THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ALLENSTOWN-PEMBROKE BRF-X-0171(020), 12361 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: AUGUST 24, 2005 SCOPE OF WORK: BRIDGE REPLACEMENT AND ROADWAY WORK LOCATION: US ROUTE 3 NORTH OF THE INTERSECTION OF NH ROUTE 28 IN ALLENSTOWN COMPLETION DATE: OCTOBER 5, 2007 A R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $11,352,639.75 B BECK & BELLUCCI INC P O BOX 429, FRANKLIN NH 03235 $11,963,518.89 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $11,970,361.45 D REED & REED, INC PO BOX 370, WOOLWICH, ME 04579 $12,201,169.95 E THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $12,957,360.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .8 30,000.00 24,000.00 14,463.60 11,570.88 14,000.00 11,200.00 201.21 REMOVING SMALL TREES EA 11. 325.00 3,575.00 280.50 3,085.50 275.00 3,025.00 202.101 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 1,000.00 1,000.00 25,500.00 25,500.00 25,000.00 25,000.00 202.102 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 1,000.00 1,000.00 1,836.00 1,836.00 1,800.00 1,800.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 600. 43.00 25,800.00 38.76 23,256.00 38.00 22,800.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 17. 250.00 4,250.00 326.40 5,548.80 320.00 5,440.00 202.7 REMOVAL OF GUARDRAIL (F) LM 910. 6.00 5,460.00 9.49 8,635.90 6.00 5,460.00 203.1 COMMON EXCAVATION M3 28,500. 11.00 313,500.00 5.97 170,145.00 5.85 166,725.00 203.2 ROCK EXCAVATION M3 1,350. 45.00 60,750.00 55.95 75,532.50 54.85 74,047.50 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 8. 625.00 5,000.00 1,632.00 13,056.00 1,600.00 12,800.00 203.6 EMBANKMENT-IN-PLACE (F) M3 5,600. 12.50 70,000.00 2.75 15,400.00 2.70 15,120.00 203.62 MODIFIED EMBANKMENT-IN- PLACE (F) M3 11,400. 12.50 142,500.00 17.60 200,640.00 17.25 196,650.00 203.81 PRESPLITTING HOLES LM 350. 24.00 8,400.00 27.80 9,730.00 27.25 9,537.50 206.1 COMMON STRUCTURE EXCAVATION M3 900. 10.00 9,000.00 14.28 12,852.00 14.00 12,600.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 100. 33.00 3,300.00 27.54 2,754.00 27.00 2,700.00 12361 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 206.2 ROCK STRUCTURE EXCAVATION M3 420. 105.00 44,100.00 92.82 38,984.40 91.00 38,220.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION M3 200. 12.50 2,500.00 29.58 5,916.00 29.00 5,800.00 209.1 GRANULAR BACKFILL M3 310. 24.00 7,440.00 64.77 20,078.70 63.50 19,685.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) M3 3,450. 31.00 106,950.00 22.44 77,418.00 22.00 75,900.00 209.3 GRANULAR BACKFILL (SAND) M3 42. 29.00 1,218.00 44.37 1,863.54 43.50 1,827.00 211.11 VIBRATION MONITORING SERVICES HR 40. 80.00 3,200.00 75.00 3,000.00 85.00 3,400.00 214. FINE GRADING U 1. 70,000.00 70,000.00 117,020.00 117,020.00 115,000.00 115,000.00 214.3 FINE GRADING EARTH BERMS IN ROCK CUT LM 75. 12.60 945.00 39.70 2,977.50 39.00 2,925.00 304.1 SAND (F) M3 5,100. 14.00 71,400.00 11.93 60,843.00 11.70 59,670.00 304.2 GRAVEL (F) M3 6,725. 18.25 122,731.25 17.34 116,611.50 17.00 114,325.00 304.3 CRUSHED GRAVEL (F) M3 7,950. 25.50 202,725.00 25.50 202,725.00 25.00 198,750.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 600. 28.00 16,800.00 34.68 20,808.00 34.00 20,400.00 403.11052 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPER- PAVE) (QC/QA TIER 2) T 8,300. 45.00 373,500.00 46.41 385,203.00 55.00 456,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 550. 95.00 52,250.00 93.00 51,150.00 110.00 60,500.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 25 MM BASE COURSE (F) T 144. 95.00 13,680.00 93.00 13,392.00 71.20 10,252.80 403.99 TEMPORARY BITUMINOUS PAVEMENT T 325. 55.00 17,875.00 84.00 27,300.00 82.25 26,731.25 417. COLD PLANING BITUMINOUS SURFACES (F) M2 180. 75.00 13,500.00 24.50 4,410.00 24.00 4,320.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 150,000.00 150,000.00 25,000.00 25,000.00 150,000.00 150,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 147,000.00 147,000.00 166,000.00 166,000.00 100,000.00 100,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 330,000.00 330,000.00 260,500.00 260,500.00 200,000.00 200,000.00 503.201 COFFERDAMS U 1. 120,000.00 120,000.00 110,000.00 110,000.00 200,000.00 200,000.00 503.202 COFFERDAMS U 1. 98,000.00 98,000.00 103,000.00 103,000.00 150,000.00 150,000.00 503.203 COFFERDAMS U 1. 81,000.00 81,000.00 103,000.00 103,000.00 150,000.00 150,000.00 503.204 COFFERDAMS U 1. 55,000.00 55,000.00 53,000.00 53,000.00 75,000.00 75,000.00 504.1 COMMON BRIDGE EXCAVATION (F) M3 4,000. 16.00 64,000.00 12.05 48,200.00 11.80 47,200.00 504.2 ROCK BRIDGE EXCAVATION M3 300. 