THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SUTTON X-A000 (303), 14328 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MARCH 10, 2005 SCOPE OF WORK: ROCK REMOVAL AND STABILIZATION LOCATION: I-89 SOUTH OF EXIT 10 COMPLETION DATE: SEPTEMBER 30, 2005 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,598,390.50 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 1,933,352.00 C MORRILL CONSTRUCTION, INC. PO BOX 400, HORSE MEADOW RD., N. HAVERHILL, NH 03774 $ 2,394,073.00 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,472,071.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.101 CLEARING AND GRUBBING A 1.2 10,000.00 12,000.00 18,200.00 21,840.00 12,500.00 15,000.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,350. 2.10 4,935.00 2.60 6,110.00 2.25 5,287.50 203.1 COMMON EXCAVATION CY 11,100. 5.50 61,050.00 6.60 73,260.00 6.85 76,035.00 203.2 ROCK EXCAVATION CY 37,100. 13.75 510,125.00 17.40 645,540.00 24.00 890,400.00 203.5595 GUARDRAIL E-1 PLATFORM LF 265. 12.00 3,180.00 18.00 4,770.00 11.50 3,047.50 203.601 EMBANKMENT-IN-PLACE CY 1,350. 4.00 5,400.00 4.00 5,400.00 9.50 12,825.00 203.81 PRESPLITTING HOLES LF 12,300. 5.75 70,725.00 8.00 98,400.00 11.00 135,300.00 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 3,200. 2.50 8,000.00 2.85 9,120.00 3.00 9,600.00 203.91 ROCK SCALING-HAND METHOD HR 80. 30.00 2,400.00 85.00 6,800.00 215.00 17,200.00 203.92 ROCK SCALING- MACHINE METHOD HR 80. 250.00 20,000.00 250.00 20,000.00 250.00 20,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 70. 9.50 665.00 7.00 490.00 35.00 2,450.00 206.2 ROCK STRUCTURE EXCAVATION CY 1,100. 45.00 49,500.00 54.00 59,400.00 50.00 55,000.00 209.1 GRANULAR BACKFILL CY 210. 15.00 3,150.00 18.00 3,780.00 30.00 6,300.00 214.3 FINE GRADING EARTH BERMS IN ROCKCUTS LF 1,550. 3.00 4,650.00 1.85 2,867.50 4.25 6,587.50 224.1 HORIZONTAL DRAIN HOLES LF 1,250. 15.00 18,750.00 9.20 11,500.00 8.00 10,000.00 225.2 PRESTRESSED ROCK BOLTS LF 450. 145.00 65,250.00 155.00 69,750.00 155.00 69,750.00 304.101 SAND CY 5,700. 11.40 64,980.00 17.00 96,900.00 22.00 125,400.00 304.201 GRAVEL CY 1,750. 13.00 22,750.00 24.00 42,000.00 28.00 49,000.00 304.301 CRUSHED GRAVEL CY 1,300. 19.00 24,700.00 26.00 33,800.00 33.00 42,900.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 170. 16.00 2,720.00 30.00 5,100.00 32.50 5,525.00 403.1105 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE) TON 1,360. 47.00 63,920.00 53.00 72,080.00 48.85 66,436.00 14328 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 100. 50.00 5,000.00 105.00 10,500.00 150.00 15,000.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 120. 75.00 9,000.00 71.00 8,520.00 66.00 7,920.00 417. COLD PLANING BITUMINOUS SURFACES (F) SY 8,450. 1.80 15,210.00 2.00 16,900.00 2.00 16,900.00 570.4 MORTAR RUBBLE MASONRY (F) CY 1. 350.00 350.00 400.00 400.00 1,200.00 1,200.00 585.3 STONE FILL, CLASS C CY 40. 30.00 1,200.00 24.00 960.00 56.00 2,240.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 310. 21.00 6,510.00 35.00 10,850.00 28.00 8,680.00 604.15 CATCH BASINS TYPE E U 8. 1,450.00 11,600.00 1,575.00 12,600.00 2,400.00 19,200.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 8. 300.00 2,400.00 220.00 1,760.00 285.00 2,280.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 1. 300.00 300.00 125.00 125.00 450.00 450.00 604.6 MANHOLE COVERS & FRAMES EA 4. 420.00 1,680.00 400.00 1,600.00 485.00 1,940.00 604.85 WATER REPELLENT FOR EXISTING CB'S AND DI'S EA 5. 200.00 1,000.00 30.00 150.00 50.00 250.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 240. 12.15 2,916.00 20.00 4,800.00 28.00 6,720.