THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPSOM-NORTHWOOD STP-X-000S(385), 13336 COUNTIES AND CODES: MERRIMACK 013 ROCKINGHAM 015 DATE BIDS OPEN: MAY 5, 2005 SCOPE OF WORK: PAVEMENT REHABILITATION AND SAFETY WORK LOCATION: US ROUTE 4 AND ROUTE 107 COMPLETION DATE: OCTOBER 28, 2005 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,970,194.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.21 REMOVING SMALL TREES EA 3. 300.00 900.00 201.22 REMOVING LARGE TREES EA 3. 900.00 2,700.00 203.1 COMMON EXCAVATION CY 400. 15.00 6,000.00 203.601 EMBANKMENT IN PLACE CY 50. 6.50 325.00 203.92 ROCK SCALING- MACHINE METHOD HR 10. 610.00 6,100.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 65.00 3,250.00 206.2 ROCK STRUCTURE EXCAVATION CY 525. 55.00 28,875.00 209.4 GRANULAR BACKFILL (GRAV) CY 1,850. 29.00 53,650.00 304.301 CRUSHED GRAVEL CY 300. 40.00 12,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,000. 27.00 54,000.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 300. 50.00 15,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 500. 60.00 30,000.00 403.11952 HOT BITUMINOUS PAVEMENT MACHINE METHOD (NIGHT) (SUPERPAVE) (QC/QA) TON 26,000. 46.00 1,196,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 2,000. 100.00 200,000.00 417.01 COLD PLANING OF BITUMINOUS SURFACES SY 38,000. 2.95 112,100.00 520.1 CONCRETE CLASS A CY 1. 800.00 800.00 570.401 MORTAR RUBBLE MASONRY CY 5.5 430.00 2,365.00 585.3 STONE FILL, CLASS C CY 50. 44.00 2,200.00 603.00218 18" R.C. PIPE, 2000D LF 100. 95.00 9,500.00 603.00224 24" R.C. PIPE, 2000D LF 10. 120.00 1,200.00 603.30115 15" R.C. END SECTIONS EA 1. 800.00 800.00 603.30118 18" R.C. END SECTIONS EA 3. 980.00 2,940.00 603.30124 24" R.C. END SECTIONS EA 2. 1,110.00 2,220.00 603.30130 30" R.C. END SECTIONS EA 1. 1,160.00 1,160.00 13336 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.34112 12" STEEL END SECTIONS EA 13. 150.00 1,950.00 603.34115 15" STEEL END SECTIONS EA 2. 190.00 380.00 603.44012 12" CORRUGATED POLYETHYLENE PIPE FOR SLOPE DRAIN LF 25. 23.00 575.00 603.83112 12" PLASTIC PIPE (CORR. INTERIOR) LF 1,000. 24.00 24,000.00 603.83115 15" PLASTIC PIPE (CORR. INTERIOR) LF 175. 28.00 4,900.00 604.0007 POLYETHYLENE LINER EA 35. 170.00 5,950.00 604.12 CATCH BASINS TYPE B U 3. 1,700.00 5,100.00 604.15 CATCH BASINS TYPE E U 15. 1,800.00 27,000.00 604.16 CATCH BASINS TYPE F U 5. 1,700.00 8,500.00 604.25 DROP INLETS TYPE E U 9. 1,100.00 9,900.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 25. 250.00 6,250.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 30. 250.00 7,500.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 5,800. 17.00 98,600.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 2,750. 22.00 60,500.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 1,100. 24.00 26,400.00 605.79 UNDERDRAIN FLUSHING BASINS EA 7. 500.00 3,500.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 450. 10.50 4,725.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 35. 54.00 1,890.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 35. 11.00 385.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 450. 23.00 10,350.00 606.14533 BEAM GUARDRAIL (TERM. UNIT SPECIAL 50 FT.) U 5. 2,500.00 12,500.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 650.00 650.00 609.5 RESET GRANITE CURB LF 1,800. 10.00 18,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 150. 3.50 525.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 5. 160.00 800.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 87.00 174.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 125,000.00 125,000.00 13336 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 618.7 FLAGGERS HR 6,000. 21.00 126,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 145,000.00 145,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 7,800.00 15,600.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 320.00 1,920.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 75. 5.40 405.00 621.31 SINGLE DELINEATOR WITH POST EA 400. 32.00 12,800.00 622.1 STEEL WITNESS MARKERS EA 5. 27.00 135.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,400. 2.20 3,080.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 300,000. .13 39,000.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 400. 1.60 640.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 700. 1.40 980.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 400. 2.20 880.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 800. 6.80 5,440.00 641. LOAM CY 700. 45.00 31,500.00 645.3 EROSION STONE TON 350. 37.00 12,950.00 645.531 SILT FENCE LF 1,500. 3.00 4,500.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 5,000.00 5,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 50. 150.00 7,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 2.5 1,410.00 3,525.00 647.1 HUMUS CY 525. 34.00 17,850.00 692. MOBILIZATION U 1. 145,000.00 145,000.00 698.13 FIELD OFFICE TYPE C MON 6. 3,000.00 18,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 1008.14 ALTERATIONS AND ADDITIONS AS NEEDED- SPECIAL GUARDRAIL PLATFORMS $ 1. 5,000.00 5,000.00 1008.31 ALTERATIONS AND ADDITIONS AS NEEDED - DRAINAGE ADJUSTMENTS $ 1. 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 13336 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 62,400.00 62,400.00 $2,970,194.00