75.00 22,500.00 87.05 26,115.00 85.35 25,605.00 508. STRUCTURAL FILL M3 1,065. 34.50 36,742.50 42.33 45,081.45 41.50 44,197.50 520.012 CONCRETE CLASS AA (42 MPA) (F) M3 101. 430.00 43,430.00 785.00 79,285.00 700.00 70,700.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) M3 115. 115.00 13,225.00 350.00 40,250.00 375.00 43,125.00 520.1 CONCRETE CLASS A M3 7. 1,500.00 10,500.00 790.00 5,530.00 1,000.00 7,000.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 611. 540.00 329,940.00 625.00 381,875.00 625.00 381,875.00 12361 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) M3 504. 285.00 143,640.00 295.00 148,680.00 350.00 176,400.00 520.31 RUSTIFICATION FOR CONCRETE (F) M2 420. 35.00 14,700.00 36.00 15,120.00 5.00 2,100.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL M3 391. 160.00 62,560.00 236.00 92,276.00 200.00 78,200.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) M3 403. 1,050.00 423,150.00 917.00 369,551.00 750.00 302,250.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION) (F M3 335. 900.00 301,500.00 720.00 241,200.00 750.00 251,250.00 534.3 WATER REPELLENT (SILANE- SILOXANE) L 591. 12.00 7,092.00 13.20 7,801.20 10.00 5,910.00 536.11 EPOXY COATING FOR CONCRETE (F) M2 117. 85.00 9,945.00 90.00 10,530.00 110.00 12,870.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 84. 36.00 3,024.00 42.00 3,528.00 60.00 5,040.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH MACHINE METHOD (F) M2 2,359. 20.00 47,180.00 19.60 46,236.40 25.00 58,975.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LM 41. 16.00 656.00 15.00 615.00 15.00 615.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LM 19. 18.00 342.00 16.50 313.50 15.00 285.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LM 40. 23.00 920.00 23.00 920.00 25.00 1,000.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LM 41. 20.00 820.00 20.00 820.00 25.00 1,025.00 544. REINFORCING STEEL (F) KG 52,466. 1.95 102,308.70 1.67 87,618.22 2.00 104,932.00 544.1 REINFORCING STEEL (ROADWAY) KG 40. 3.00 120.00 4.40 176.00 15.00 600.00 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 105,659. 2.00 211,318.00 1.87 197,582.33 2.20 232,449.80 547. SHEAR CONNECTORS (F) EA 18,669. 2.20 41,071.80 2.25 42,005.25 2.50 46,672.50 550.101 STRUCTURAL STEEL (F) KG 227,250. 3.20 727,200.00 3.67 834,007.50 4.00 909,000.00 550.102 STRUCTURAL STEEL (F) KG 77,500. 5.50 426,250.00 7.37 571,175.00 8.00 620,000.00 550.103 STRUCTURAL STEEL (F) KG 470,000. 4.60 2,162,000.00 5.41 2,542,700.00 5.50 2,585,000.00 550.2 BRIDGE SHOES (F) EA 14. 985.00 13,790.00 1,200.00 16,800.00 1,500.00 21,000.00 550.210 BRIDGE SHOES (F) EA 4. 9,000.00 36,000.00 8,700.00 34,800.00 10,000.00 40,000.00 550.3 STEEL BOLLARD (REMOVABLE) EA 1. 2,000.00 2,000.00 1,500.00 1,500.00 500.00 500.00 559.5 SILICONE JOINT SEALANT (F LM 7. 30.00 210.00 33.00 231.00 35.00 245.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LM 11.7 1,500.00 17,550.00 1,406.00 16,450.20 1,500.00 17,550.00 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LM 28.8 3,400.00 97,920.00 3,800.00 109,440.00 4,000.00 115,200.00 563.22 BRIDGE RAIL T2 (F) LM 57.6 300.00 17,280.00 283.00 16,300.80 300.00 17,280.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LM 267.5 375.00 100,312.50 365.00 97,637.50 400.00 107,000.00 563.739 BRIDGE RAIL F (3-BAR) (ANODIZED) (F) LM 104. 650.00 67,600.00 615.00 63,960.00 500.00 52,000.00 564. BRIDGE LIGHTING SYSTEM U 1. 10,000.00 10,000.00 17,325.00 17,325.00 7,000.00 7,000.00 12361 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 565.22 BRIDGE APPROACH RAIL T2 (F) LM 39. 400.00 15,600.00 394.00 15,366.00 400.00 15,600.00 565.729 BRIDGE APPROACH RAIL F (2-BAR) (ANODIZED) (F) LM 50.7 450.00 22,815.00 498.00 25,248.60 550.00 27,885.00 565.739 BRIDGE APPROACH RAIL F (3-BAR) (ANODIZED) (F) LM 63. 500.00 31,500.00 560.00 35,280.00 750.00 47,250.00 570.9 RESETTING MASONRY WALL M3 78. 350.00 27,300.00 415.00 32,370.00 250.00 19,500.00 585.2 STONE FILL, CLASS B M3 4,950. 38.00 188,100.00 52.00 257,400.00 51.25 253,687.50 585.21 STONE FILL, CLASS B (BRIDGE) M3 82. 40.00 3,280.00 67.00 5,494.00 65.00 5,330.00 585.3 STONE FILL, CLASS C M3 131. 37.00 4,847.00 50.00 6,550.00 49.15 6,438.65 585.4 STONE FILL, CLASS D M3 82. 40.00 3,280.00 44.00 3,608.00 42.65 3,497.30 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN M2 3,200. 3.85 12,320.00 5.30 16,960.00 5.20 16,640.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN M2 2,750. 4.75 13,062.50 5.30 14,575.00 5.20 14,300.00 595.4 SECONDARY GEOGRID M2 4,100. 7.00 28,700.00 10.70 43,870.00 10.50 43,050.00 603.00205 450 MM R.C. PIPE, CLASS III LM 8. 