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 1,300. 21.00 27,300.00 25.00 32,500.00 34.00 44,200.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 3,000. 15.50 46,500.00 19.00 57,000.00 15.50 46,500.00 606.14533 BEAM GUARDRAIL (TERM. UNIT SPECIAL 50 FT.) U 1. 2,100.00 2,100.00 2,745.00 2,745.00 2,200.00 2,200.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 650.00 1,300.00 625.00 1,250.00 675.00 1,350.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 265. 25.00 6,625.00 30.00 7,950.00 26.00 6,890.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,700. 14.00 23,800.00 21.00 35,700.00 24.00 40,800.00 606.41755 5 FEET HIGH VISUAL SCREEN FOR PORTABLE CONCRETE BARRIER LF 1,700. 23.00 39,100.00 23.00 39,100.00 31.50 53,550.00 606.9513 IMPACT ATTENUATION DEVICE (REDIRECTIVE), TEST LEVEL 3 U 1. 15,000.00 15,000.00 24,000.00 24,000.00 15,000.00 15,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 35,000.00 35,000.00 19,500.00 19,500.00 44,000.00 44,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 7,000.00 14,000.00 12,000.00 24,000.00 15,500.00 31,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,000.00 2,000.00 2,300.00 4,600.00 5,500.00 11,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 40. 6.00 240.00 5.75 230.00 5.50 220.00 621.31 SINGLE DELINEATOR WITH POST EA 100. 29.00 2,900.00 30.00 3,000.00 31.00 3,100.00 14328 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 622.1 STEEL WITNESS MARKERS EA 9. 27.00 243.00 28.00 252.00 28.00 252.00 628.2 SAWED BITUMINOUS PAVEMENT LF 80. 4.00 320.00 3.00 240.00 5.00 400.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,500. .16 1,200.00 .40 3,000.00 .30 2,250.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 2,400. .47 1,128.00 1.15 2,760.00 .75 1,800.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 115. 1.50 172.50 1.50 172.50 3.50 402.50 645.3 EROSION STONE TON 20. 25.00 500.00 23.00 460.00 45.00 900.00 645.531 SILT FENCE LF 600. 2.60 1,560.00 2.50 1,500.00 3.00 1,800.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 1,500.00 1,500.00 2,500.00 2,500.00 6,500.00 6,500.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 60. 75.00 4,500.00 115.00 6,900.00 85.00 5,100.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 19,800. .32 6,336.00 .35 6,930.00 .45 8,910.00 647.1 HUMUS CY 1,950. 12.00 23,400.00 11.50 22,425.00 15.00 29,250.00 670.101 TEMPORARY LIGHTING U 1. 5,100.00 5,100.00 5,520.00 5,520.00 5,100.00 5,100.00 670.95 TEMPORARY SAFETY FENCE LF 350. 3.00 1,050.00 6.30 2,205.00 4.50 1,575.00 692. MOBILIZATION U 1. 121,500.00 121,500.00 134,200.00 134,200.00 190,000.00 190,000.00 698.13 FIELD OFFICE TYPE C MON 6. 2,000.00 12,000.00 1,440.00 8,640.00 1,200.00 7,200.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 $1,598,390.50 $1,933,352.00 $2,394,073.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SUTTON X-A000 (303), 14328 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MARCH 10, 2005 SCOPE OF WORK: ROCK REMOVAL AND STABILIZATION LOCATION: I-89 SOUTH OF EXIT 10 COMPLETION DATE: SEPTEMBER 30, 2005 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,598,390.50 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 1,933,352.00 C MORRILL CONSTRUCTION, INC. PO BOX 400, HORSE MEADOW RD., N. HAVERHILL, NH 03774 $ 2,394,073.00 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,472,071.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.101 CLEARING AND GRUBBING A 1.2 24,000.00 28,800.00 202.7 REMOVAL OF GUARDRAIL (F) LF 2,350. 2.50 5,875.00 203.1 COMMON EXCAVATION CY 11,100. 10.00 111,000.00 203.2 ROCK EXCAVATION CY 37,100. 22.00 816,200.00 203.5595 GUARDRAIL E-1 PLATFORM LF 265. 