THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HUDSON STP-X-000S(216), 12460 COUNTIES AND CODES: HILLSBOROUGH 011 DATE BIDS OPEN: OCTOBER 6, 2005 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH 102 (DERRY ROAD) COMPLETION DATE: MAY 23, 2008 A CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 2,556,550.00 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,884,511.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .37 15,000.00 5,550.00 45,000.00 16,650.00 201.21 REMOVING SMALL TREES EA 33. 300.00 9,900.00 500.00 16,500.00 201.22 REMOVING LARGE TREES EA 3. 500.00 1,500.00 700.00 2,100.00 201.4 REMOVING STUMPS EA 3. 200.00 600.00 400.00 1,200.00 201.870 TREE PRUNING UNDER 18" (450 MM) IN DIAMETER EA 3. 200.00 600.00 225.00 675.00 201.871 TREE PRUNING 18" TO 34" (450 MM TO 850) IN DIAMETER EA 4. 450.00 1,800.00 225.00 900.00 201.872 TREE PRUNING OVER 34" (850 MM) IN DIAMETER EA 1. 500.00 500.00 225.00 225.00 202.2 DEMOLISHING BUILDINGS U 1. 10,000.00 10,000.00 25,000.00 25,000.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 125. 30.00 3,750.00 54.00 6,750.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 25. 250.00 6,250.00 400.00 10,000.00 203.1 COMMON EXCAVATION M3 13,700. 13.00 178,100.00 13.65 187,005.00 203.2 ROCK EXCAVATION M3 65. 90.00 5,850.00 45.00 2,925.00 203.6 EMBANKMENT-IN-PLACE (F) M3 2,400. 3.00 7,200.00 13.65 32,760.00 206.1 COMMON STRUCTURE EXCAVATION M3 400. 20.00 8,000.00 14.00 5,600.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 200. 30.00 6,000.00 40.00 8,000.00 206.2 ROCK STRUCTURE EXCAVATION M3 90. 90.00 8,100.00 75.00 6,750.00 209.4 GRANULAR BACKFILL (GRAV) M3 265. 32.00 8,480.00 36.00 9,540.00 211.11 VIBRATION MONITORING SERVICES HR 50. 100.00 5,000.00 50.00 2,500.00 214. FINE GRADING U 1. 55,000.00 55,000.00 126,000.00 126,000.00 304.1 SAND (F) M3 3,400. 16.00 54,400.00 19.50 66,300.00 304.2 GRAVEL (F) M3 3,300. 24.00 79,200.00 25.00 82,500.00 304.3 CRUSHED GRAVEL (F) M3 3,600. 25.00 90,000.00 27.00 97,200.00 12460 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING T 300. 30.00 9,000.00 30.00 9,000.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 700. 30.00 21,000.00 28.00 19,600.00 403.11052 HOT BITUMINOUS PAVEMENT, MACH. METHOD (SUPERPAVE) (QC/QA TIER 2) T 5,070. 50.00 253,500.00 50.00 253,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 560. 90.00 50,400.00 90.00 50,400.00 403.99 TEMPORARY BITUMINOUS PAVEMENT T 1,350. 50.00 67,500.00 50.00 67,500.00 417. COLD PLANING BITUMINOUS SURFACES (F) M2 1,765. 6.00 10,590.00 6.00 10,590.00 570.4 MORTAR RUBBLE MASONRY (F) M3 5. 500.00 2,500.00 550.00 2,750.00 571.1 REPAIRING AND POINTING STONE MASONRY M2 102. 45.00 4,590.00 400.00 40,800.00 585.2 STONE FILL, CLASS B M3 20. 35.00 700.00 90.00 1,800.00 585.3 STONE FILL, CLASS C M3 25. 40.00 1,000.00 90.00 2,250.00 585.4 STONE FILL, CLASS D M3 35. 45.00 1,575.00 95.00 3,325.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN M2 300. 3.50 1,050.00 5.00 1,500.00 603.34109 900 MM STEEL END SECTION EA 1. 750.00 750.00 600.00 600.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 3. 150.00 450.00 110.00 330.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 280. 