120.00 960.00 122.00 976.00 120.00 960.00 603.34104 375 MM STEEL END SECTION EA 6. 200.00 1,200.00 173.00 1,038.00 170.00 1,020.00 603.34105 450 MM STEEL END SECTION EA 3. 225.00 675.00 200.00 600.00 195.00 585.00 603.34106 600 MM STEEL END SECTION EA 2. 250.00 500.00 255.00 510.00 250.00 500.00 603.44005 450MM CORRUGATED PE PIPE FOR SLOPE DRAIN LM 14. 130.00 1,820.00 112.25 1,571.50 110.00 1,540.00 603.6 RELAYING 0-600 MM DRAINAG PIPE LM 10. 150.00 1,500.00 126.00 1,260.00 123.00 1,230.00 603.60008 RELAYING 750 MM DRAINAGE PIPE LM 5. 190.00 950.00 125.00 625.00 123.00 615.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 80. 100.00 8,000.00 75.00 6,000.00 73.00 5,840.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 775. 110.00 85,250.00 80.00 62,000.00 78.60 60,915.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 520. 125.00 65,000.00 92.00 47,840.00 90.00 46,800.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 55. 140.00 7,700.00 107.00 5,885.00 105.00 5,775.00 604.0007 POLYETHYLENE LINER EA 45. 225.00 10,125.00 255.00 11,475.00 250.00 11,250.00 604.12 CATCH BASINS TYPE B U 42. 1,650.00 69,300.00 2,193.00 92,106.00 2,150.00 90,300.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 2. 2,500.00 5,000.00 2,622.00 5,244.00 2,570.00 5,140.00 604.15 CATCH BASINS TYPE E U 10. 1,775.00 17,750.00 2,525.00 25,250.00 2,475.00 24,750.00 604.16 CATCH BASINS TYPE F U 9. 1,750.00 15,750.00 2,514.00 22,626.00 2,500.00 22,500.00 604.26 DROP INLETS TYPE F U 1. 1,250.00 1,250.00 2,754.00 2,754.00 2,700.00 2,700.00 604.32 DRAINAGE MANHOLES U 4. 1,650.00 6,600.00 2,448.00 9,792.00 2,400.00 9,600.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LM 2. 425.00 850.00 850.00 1,700.00 830.00 1,660.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 8. 300.00 2,400.00 209.00 1,672.00 205.00 1,640.00 604.52 RECONSTRUCTING DRAINAGE MANHOLES LM 1. 425.00 425.00 1,020.00 1,020.00 1,000.00 1,000.00 12361 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.55 ADJUSTING MANHOLE COVERS AND FRAMES EA 25. 300.00 7,500.00 209.00 5,225.00 205.00 5,125.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 775. 60.00 46,500.00 66.30 51,382.50 65.00 50,375.00 605.530 300 MM PERF. CORR. POLYETHYL. PIPE UND. LM 170. 85.00 14,450.00 76.50 13,005.00 75.00 12,750.00 605.79 UNDERDRAIN FLUSHING BASINS EA 4. 500.00 2,000.00 607.00 2,428.00 600.00 2,400.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 823. 50.00 41,150.00 51.00 41,973.00 58.00 47,734.00 606.1455 BEAM GUARDRAIL (TERMINAL UNIT EAGRT, 25 FT.(7.6M) U 8. 2,000.00 16,000.00 2,040.00 16,320.00 2,000.00 16,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 180. 100.00 18,000.00 80.00 14,400.00 50.00 9,000.00 606.5616 WOOD GUARDRAIL LM 35. 100.00 3,500.00 127.50 4,462.50 65.00 2,275.00 606.931 TEMP. BEAM GUARDRAIL (METAL POSTS) LM 620. 40.00 24,800.00 50.00 31,000.00 38.00 23,560.00 606.94531 TEMP. BEAM GUARDRAIL (TERMINAL UNIT TYPE SPECIAL) (7.62M) U 3. 1,850.00 5,550.00 1,836.00 5,508.00 2,000.00 6,000.00 607.199 TEMP. WOVEN WIRE FENCE LM 140. 25.00 3,500.00 32.80 4,592.00 32.00 4,480.00 607.315 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRI 1.5 METERS HIGH LM 130. 52.00 6,760.00 74.50 9,685.00 59.00 7,670.00 607.415 POST ASSEMBLIES FOR CHAIN LINK FENCE, 1.5 METERS HIGH EA 5. 125.00 625.00 195.00 975.00 264.00 1,320.00 607.4199 TEMP. POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 2. 55.00 110.00 47.00 94.00 234.00 468.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 1,130. 16.50 18,645.00 14.00 15,820.00 14.50 16,385.00 608.210 100 MM CONCRETE SIDEWALK (F) M2 90. 41.00 3,690.00 40.00 3,600.00 45.00 4,050.00 608.215 150 MM CONCRETE SIDEWALK (F) M2 405. 48.00 19,440.00 43.00 17,415.00 50.00 20,250.00 608.53 DETECTABLE WARNING PANELS (SIDEWALK RAMPS) (CAST IRON) M2 17. 350.00 5,950.00 890.00 15,130.00 600.00 10,200.00 609.01 STRAIGHT GRANITE CURB LM 1,000. 45.00 45,000.00 48.50 48,500.00 60.00 60,000.00 609.02 CURVED GRANITE CURB LM 125. 72.00 9,000.00 78.65 9,831.25 90.00 11,250.00 609.2115 STRAIGHT GRANITE SLOPE CURB 150 MM HIGH LM 75. 40.00 3,000.00 42.00 3,150.00 55.00 4,125.00 609.3 STRAIGHT GRANITE CURB (BRIDGE) LM 422. 92.00 38,824.00 92.00 38,824.00 100.00 42,200.00 609.5 RESET GRANITE CURB LM 105. 16.00 1,680.00 18.25 1,916.25 30.00 3,150.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 925. 11.50 10,637.50 10.50 9,712.50 11.70 10,822.50 609.8111 BITUMINOUS CURB, TYPE CAPE COD (100 MM REVEAL) LM 55. 11.50 632.50 12.00 660.00 11.70 643.50 12361 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.901 STRAIGHT GRANITE CURB (300MM - 450MM REVEAL) LM 8. 