THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: CONWAY STP-TE-X-000S(322), 13078 AND CONWAY 14098 COUNTY AND CODE: CARROLL 003 DATE BIDS OPEN: MAY 26, 2005 SCOPE OF WORK: ROADWAY RECONSTRUCTION AND RIVER BANK STABILIZATION LOCATION: RIVER ROAD AND THE EAST BANK OF THE SACO RIVER COMPLETION DATE: JUNE 2, 2006 A R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 749,157.85 B ALVIN J COLEMAN & SON, INC. 9 NH RT. 113, CONWAY, NH 03818 $ 813,892.62 C NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 819,102.20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .08 100,000.00 8,000.00 25,000.00 2,000.00 55,000.00 4,400.00 201.22 REMOVING LARGE TREES EA 1. 700.00 700.00 750.00 750.00 900.00 900.00 202.701 REMOVAL OF GUARDRAIL LM 100. 7.00 700.00 16.82 1,682.00 7.00 700.00 203.1 COMMON EXCAVATION M3 3,050. 8.80 26,840.00 14.00 42,700.00 15.00 45,750.00 203.2 ROCK EXCAVATION M3 45. 40.00 1,800.00 50.00 2,250.00 45.00 2,025.00 203.6 EMBANKMENT-IN-PLACE (F) M3 1,150. 6.00 6,900.00 7.00 8,050.00 7.50 8,625.00 203.71 REHANDLING EXCAVATED MATERIAL M3 260. 20.00 5,200.00 10.00 2,600.00 10.00 2,600.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 50. 35.00 1,750.00 60.00 3,000.00 20.00 1,000.00 206.2 ROCK STRUCTURE EXCAVATION M3 2.5 40.00 100.00 100.00 250.00 125.00 312.50 207.3 UNCLASSIFIED CHANNEL EXCAVATION M3 1,940. 20.00 38,800.00 15.00 29,100.00 22.00 42,680.00 214. FINE GRADING U 1. 40,000.00 40,000.00 25,000.00 25,000.00 15,000.00 15,000.00 304.301 CRUSHED GRAVEL M3 2,200. 32.00 70,400.00 20.00 44,000.00 31.00 68,200.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 115. 35.00 4,025.00 25.00 2,875.00 33.00 3,795.00 403.11052 HOT BITUMINOUS PAVEMENT, MECHINE METHOD (SUPER PAVE) (QC/QA) T 2,325. 54.00 125,550.00 58.80 136,710.00 57.00 132,525.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 40. 85.00 3,400.00 110.00 4,400.00 110.00 4,400.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD T 265. 75.00 19,875.00 79.00 20,935.00 80.00 21,200.00 417. COLD PLANING BITUMINOUS SURFACES (F) M2 3,575. 4.75 16,981.25 12.00 42,900.00 5.00 17,875.00 570.401 MORTAR RUBBLE MASONRY M3 2.9 400.00 1,160.00 375.00 1,087.50 525.00 1,522.50 587.1 KEYED STONE FILL M3 1,020. 45.00 45,900.00 35.00 35,700.00 66.00 67,320.00 13078 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 593.4112 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN FILTER CATEGORY 2 M2 950. 4.90 4,655.00 4.00 3,800.00 5.00 4,750.00 603.00208 750 MM R.C. PIPE, CLASS III LM 3.8 270.00 1,026.00 200.00 760.00 330.00 1,254.00 603.34104 375 MM STEEL END SECTION EA 1. 150.00 150.00 200.00 200.00 150.00 150.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 110. 120.00 13,200.00 75.00 8,250.00 100.00 11,000.00 604.0007 POLYETHYLENE LINER EA 2. 230.00 460.00 175.00 350.00 150.00 300.00 604.12 CATCH BASINS TYPE B U 2. 1,400.00 2,800.00 1,400.00 2,800.00 1,750.00 3,500.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 254.6 66.00 16,803.60 68.20 17,363.72 70.00 17,822.00 606.14031 BEAM GUARDRAIL (THRIE BEAM) INCLUDING TRANSITIONAL SECTIONS U 1. 3,200.00 3,200.00 4,246.00 4,246.00 3,300.00 3,300.00 606.14032 BEAM GUARDRAIL (THRIE BEAM) INCL. TRANSITIONAL SECTIONS AND CONNECTOR U 1. 2,500.00 2,500.00 3,355.00 3,355.00 2,600.00 2,600.00 606.14531 BEAM GUARDRAIL (TERM. UNIT SPECIAL, 7.62M) U 15. 