,600.00 200.00 3,000.00 225.00 3,375.00 604.15 CATCH BASINS TYPE E U 16. 1,625.00 26,000.00 1,700.00 27,200.00 2,000.00 32,000.00 604.242 DROP INLETS TYPE D-B U 3. 1,000.00 3,000.00 1,500.00 4,500.00 1,200.00 3,600.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 25. 375.00 9,375.00 250.00 6,250.00 220.00 5,500.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 30. 275.00 8,250.00 300.00 9,000.00 250.00 7,500.00 604.75 GRATES & FRAMES, TYPE E EA 30. 450.00 13,500.00 550.00 16,500.00 450.00 13,500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 12,000. 13.60 163,200.00 15.50 186,000.00 15.00 180,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 4,000. 20.00 80,000.00 20.00 80,000.00 17.00 68,000.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 22.00 6,600.00 22.00 6,600.00 19.00 5,700.00 605.79 UNDERDRAIN FLUSHING BASINS EA 8. 550.00 4,400.00 500.00 4,000.00 250.00 2,000.00 605.82251 24" AGGE UND. TYPE 2, WITH P.C. POLY PIPE LF 2,500. 20.00 50,000.00 26.00 65,000.00 25.00 62,500.00 605.82352 30" AGGRE UND. TYPE 2, WITH P.C. POLY PIPE LF 2,000. 26.00 52,000.00 30.00 60,000.00 45.00 90,000.00 605.82451 36" AGGRE UND. TYPE 2, WITH P.C. POLY PIPE LF 500. 23.00 11,500.00 38.00 19,000.00 60.00 30,000.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 1,300. 10.00 13,000.00 8.80 11,440.00 8.00 10,400.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 105. 50.00 5,250.00 58.00 6,090.00 48.00 5,040.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 105. 8.50 892.50 14.00 1,470.00 8.00 840.00 14369 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 425. 16.00 6,800.00 21.50 9,137.50 15.50 6,587.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 34. 2,100.00 71,400.00 2,520.00 85,680.00 1,950.00 66,300.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 325. 24.00 7,800.00 26.00 8,450.00 22.00 7,150.00 606.91 RESETTING OR SETTING GUARDRAIL LF 10,750. 10.50 112,875.00 10.00 107,500.00 9.50 102,125.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 4,000. 2.75 11,000.00 4.75 19,000.00 4.00 16,000.00 614.523 MOLDED PULL BOX 17"X30" EA 5. 400.00 2,000.00 500.00 2,500.00 425.00 2,125.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 1,225. 12.00 14,700.00 9.00 11,025.00 9.00 11,025.00 615.01 TRAFFIC SIGN TYPE A (F) SF 73.5 80.00 5,880.00 45.00 3,307.50 70.00 5,145.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 1. 850.00 850.00 500.00 500.00 800.00 800.00 615.02 TRAFFIC SIGN TYPE B (F) SF 24. 60.00 1,440.00 65.00 1,560.00 56.00 1,344.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 126. 80.00 10,080.00 85.00 10,710.00 72.00 9,072.00 615.03 TRAFFIC SIGN TYPE C (F) SF 300.5 37.00 11,118.50 35.00 10,517.50 35.00 10,517.50 615.06 TRAFFIC SIGN TYPE CC (F) SF 27.5 17.00 467.50 15.00 412.50 15.00 412.50 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 5,000. 18.00 90,000.00 20.00 100,000.00 18.00 90,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 102,000.00 102,000.00 75,000.00 75,000.00 250,000.00 250,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 7,200.00 14,400.00 9,000.00 18,000.00 10,000.00 20,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 900.00 1,800.00 300.00 600.00 500.00 1,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 125. 6.00 750.00 4.30 537.50 5.00 625.00 621.31 SINGLE DELINEATOR WITH POST EA 350. 23.00 8,050.00 26.00 9,100.00 22.00 7,700.00 622.1 STEEL WITNESS MARKERS EA 25. 25.00 625.00 25.00 625.00 25.00 625.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 1. 900.00 900.00 860.00 860.00 2,500.00 2,500.00 625.882 RESETTING LIGHT POLE (HIGHWAY) EA 1. 1,000.00 1,000.00 1,300.00 1,300.00 1,500.00 1,500.00 628.2 SAWED BITUMINOUS PAVEMENT LF 250. 