200.00 1,600.00 300.00 2,400.00 100.00 800.00 611.02030 300 MM WATER MAIN BRIDGE CROSSING PIPE LM 54. 725.00 39,150.00 867.00 46,818.00 850.00 45,900.00 611.05215 150 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 18. 200.00 3,600.00 112.00 2,016.00 110.00 1,980.00 611.05230 300 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 223. 235.00 52,405.00 122.50 27,317.50 120.00 26,760.00 611.50102 19 MM COPPER WATER PIPE LM 5. 200.00 1,000.00 65.00 325.00 63.00 315.00 611.51002 19 MM CORPORATION STOP EA 2. 180.00 360.00 185.00 370.00 180.00 360.00 611.52002 19 MM CURB STOP EA 2. 220.00 440.00 185.00 370.00 180.00 360.00 611.70015 150 MM FITTINGS EA 2. 650.00 1,300.00 400.00 800.00 390.00 780.00 611.70030 300 MM FITTINGS EA 24. 500.00 12,000.00 700.00 16,800.00 685.00 16,440.00 611.71015 150 MM GATE VALVES EA 2. 1,450.00 2,900.00 1,020.00 2,040.00 1,000.00 2,000.00 611.71030 300 MM GATE VALVES EA 12. 1,650.00 19,800.00 1,979.00 23,748.00 1,940.00 23,280.00 611.74 CHLORINE INJECTION TAP EA 2. 1,000.00 2,000.00 663.00 1,326.00 650.00 1,300.00 611.81 HYDRANTS EA 2. 2,500.00 5,000.00 3,060.00 6,120.00 3,000.00 6,000.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 1,350.00 1,350.00 3,165.00 3,165.00 3,100.00 3,100.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 225.00 3,375.00 100.00 1,500.00 96.00 1,440.00 611.951 WATER MAIN INSULATION M2 102. 21.00 2,142.00 23.00 2,346.00 22.70 2,315.40 611.99 300 MM HDPE TEMPORARY WATER PIPE LM 87. 200.00 17,400.00 280.50 24,403.50 275.00 23,925.00 614.3081 75 MM STEEL CONDUIT LM 2.5 50.00 125.00 52.50 131.25 60.00 150.00 614.511 CONCRETE PULL BOX 350 MM EA 16. 275.00 4,400.00 278.00 4,448.00 300.00 4,800.00 614.512 CONCRETE PULL BOX 450 MM EA 2. 350.00 700.00 368.00 736.00 350.00 700.00 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 2. 300.00 600.00 315.00 630.00 300.00 600.00 614.70518 50 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 650. 10.00 6,500.00 9.83 6,389.50 30.00 19,500.00 614.70814 75 MM PVC PLASTIC CONDUIT SCHEDULE 40 LM 245. 25.00 6,125.00 25.50 6,247.50 30.00 7,350.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 165. 50.00 8,250.00 50.00 8,250.00 50.00 8,250.00 614.70828 75 MM 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LM 30. 55.00 1,650.00 55.00 1,650.00 70.00 2,100.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) M2 10.18 800.00 8,144.00 851.00 8,663.18 1,000.00 10,180.00 615.03 TRAFFIC SIGN TYPE C (F) M2 18.33 400.00 7,332.00 473.00 8,670.09 500.00 9,165.00 615.05 TRAFFIC SIGN TYPE BB (F) M2 .54 350.00 189.00 525.00 283.50 500.00 270.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 1.1 250.00 275.00 210.00 231.00 500.00 550.00 616.101 TRAFFIC SIGNALS U 1. 62,500.00 62,500.00 69,720.00 69,720.00 70,000.00 70,000.00 616.7 METER PEDESTAL U 1. 750.00 750.00 1,000.00 1,000.00 1,000.00 1,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 325,000.00 325,000.00 325,000.00 325,000.00 325,000.00 325,000.00 618.7 FLAGGERS HR 1,000. 12.00 12,000.00 26.25 26,250.00 20.00 20,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 85,000.00 85,000.00 121,013.00 121,013.00 120,000.00 120,000.00 12361 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 25,000.00 50,000.00 23,440.00 46,880.00 20,000.00 40,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 40. 4.00 160.00 5.10 204.00 4.00 160.00 621.31 SINGLE DELINEATOR WITH POST EA 135. 28.00 3,780.00 31.50 4,252.50 26.00 3,510.00 622.1 STEEL WITNESS MARKERS EA 40. 25.00 1,000.00 25.50 1,020.00 21.00 840.00 622.2 CONCRETE BOUNDS EA 11. 325.00 3,575.00 306.00 3,366.00 200.00 2,200.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 1. 500.00 500.00 1,000.00 1,000.00 1,000.00 1,000.00 625.551 ORNAMENTAL LIGHT W/ BRACKET ARM, 14'-0" MOUNTING HEIGHT EA 4. 3,500.00 14,000.00 3,413.00 13,652.00 3,000.00 12,000.00 625.552 ORNAMENTAL LIGHT POLE W/ LUMINAIRE, 5.5M HIGH U 1. 4,500.00 4,500.00 5,880.00 5,880.00 5,000.00 5,000.00 628.2 SAWED BITUMINOUS PAVEMENT LM 570. 6.50 3,705.00 5.61 3,197.70 5.50 3,135.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LM 34. 75.00 2,550.00 49.00 1,666.00 15.00 510.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 26,500. .40 10,600.00 .44 11,660.00 .50 13,250.00 632.0115 RETROREFLECTIVE PAINT PAVEMENT MARKING, 150 MM LINE LM 75. .50 37.50 .63 47.25 .85 63.75 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 120. 5.00 600.00 3.15 378.00 4.25 510.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 65. 12.00 780.00 12.60 819.00 14.85 965.25 632.3115 RETROREFLECT. THERMOPLAS. PAVE. MARKING 150 MM LIN LM 75. 3.00 225.00 3.41 255.75 2.80 210.00 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 95. 