115.00 32,200.00 115.00 32,200.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 90. 125.00 11,250.00 125.00 11,250.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 85. 140.00 11,900.00 140.00 11,900.00 603.83208 750 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 270. 160.00 43,200.00 180.00 48,600.00 603.83209 900 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 425. 200.00 85,000.00 200.00 85,000.00 604.0007 POLYETHYLENE LINER EA 35. 125.00 4,375.00 275.00 9,625.00 604.12 CATCH BASINS TYPE B U 21. 1,700.00 35,700.00 1,950.00 40,950.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 6. 2,500.00 15,000.00 2,750.00 16,500.00 604.1218 CATCH BASINS TYPE B, 1.8 M DIA U 1. 3,500.00 3,500.00 3,200.00 3,200.00 604.15 CATCH BASINS TYPE E U 4. 1,800.00 7,200.00 2,050.00 8,200.00 604.1515 CATCH BASINS TYPE E, 1.5 M DIA U 2. 2,500.00 5,000.00 2,850.00 5,700.00 604.16 CATCH BASINS TYPE F U 3. 1,800.00 5,400.00 2,050.00 6,150.00 604.1912 CATCH BASIN WITH, MANHOLE COVER AND FRAME, 1.2 M DIA EA 5. 2,000.00 10,000.00 1,900.00 9,500.00 604.1915 CATCH BASIN WITH, MANHOLE COVER AND FRAME, 1.5 M DIA EA 13. 2,250.00 29,250.00 2,700.00 35,100.00 12460 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.242 DROP INLETS TYPE D-B U 9. 1,200.00 10,800.00 1,050.00 9,450.00 604.29 SPECIAL DROP INLETS U 3. 1,500.00 4,500.00 1,350.00 4,050.00 604.32 DRAINAGE MANHOLES U 13. 1,800.00 23,400.00 1,900.00 24,700.00 604.394 SPECIAL OUTLET STRUCTURE U 1. 6,000.00 6,000.00 4,000.00 4,000.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 5. 300.00 1,500.00 325.00 1,625.00 604.52 RECONSTRUCT DRAINAGE MANHOLE LM 2. 700.00 1,400.00 700.00 1,400.00 604.55 ADJUSTING MANHOLE COVERS AND FRAMES EA 4. 350.00 1,400.00 325.00 1,300.00 605.510 100 MM PERF. CORR. POLYETHYL. PI[PE UND. LM 60. 60.00 3,600.00 60.00 3,600.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 215. 65.00 13,975.00 70.00 15,050.00 605.538 375 MM PERF. CORR. POLYETHYL. PIPE UND. LM 150. 90.00 13,500.00 110.00 16,500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 1. 600.00 600.00 525.00 525.00 606.6201 RAMP HANDRAIL, STEEL LM 3. 250.00 750.00 500.00 1,500.00 607.54212 4.2 STEEL GATE WITH STOP POSTS, 1.2 HIGH U 1. 1,000.00 1,000.00 3,000.00 3,000.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 1,820. 15.00 27,300.00 15.00 27,300.00 608.210 100 MM CONCRETE SIDEWALK (F) M2 81. 42.00 3,402.00 38.00 3,078.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON M2 10. 400.00 4,000.00 300.00 3,000.00 609.01 STRAIGHT GRANITE CURB LM 1,450. 48.00 69,600.00 47.00 68,150.00 609.02 CURVED GRANITE CURB LM 10. 80.00 800.00 73.00 730.00 609.093 SPECIAL GRANITE CURB 0-300 MM REVEAL LM 6. 148.00 888.00 82.00 492.00 609.094 SPECIAL GRANITE CURB 300 - 450 MM REVEAL LM 6. 230.00 1,380.00 185.00 1,110.00 609.095 SPECIAL GRANITE CURB 450 - 600 MM REVEAL LM 125. 380.00 47,500.00 215.00 26,875.00 609.21 STRAIGHT GRANITE SLOPE CURB LM 15. 36.00 540.00 33.00 495.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 45. 12.00 540.00 12.15 546.75 611.7 150 MM WATER MAIN- STORMWATER BYPASS U 1. 20,000.00 20,000.00 10,000.00 10,000.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 3. 