2.75 687.50 1.70 425.00 5.00 1,250.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 210,000. .10 21,000.00 .13 27,300.00 .10 21,000.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 150. 1.35 202.50 2.00 300.00 1.25 187.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 150. 2.50 375.00 5.00 750.00 2.25 337.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 150. 4.00 600.00 9.00 1,350.00 3.75 562.50 641. LOAM CY 50. 15.00 750.00 50.00 2,500.00 50.00 2,500.00 14369 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.3 EROSION STONE TON 500. 35.00 17,500.00 45.00 22,500.00 30.00 15,000.00 645.531 SILT FENCE LF 12,500. 2.30 28,750.00 2.00 25,000.00 3.00 37,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,800.00 2,800.00 2,500.00 2,500.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 110.00 5,500.00 100.00 5,000.00 125.00 6,250.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.5 1,900.00 10,450.00 1,300.00 7,150.00 1,525.00 8,387.50 647.1 HUMUS CY 2,100. 13.50 28,350.00 38.00 79,800.00 20.00 42,000.00 692. MOBILIZATION U 1. 276,000.00 276,000.00 105,000.00 105,000.00 400,000.00 400,000.00 698.13 FIELD OFFICE TYPE C MON 8. 2,000.00 16,000.00 700.00 5,600.00 1,600.00 12,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 $3,642,293.10 $3,744,304.00 $4,080,104.50 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: STODDARD X-A000(335), 14369 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: DECEMBER 1, 2005 SCOPE OF WORK: PAVEMENT REHABILITATION AND ROADWAY IMPROVEMENTS LOCATION: NH ROUTE 9 EAST OF GRANITE LAKE ROAD COMPLETION DATE: SEPTEMBER 15, 2006 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 3,642,293.10 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 3,744,304.00 C THE LANE CONSTRUCTION CORP. 965 EAST MAIN ST., MERIDEN, CT 06450 $ 4,080,104.50 D R.S. AUDLEY, INC. 609 ROUTE 3AM BOW, NH 03304 $ 4,442,674.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.0101 CLEARING A .5 12,000.00 6,000.00 201.101 CLEARING AND GRUBBING A .5 25,000.00 12,500.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,053. 2.75 5,645.75 203.1 COMMON EXCAVATION CY 5,800. 14.00 81,200.00 203.2 ROCK EXCAVATION CY 400. 65.00 26,000.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 175. 15.00 2,625.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 11. 1,000.00 11,000.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 24. 1,000.00 24,000.00 203.5595 GUARDRAIL E-1 PLATFORM LF 175. 15.00 2,625.00 203.601 EMBANKMENT-IN-PLACE CY 1,850. 14.00 25,900.00 203.9 ROCK SCALING- HAND METHOD HR 5. 530.00 2,650.00 203.92 ROCK SCALING- MACHINE METHOD HR 15. 900.00 13,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 58.00 2,900.00 206.2 ROCK STRUCTURE EXCAVATION CY 2,000. 135.00 270,000.00 209.4 GRANULAR BACKFILL (GRAV) CY 5,750. 1.00 5,750.00 214. FINE GRADING U 1. 95,000.00 95,000.00 214.3 FINE GRADING EARTH BERMS IN ROCKCUTS LF 2,750. 7.50 20,625.00 304.1 SAND (F) CY 2,635. 14.00 36,890.00 304.2 GRAVEL (F) CY 2,620. 25.00 65,500.00 304.3 CRUSHED GRAVEL (F) CY 2,400. 25.00 60,000.00 304.31 CRUSHED GRAVEL FOR SHIMMING CY 20,000. 25.00 500,000.00 14369 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,300. 27.00 35,100.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 150. 27.00 4,050.00 403.11052 HOT BITUMINOUS PAVEMENT, MACH. METHOD (SUPERPAVE) (QC/QA TIER 2) TON 16,000. 47.00 752,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 700. 85.00 59,500.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 2,175. 47.00 102,225.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 4,600. 6.50 29,900.00 520.1 CONCRETE CLASS A CY 20. 1,000.00 20,000.00 570.401 MOTAR RUBBLE MASONRY CY 10. 