8.00 760.00 8.40 798.00 20.00 1,900.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD M2 55. 50.00 2,750.00 78.75 4,331.25 46.00 2,530.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 425. 2.50 1,062.50 1.73 735.25 1.55 658.75 641. LOAM M3 85. 43.00 3,655.00 37.25 3,166.25 36.40 3,094.00 645.0001 TURBIDITY BARRIER LM 110. 135.00 14,850.00 69.00 7,590.00 82.00 9,020.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) M2 1,500. 2.00 3,000.00 2.55 3,825.00 2.00 3,000.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 1,515. 2.00 3,030.00 2.55 3,863.25 2.00 3,030.00 645.3 EROSION STONE T 500. 38.50 19,250.00 17.00 8,500.00 16.70 8,350.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 50. 2.00 100.00 2.35 117.50 2.00 100.00 12361 PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.531 SILT FENCE LM 3,500. 8.00 28,000.00 7.14 24,990.00 7.00 24,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,500.00 2,500.00 7,900.00 7,900.00 3,500.00 3,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 300. 50.00 15,000.00 65.00 19,500.00 50.00 15,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 1.5 3,000.00 4,500.00 4,182.00 6,273.00 3,500.00 5,250.00 646.312 TURF ESTABLISHMENT WITH MULCH TACKIFIERS, PARK SEED TYPE 15 M2 850. .45 382.50 .71 603.50 .60 510.00 647.1 HUMUS M3 1,200. 21.00 25,200.00 12.25 14,700.00 12.00 14,400.00 650.2 LANDSCAPING U 1. 70,000.00 70,000.00 78,540.00 78,540.00 70,000.00 70,000.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 35,000.00 35,000.00 14,515.00 14,515.00 15,000.00 15,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 30,000.00 30,000.00 18,160.00 18,160.00 20,000.00 20,000.00 670.047 REINFORCED SOIL SLOPE DETOUR (LEFT-IN-PLACE) U 1. 22,500.00 22,500.00 36,300.00 36,300.00 35,000.00 35,000.00 670.061 HISTORICAL BRIDGE PLAQUE U 2. 600.00 1,200.00 1,200.00 2,400.00 750.00 1,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 5. 225.00 1,125.00 160.00 800.00 150.00 750.00 670.95 TEMPORARY SAFETY FENCE LM 100. 8.00 800.00 16.00 1,600.00 16.50 1,650.00 692. MOBILIZATION U 1. 650,000.00 650,000.00 715,000.00 715,000.00 335,000.00 335,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 698.12 FIELD OFFICE TYPE B MON 30. 1,800.00 54,000.00 1,400.00 42,000.00 1,000.00 30,000.00 698.2 PHYSICAL TESTING LABORATORY MON 20. 1,000.00 20,000.00 525.00 10,500.00 250.00 5,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1008.8 ALTERATIONS & ADDITIONAL AS NEEDED (WINTER MAINTENANCE) $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1009.41 BUILDING ASBESTOS ABATEMENT $ 1. 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1010.20 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 $11,352,639.75 $11,963,518.89 $11,970,361.45 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ALLENSTOWN-PEMBROKE BRF-X-0171(020), 12361 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: AUGUST 24, 2005 SCOPE OF WORK: BRIDGE REPLACEMENT AND ROADWAY WORK LOCATION: US ROUTE 3 NORTH OF THE INTERSECTION OF NH ROUTE 28 IN ALLENSTOWN COMPLETION DATE: OCTOBER 5, 2007 A R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $11,352,639.75 B BECK & BELLUCCI INC P O BOX 429, FRANKLIN NH 03235 $11,963,518.89 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $11,970,361.45 D REED & REED, INC PO BOX 370, WOOLWICH, ME 04579 $12,201,169.95 E THE MIDDLESEX CORPORATION ONE SPECTACLE POND ROAD, LITTLETON, MA 01460 $12,957,360.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA .8 15,000.00 12,000.00 30,000.00 24,000.00 201.21 REMOVING SMALL TREES EA 11. 275.00 3,025.00 300.00 3,300.00 202.101 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 25,000.00 25,000.00 30,000.00 30,000.00 202.102 DEMOLISHING BUILDINGS SUBJECT TO PRIOR REMOVAL U 1. 1,800.00 1,800.00 2,000.00 2,000.00 202.41 REMOVAL OF EXISTING PIPE 0-600 MM DIA. LM 600. 38.00 22,800.00 30.00 18,000.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 17. 320.00 5,440.00 450.00 7,650.00 202.7 REMOVAL OF GUARDRAIL (F) LM 910. 10.00 9,100.00 6.40 5,824.00 203.1 COMMON EXCAVATION M3 28,500. 6.00 171,000.00 11.00 313,500.00 203.2 ROCK EXCAVATION M3 1,350. 55.00 74,250.00 55.00 74,250.00 203.5555 GUARDRAIL 7.6M EAGRT PLATFORM U 8. 1,600.00 12,800.00 500.00 4,000.00 203.6 EMBANKMENT-IN-PLACE (F) M3 5,600. 2.70 15,120.00 9.00 50,400.00 203.62 MODIFIED EMBANKMENT-IN- PLACE (F) M3 11,400. 17.25 196,650.00 18.00 205,200.00 203.81 PRESPLITTING HOLES LM 350. 28.00 9,800.00 60.00 21,000.00 206.1 COMMON STRUCTURE EXCAVATION M3 900. 14.00 12,600.00 10.00 9,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY M3 100. 