2,000.00 6,000.00 1,600.00 4,800.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 21. 150.00 3,150.00 175.00 3,675.00 611.951 WATER MAIN INSULATION M2 30. 25.00 750.00 25.00 750.00 613.46 STORMWATER TREATMENT SYSTEM (LEVEL 6) U 1. 105,000.00 105,000.00 35,000.00 35,000.00 615.03 TRAFFIC SIGN TYPE C (F) M2 5. 595.00 2,975.00 500.00 2,500.00 12460 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.033 REMOVING TRAFFIC SIGN, TYPE C U 9. 25.00 225.00 45.00 405.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 300.00 300.00 350.00 350.00 618.6 UNIFORMED OFFICERS $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 618.7 FLAGGERS HR 1,500. 20.00 30,000.00 26.00 39,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 175,000.00 175,000.00 168,000.00 168,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 30. 500.00 15,000.00 750.00 22,500.00 622.4 STONE BOUNDS EA 26. 350.00 9,100.00 275.00 7,150.00 628.2 SAWED BITUMINOUS PAVEMENT LM 460. 6.50 2,990.00 6.50 2,990.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 18,000. .45 8,100.00 .40 7,200.00 632.3115 RETROREFLECT. THERMOPLAS. PAVE. MARKING 150 MM LIN LM 160. 4.00 640.00 4.00 640.00 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 45. 8.00 360.00 10.00 450.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD M2 20. 40.00 800.00 40.00 800.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 200. 2.50 500.00 2.00 400.00 634. BOULDERS FOR BARRICADE EA 2. 100.00 200.00 150.00 300.00 641. LOAM M3 410. 50.00 20,500.00 40.00 16,400.00 642. LIMESTONE T .1 400.00 40.00 350.00 35.00 643.12 FERTILIZER FOR INITIAL APPLICATION T .84 600.00 504.00 550.00 462.00 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 KG 23. 7.00 161.00 6.00 138.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) M2 50. 3.50 175.00 3.25 162.50 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) M2 275. 4.00 1,100.00 3.50 962.50 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 160. 4.00 640.00 3.50 560.00 645.3 EROSION STONE T 100. 30.00 3,000.00 60.00 6,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 17. 15.00 255.00 5.00 85.00 645.531 SILT FENCE LM 700. 10.00 7,000.00 8.60 6,020.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 100. 100.00 10,000.00 65.00 6,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA .75 4,000.00 3,000.00 3,800.00 2,850.00 647.1 HUMUS M3 320. 30.00 9,600.00 44.00 14,080.00 12460 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 648. SOD M2 220. 10.00 2,200.00 8.50 1,870.00 670.046 CONSTRUCT AND REMOVE TEMPORARY WIDENINGS U 1. 65,000.00 65,000.00 175,000.00 175,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 6. 200.00 1,200.00 200.00 1,200.00 670.95 TEMPORARY SAFETY FENCE LM 950. 25.00 23,750.00 5.00 4,750.00 692. MOBILIZATION U 1. 183,000.00 183,000.00 295,000.00 295,000.00 698.13 FIELD OFFICE TYPE C MON 27. 2,000.00 54,000.00 1,650.00 44,550.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1009.4 BUILDING ASBESTOS ABATEMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 5,000.00 5,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 5,100.00 5,100.00 5,100.00 5,100.00 $2,556,550.00 $2,884,511.75