1,850.00 27,750.00 2,725.00 40,875.00 2,000.00 30,000.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 25. 21.00 525.00 19.00 475.00 20.00 500.00 609.2115 STRAIGHT GRANITE SLOPE CURB 150 MM HIGH LM 120. 45.00 5,400.00 62.00 7,440.00 48.00 5,760.00 609.5 RESET GRANITE CURB LM 23. 30.00 690.00 34.50 793.50 33.00 759.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 3. 150.00 450.00 200.00 600.00 90.00 270.00 615.02 TRAFFIC SIGN TYPE B (F) M2 1.08 1,000.00 1,080.00 840.00 907.20 800.00 864.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) M2 4.41 1,000.00 4,410.00 1,155.00 5,093.55 1,100.00 4,851.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 2. 500.00 1,000.00 367.00 734.00 350.00 700.00 615.03 TRAFFIC SIGN TYPE C (F) M2 19.05 500.00 9,525.00 560.00 10,668.00 535.00 10,191.75 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 200.00 400.00 183.00 366.00 175.00 350.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 4.55 200.00 910.00 373.00 1,697.15 355.00 1,615.25 615.064 RELOCATING TRAFFIC SIGN TYPE CC U 1. 100.00 100.00 25.00 25.00 20.00 20.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 47,000.00 47,000.00 47,000.00 47,000.00 47,000.00 47,000.00 618.7 FLAGGERS HR 660. 18.00 11,880.00 18.50 12,210.00 25.00 16,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 30,000.00 30,000.00 25,000.00 25,000.00 25,000.00 25,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 35. 5.00 175.00 5.50 192.50 5.00 175.00 621.31 SINGLE DELINEATOR WITH POST EA 94. 30.00 2,820.00 29.00 2,726.00 33.00 3,102.00 622.1 STEEL WITNESS MARKERS EA 1. 25.00 25.00 29.00 29.00 28.00 28.00 622.2 CONCRETE BOUNDS EA 4. 300.00 1,200.00 190.00 760.00 300.00 1,200.00 624. RAILROAD PROTECTION U 1. 1,000.00 1,000.00 6,500.00 6,500.00 5,000.00 5,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 100. 6.50 650.00 12.00 1,200.00 4.00 400.00 13078 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 7,200. .66 4,752.00 .75 5,400.00 .70 5,040.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 12. 8.00 96.00 10.50 126.00 10.00 120.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 4.8 20.00 96.00 25.00 120.00 21.50 103.20 632.4145 RETROREFLECTIVE PREFORMED THERMOPLAS. PAVEMENT MARKING 450MM LINE LM 12. 65.00 780.00 90.00 1,080.00 85.00 1,020.00 641. LOAM M3 36. 31.00 1,116.00 20.00 720.00 45.00 1,620.00 645.0001 TURBIDITY BARRIER LM 75. 80.00 6,000.00 200.00 15,000.00 70.00 5,250.00 645.1510 BARK MULCH 100 MM DEEP M2 85. 1.00 85.00 10.50 892.50 10.00 850.00 645.531 SILT FENCE LM 260. 7.50 1,950.00 10.00 2,600.00 12.00 3,120.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,500.00 7,500.00 8,260.00 8,260.00 20,000.00 20,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 140. 85.00 11,900.00 105.00 14,700.00 100.00 14,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA .7 3,500.00 2,450.00 4,000.00 2,800.00 4,000.00 2,800.00 647.1 HUMUS M3 575. 21.00 12,075.00 16.00 9,200.00 17.00 9,775.00 670.95 TEMPORARY SAFETY FENCE LM 24. 8.00 192.00 12.00 288.00 13.00 312.00 692. MOBILIZATION U 1. 50,000.00 50,000.00 100,000.00 100,000.00 75,000.00 75,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.14 ALTERATIONS AND ADDITIONS AS NEEDED - SPECIAL TERMINAL PLATFORM $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 2,800.00 2,800.00 2,800.00 2,800.00 2,800.00 2,800.00 $749,157.85 $813,892.62 $819,102.20