450.00 4,500.00 585.3 STONE FILL, CLASS C CY 50. 48.00 2,400.00 603.00215 15" R.C. PIPE, 2000D LF 525. 50.00 26,250.00 603.00218 18" R.C. PIPE, 2000D LF 110. 55.00 6,050.00 603.30115 15" R.C. END SECTIONS EA 5. 600.00 3,000.00 603.34112 12" STEEL END SECTIONS EA 5. 150.00 750.00 603.44012 12" CORRUGATED POLY. PIPE FOR SLOPE DRAIN LF 50. 43.00 2,150.00 604.0007 POLYETHYLENE LINER EA 15. 230.00 3,450.00 604.15 CATCH BASINS TYPE E U 16. 1,850.00 29,600.00 604.242 DROP INLETS TYPE D-B U 3. 1,300.00 3,900.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 25. 400.00 10,000.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 30. 400.00 12,000.00 604.75 GRATES & FRAMES, TYPE E EA 30. 650.00 19,500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 12,000. 32.50 390,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 4,000. 38.00 152,000.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 44.00 13,200.00 605.79 UNDERDRAIN FLUSHING BASINS EA 8. 550.00 4,400.00 605.82251 24" AGGE UND. TYPE 2, WITH P.C. POLY PIPE LF 2,500. 36.00 90,000.00 605.82352 30" AGGRE UND. TYPE 2, WITH P.C. POLY PIPE LF 2,000. 41.00 82,000.00 605.82451 36" AGGRE UND. TYPE 2, WITH P.C. POLY PIPE LF 500. 48.00 24,000.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 1,300. 8.40 10,920.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 105. 50.50 5,302.50 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 105. 8.40 882.00 14369 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 425. 16.00 6,800.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 34. 2,050.00 69,700.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 325. 23.00 7,475.00 606.91 RESETTING OR SETTING GUARDRAIL LF 10,750. 10.75 115,562.50 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 4,000. 2.50 10,000.00 614.523 MOLDED PULL BOX 17"X30" EA 5. 350.00 1,750.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 1,225. 8.50 10,412.50 615.01 TRAFFIC SIGN TYPE A (F) SF 73.5 45.00 3,307.50 615.013 REMOVING TRAFFIC SIGN TYPE A U 1. 500.00 500.00 615.02 TRAFFIC SIGN TYPE B (F) SF 24. 60.00 1,440.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 126. 75.00 9,450.00 615.03 TRAFFIC SIGN TYPE C (F) SF 300.5 35.00 10,517.50 615.06 TRAFFIC SIGN TYPE CC (F) SF 27.5 15.00 412.50 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 618.7 FLAGGERS HR 5,000. 18.90 94,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 18,000.00 36,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 4,800.00 9,600.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 125. 5.25 656.25 621.31 SINGLE DELINEATOR WITH POST EA 350. 24.00 8,400.00 622.1 STEEL WITNESS MARKERS EA 25. 23.00 575.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 1. 800.00 800.00 625.882 RESETTING LIGHT POLE (HIGHWAY) EA 1. 1,275.00 1,275.00 628.2 SAWED BITUMINOUS PAVEMENT LF 250. 2.00 500.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 210,000. .09 18,900.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 150. 1.50 225.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 150. 2.50 375.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 150. 3.50 525.00 641. LOAM CY 50. 35.00 1,750.00 14369 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.3 EROSION STONE TON 500. 45.00 22,500.00 645.531 SILT FENCE LF 12,500. 2.85 35,625.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 65.00 3,250.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.5 1,500.00 8,250.00 647.1 HUMUS CY 2,100. 22.00 46,200.00 692. MOBILIZATION U 1. 383,000.00 383,000.00 698.13 FIELD OFFICE TYPE C MON 8. 1,825.00 14,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 20,000.00 20,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 16,000.00 16,000.00 $4,442,674.00