27.00 2,700.00 90.00 9,000.00 12361 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 206.2 ROCK STRUCTURE EXCAVATION M3 420. 91.00 38,220.00 90.00 37,800.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION M3 200. 29.00 5,800.00 18.00 3,600.00 209.1 GRANULAR BACKFILL M3 310. 64.00 19,840.00 38.00 11,780.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) M3 3,450. 22.00 75,900.00 35.00 120,750.00 209.3 GRANULAR BACKFILL (SAND) M3 42. 44.00 1,848.00 40.00 1,680.00 211.11 VIBRATION MONITORING SERVICES HR 40. 69.00 2,760.00 80.00 3,200.00 214. FINE GRADING U 1. 115,000.00 115,000.00 90,000.00 90,000.00 214.3 FINE GRADING EARTH BERMS IN ROCK CUT LM 75. 39.00 2,925.00 12.00 900.00 304.1 SAND (F) M3 5,100. 12.00 61,200.00 22.00 112,200.00 304.2 GRAVEL (F) M3 6,725. 17.00 114,325.00 24.00 161,400.00 304.3 CRUSHED GRAVEL (F) M3 7,950. 25.00 198,750.00 26.00 206,700.00 304.35 CRUSHED GRAVEL FOR DRIVES M3 600. 34.00 20,400.00 45.00 27,000.00 403.11052 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPER- PAVE) (QC/QA TIER 2) T 8,300. 46.00 381,800.00 52.00 431,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 550. 92.00 50,600.00 92.00 50,600.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 25 MM BASE COURSE (F) T 144. 60.00 8,640.00 70.00 10,080.00 403.99 TEMPORARY BITUMINOUS PAVEMENT T 325. 65.00 21,125.00 85.00 27,625.00 417. COLD PLANING BITUMINOUS SURFACES (F) M2 180. 20.00 3,600.00 70.00 12,600.00 500.02 ACCESS FOR BRIDGE CONSTRUCTION U 1. 50,000.00 50,000.00 150,000.00 150,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 160,000.00 160,000.00 180,000.00 180,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 200,000.00 200,000.00 220,000.00 220,000.00 503.201 COFFERDAMS U 1. 185,000.00 185,000.00 200,000.00 200,000.00 503.202 COFFERDAMS U 1. 100,000.00 100,000.00 150,000.00 150,000.00 503.203 COFFERDAMS U 1. 90,000.00 90,000.00 140,000.00 140,000.00 503.204 COFFERDAMS U 1. 75,000.00 75,000.00 90,000.00 90,000.00 504.1 COMMON BRIDGE EXCAVATION (F) M3 4,000. 12.00 48,000.00 13.00 52,000.00 504.2 ROCK BRIDGE EXCAVATION M3 300. 86.00 25,800.00 120.00 36,000.00 508. STRUCTURAL FILL M3 1,065. 42.00 44,730.00 32.00 34,080.00 520.012 CONCRETE CLASS AA (42 MPA) (F) M3 101. 640.00 64,640.00 380.00 38,380.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) M3 115. 450.00 51,750.00 260.00 29,900.00 520.1 CONCRETE CLASS A M3 7. 1,500.00 10,500.00 900.00 6,300.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 611. 700.00 427,700.00 500.00 305,500.00 12361 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) M3 504. 360.00 181,440.00 280.00 141,120.00 520.31 RUSTIFICATION FOR CONCRETE (F) M2 420. 125.00 52,500.00 15.00 6,300.00 520.6 CONCRETE CLASS T, FOUNDATION SEAL M3 391. 220.00 86,020.00 220.00 86,020.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) M3 403. 1,000.00 403,000.00 960.00 386,880.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION) (F M3 335. 1,000.00 335,000.00 960.00 321,600.00 534.3 WATER REPELLENT (SILANE- SILOXANE) L 591. 15.00 8,865.00 20.00 11,820.00 536.11 EPOXY COATING FOR CONCRETE (F) M2 117. 90.00 10,530.00 90.00 10,530.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 84. 86.00 7,224.00 70.00 5,880.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH MACHINE METHOD (F) M2 2,359. 19.00 44,821.00 24.00 56,616.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LM 41. 14.00 574.00 30.00 1,230.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LM 19. 14.00 266.00 30.00 570.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LM 40. 25.00 1,000.00 30.00 1,200.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LM 41. 25.00 1,025.00 30.00 1,230.00 544. REINFORCING STEEL (F) KG 52,466. 1.75 91,815.50 2.00 104,932.00 544.1 REINFORCING STEEL (ROADWAY) KG 40. 3.00 120.00 4.00 160.00 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 105,659. 1.85 195,469.15 2.00 211,318.00 547. SHEAR CONNECTORS (F) EA 18,669. 2.00 37,338.00 3.00 56,007.00 550.101 STRUCTURAL STEEL (F) KG 227,250. 4.00 909,000.00 3.30 749,925.00 550.102 STRUCTURAL STEEL (F) KG 77,500. 8.00 620,000.00 5.80 449,500.00 550.103 STRUCTURAL STEEL (F) KG 470,000. 5.25 2,467,500.00 5.60 2,632,000.00 550.2 BRIDGE SHOES (F) EA 14. 1,900.00 26,600.00 1,600.00 22,400.00 550.210 BRIDGE SHOES (F) EA 4. 17,000.00 68,000.00 10,500.00 42,000.00 550.3 STEEL BOLLARD (REMOVABLE) EA 1. 1,500.00 1,500.00 1,200.00 1,200.00 559.5 SILICONE JOINT SEALANT (F LM 7. 10.00 70.00 20.00 140.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LM 11.7 2,400.00 28,080.00 1,600.00 18,720.00 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LM 28.8 4,000.00 115,200.00 4,000.00 115,200.00 563.22 BRIDGE RAIL T2 (F) LM 57.6 270.00 15,552.00 285.00 16,416.