10.00 2,650.00 203.601 EMBANKMENT-IN-PLACE CY 1,350. 10.00 13,500.00 203.81 PRESPLITTING HOLES LF 12,300. 7.10 87,330.00 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 3,200. 2.50 8,000.00 203.91 ROCK SCALING-HAND METHOD HR 80. 850.00 68,000.00 203.92 ROCK SCALING- MACHINE METHOD HR 80. 1,000.00 80,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 70. 8.50 595.00 206.2 ROCK STRUCTURE EXCAVATION CY 1,100. 60.00 66,000.00 209.1 GRANULAR BACKFILL CY 210. 28.00 5,880.00 214.3 FINE GRADING EARTH BERMS IN ROCKCUTS LF 1,550. 8.50 13,175.00 224.1 HORIZONTAL DRAIN HOLES LF 1,250. 8.00 10,000.00 225.2 PRESTRESSED ROCK BOLTS LF 450. 135.00 60,750.00 304.101 SAND CY 5,700. 20.00 114,000.00 304.201 GRAVEL CY 1,750. 30.00 52,500.00 304.301 CRUSHED GRAVEL CY 1,300. 30.00 39,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 170. 35.00 5,950.00 403.1105 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE) TON 1,360. 44.00 59,840.00 14328 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 100. 95.00 9,500.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 120. 60.00 7,200.00 417. COLD PLANING BITUMINOUS SURFACES (F) SY 8,450. 1.70 14,365.00 570.4 MORTAR RUBBLE MASONRY (F) CY 1. 300.00 300.00 585.3 STONE FILL, CLASS C CY 40. 48.00 1,920.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 310. 45.00 13,950.00 604.15 CATCH BASINS TYPE E U 8. 1,700.00 13,600.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 8. 300.00 2,400.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 1. 300.00 300.00 604.6 MANHOLE COVERS & FRAMES EA 4. 400.00 1,600.00 604.85 WATER REPELLENT FOR EXISTING CB'S AND DI'S EA 5. 200.00 1,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 240. 25.00 6,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 1,300. 30.00 39,000.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 3,000. 15.00 45,000.00 606.14533 BEAM GUARDRAIL (TERM. UNIT SPECIAL 50 FT.) U 1. 2,000.00 2,000.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 500.00 1,000.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 265. 25.00 6,625.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,700. 39.00 66,300.00 606.41755 5 FEET HIGH VISUAL SCREEN FOR PORTABLE CONCRETE BARRIER LF 1,700. 29.00 49,300.00 606.9513 IMPACT ATTENUATION DEVICE (REDIRECTIVE), TEST LEVEL 3 U 1. 15,000.00 15,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 100,000.00 100,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 23,000.00 46,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 7,500.00 15,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 40. 5.00 200.00 621.31 SINGLE DELINEATOR WITH POST EA 100. 25.00 2,500.00 14328 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 622.1 STEEL WITNESS MARKERS EA 9. 25.00 225.00 628.2 SAWED BITUMINOUS PAVEMENT LF 80. 2.50 200.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,500. .18 1,350.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 2,400. 1.50 3,600.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 115. 2.00 230.00 645.3 EROSION STONE TON 20. 50.00 1,000.00 645.531 SILT FENCE LF 600. 3.00 1,800.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 1,500.00 1,500.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 60. 50.00 3,000.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 19,800. .32 6,336.00 647.1 HUMUS CY 1,950. 24.50 47,775.00 670.101 TEMPORARY LIGHTING U 1. 4,500.00 4,500.00 670.95 TEMPORARY SAFETY FENCE LF 350. 3.00 1,050.00 692. MOBILIZATION U 1. 150,000.00 150,000.00 698.13 FIELD OFFICE TYPE C MON 6. 2,400.00 14,400.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 1,000.00 1,000.00 $2,472,071.00