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LM 267.5 350.00 93,625.00 384.00 102,720.00 563.739 BRIDGE RAIL F (3-BAR) (ANODIZED) (F) LM 104. 600.00 62,400.00 590.00 61,360.00 564. BRIDGE LIGHTING SYSTEM U 1. 11,000.00 11,000.00 6,000.00 6,000.00 12361 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 565.22 BRIDGE APPROACH RAIL T2 (F) LM 39. 400.00 15,600.00 340.00 13,260.00 565.729 BRIDGE APPROACH RAIL F (2-BAR) (ANODIZED) (F) LM 50.7 500.00 25,350.00 450.00 22,815.00 565.739 BRIDGE APPROACH RAIL F (3-BAR) (ANODIZED) (F) LM 63. 550.00 34,650.00 500.00 31,500.00 570.9 RESETTING MASONRY WALL M3 78. 250.00 19,500.00 200.00 15,600.00 585.2 STONE FILL, CLASS B M3 4,950. 52.00 257,400.00 32.00 158,400.00 585.21 STONE FILL, CLASS B (BRIDGE) M3 82. 110.00 9,020.00 44.00 3,608.00 585.3 STONE FILL, CLASS C M3 131. 50.00 6,550.00 44.00 5,764.00 585.4 STONE FILL, CLASS D M3 82. 43.00 3,526.00 45.00 3,690.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN M2 3,200. 5.20 16,640.00 4.00 12,800.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN M2 2,750. 5.20 14,300.00 4.00 11,000.00 595.4 SECONDARY GEOGRID M2 4,100. 11.00 45,100.00 6.00 24,600.00 603.00205 450 MM R.C. PIPE, CLASS III LM 8. 120.00 960.00 120.00 960.00 603.34104 375 MM STEEL END SECTION EA 6. 170.00 1,020.00 300.00 1,800.00 603.34105 450 MM STEEL END SECTION EA 3. 200.00 600.00 320.00 960.00 603.34106 600 MM STEEL END SECTION EA 2. 250.00 500.00 350.00 700.00 603.44005 450MM CORRUGATED PE PIPE FOR SLOPE DRAIN LM 14. 110.00 1,540.00 170.00 2,380.00 603.6 RELAYING 0-600 MM DRAINAG PIPE LM 10. 125.00 1,250.00 150.00 1,500.00 603.60008 RELAYING 750 MM DRAINAGE PIPE LM 5. 125.00 625.00 130.00 650.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 80. 75.00 6,000.00 100.00 8,000.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 775. 80.00 62,000.00 104.00 80,600.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 520. 90.00 46,800.00 120.00 62,400.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 55. 105.00 5,775.00 200.00 11,000.00 604.0007 POLYETHYLENE LINER EA 45. 250.00 11,250.00 200.00 9,000.00 604.12 CATCH BASINS TYPE B U 42. 2,200.00 92,400.00 1,700.00 71,400.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 2. 2,600.00 5,200.00 2,000.00 4,000.00 604.15 CATCH BASINS TYPE E U 10. 2,500.00 25,000.00 1,900.00 19,000.00 604.16 CATCH BASINS TYPE F U 9. 2,500.00 22,500.00 1,900.00 17,100.00 604.26 DROP INLETS TYPE F U 1. 2,700.00 2,700.00 1,600.00 1,600.00 604.32 DRAINAGE MANHOLES U 4. 2,400.00 9,600.00 1,800.00 7,200.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LM 2. 830.00 1,660.00 850.00 1,700.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 8. 205.00 1,640.00 350.00 2,800.00 604.52 RECONSTRUCTING DRAINAGE MANHOLES LM 1. 1,000.00 1,000.00 900.00 900.00 12361 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.55 ADJUSTING MANHOLE COVERS AND FRAMES EA 25. 205.00 5,125.00 340.00 8,500.00 605.515 150 MM PERF. CORR. POLYETHYL. PIPE. UND. LM 775. 65.00 50,375.00 46.00 35,650.00 605.530 300 MM PERF. CORR. POLYETHYL. PIPE UND. LM 170. 75.00 12,750.00 60.00 10,200.00 605.79 UNDERDRAIN FLUSHING BASINS EA 4. 600.00 2,400.00 500.00 2,000.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 823. 50.00 41,150.00 58.00 47,734.00 606.1455 BEAM GUARDRAIL (TERMINAL UNIT EAGRT, 25 FT.(7.6M) U 8. 2,000.00 16,000.00 1,900.00 15,200.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LM 180. 80.00 14,400.00 65.00 11,700.00 606.5616 WOOD GUARDRAIL LM 35. 125.00 4,375.00 64.00 2,240.00 606.931 TEMP. BEAM GUARDRAIL (METAL POSTS) LM 620. 49.00 30,380.00 38.00 23,560.00 606.94531 TEMP. BEAM GUARDRAIL (TERMINAL UNIT TYPE SPECIAL) (7.62M) U 3. 1,800.00 5,400.00 1,900.00 5,700.00 607.199 TEMP. WOVEN WIRE FENCE LM 140. 32.00 4,480.00 32.00 4,480.00 607.315 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRI 1.5 METERS HIGH LM 130. 60.00 7,800.00 59.00 7,670.00 607.415 POST ASSEMBLIES FOR CHAIN LINK FENCE, 1.5 METERS HIGH EA 5. 264.00 1,320.00 270.00 1,350.00 607.4199 TEMP. POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 2. 234.00 468.00 240.00 480.00 608.105 50 MM BITUMINOUS SIDEWALK (F) M2 1,130. 12.00 13,560.00 16.00 18,080.00 608.210 100 MM CONCRETE SIDEWALK (F) M2 90. 60.00 5,400.00 34.00 3,060.00 608.215 150 MM CONCRETE SIDEWALK (F) M2 405. 45.00 18,225.00 42.00 17,010.00 608.53 DETECTABLE WARNING PANELS (SIDEWALK RAMPS) (CAST IRON) M2 17. 100.00 1,700.00 500.00 8,500.00 609.01 STRAIGHT GRANITE CURB LM 1,000. 55.00 55,000.00 52.00 52,000.00 609.02 CURVED GRANITE CURB LM 125. 82.00 10,250.00 90.00 11,250.00 609.2115 STRAIGHT GRANITE SLOPE CURB 150 MM HIGH LM 75. 50.00 3,750.00 52.00 3,900.00 609.3 STRAIGHT GRANITE CURB (BRIDGE) LM 422. 120.00 50,640.00 110.00 46,420.00 609.5 RESET GRANITE CURB LM 105. 25.00 2,625.00 28.00 2,940.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 925. 10.00 9,250.00 13.00 12,025.00 609.8111 BITUMINOUS CURB, TYPE CAPE COD (100 MM REVEAL) LM 55. 10.00 550.00 14.00 770.00 12361 PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.901 STRAIGHT GRANITE CURB (300MM - 450MM REVEAL) LM 8. 240.00 1,920.00 200.00 1,600.00 611.02030 300 MM WATER MAIN BRIDGE CROSSING PIPE LM 54. 900.00 48,600.00 520.00 28,080.00 611.05215 150 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 18. 110.00 1,980.00 200.00 3,600.00 611.05230 300 MM CEMENT LINED DUCT- ILE IRON WATER PIPE , CL.52 LM 223. 120.00 26,760.00 240.00 53,520.00 611.50102 19 MM COPPER WATER PIPE LM 5. 63.00 315.00 80.00 400.00 611.51002 19 MM CORPORATION STOP EA 2. 180.00 360.00 320.00 640.00 611.52002 19 MM CURB STOP EA 2. 180.00 360.00 300.00 600.00 611.70015 150 MM FITTINGS EA 2. 390.00 780.00 500.00 1,000.00 611.70030 300 MM FITTINGS EA 24. 685.00 16,440.00 700.00 16,800.00 611.71015 150 MM GATE VALVES EA 2. 1,000.00 2,000.00 1,000.00 2,000.00 611.71030 300 MM GATE VALVES EA 12. 1,940.00 23,280.00 1,900.00 22,800.00 611.74 CHLORINE INJECTION TAP EA 2. 650.00 1,300.00 150.00 300.00 611.81 HYDRANTS EA 2. 3,000.00 6,000.00 2,000.00 4,000.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 1. 3,100.00 3,100.00 900.00 900.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 96.00 1,440.00 110.00 1,650.00 611.951 WATER MAIN INSULATION M2 102. 23.00 2,346.00 25.00 2,550.00 611.99 300 MM HDPE TEMPORARY WATER PIPE LM 87. 275.00 23,925.00 400.00 34,800.00 614.3081 75 MM STEEL CONDUIT LM 2.5 56.00 140.00 60.00 150.00 614.511 CONCRETE PULL BOX 350 MM EA 16. 300.00 4,800.00 300.00 4,800.00 614.512 CONCRETE PULL BOX 450 MM EA 2. 350.00 700.00 350.00 700.00 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 2. 300.00 600.00 300.00 600.00 614.70518 50 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 650. 12.00 7,800.00 33.00 21,450.00 614.70814 75 MM PVC PLASTIC CONDUIT SCHEDULE 40 LM 245. 27.00 6,615.00 26.00 6,370.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 165. 50.00 8,250.00 74.00 12,210.00 614.70828 75 MM 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LM 30. 66.00 1,980.00 88.00 2,640.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) M2 10.18 710.00 7,227.80 700.00 7,126.00 615.03 TRAFFIC SIGN TYPE C (F) M2 18.33 400.00 7,332.00 400.00 7,332.00 615.05 TRAFFIC SIGN TYPE BB (F) M2 .54 225.00 121.50 200.00 108.00 615.06 TRAFFIC SIGN TYPE CC (F) M2 1.1 135.00 148.50 150.00 165.00 616.101 TRAFFIC SIGNALS U 1. 67,000.00 67,000.00 75,000.00 75,000.00 616.7 METER PEDESTAL U 1. 1,200.00 1,200.00 1,200.00 1,200.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 325,000.00 325,000.00 325,000.00 325,000.00 618.7 FLAGGERS HR 1,000. 25.60 25,600.00 20.00 20,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 154,000.00 154,000.00 12361 PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 23,000.00 46,000.00 38,000.00 76,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 40. 5.00 200.00 6.00 240.00 621.31 SINGLE DELINEATOR WITH POST EA 135. 30.00 4,050.00 24.00 3,240.00 622.1 STEEL WITNESS MARKERS EA 40. 25.00 1,000.00 24.00 960.00 622.2 CONCRETE BOUNDS EA 11. 300.00 3,300.00 350.00 3,850.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 1. 750.00 750.00 800.00 800.00 625.551 ORNAMENTAL LIGHT W/ BRACKET ARM, 14'-0" MOUNTING HEIGHT EA 4. 2,900.00 11,600.00 2,850.00 11,400.00 625.552 ORNAMENTAL LIGHT POLE W/ LUMINAIRE, 5.5M HIGH U 1. 5,200.00 5,200.00 5,200.00 5,200.00 628.2 SAWED BITUMINOUS PAVEMENT LM 570. 6.00 3,420.00 4.00 2,280.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LM 34. 10.00 340.00 50.00 1,700.00 632.0110 RETROREFLECTIVE PAINT PAVEMENT MARKING, 100 MM LINE LM 26,500. .42 11,130.00 .42 11,130.00 632.0115 RETROREFLECTIVE PAINT PAVEMENT MARKING, 150 MM LINE LM 75. .60 45.00 .60 45.00 632.0145 RETROREFLECTIVE PAINT PAVEMENT MARKING, 450 MM LINE LM 120. 3.00 360.00 3.00 360.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD M2 65. 12.00 780.00 12.00 780.00 632.3115 RETROREFLECT. THERMOPLAS. PAVE. MARKING 150 MM LIN LM 75. 3.25 243.75 3.40 255.00 632.3145 RETROREFLECT. THERMOPLAS. PAVE. MARKING 450 MM LIN LM 95. 8.00 760.00 8.00 760.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD M2 55. 75.00 4,125.00 76.00 4,180.00 632.9110 OBLITERATE PAVEMENT MARKING, 100 MM LINE LM 425. 1.65 701.25 1.80 765.00 641. LOAM M3 85. 37.00 3,145.00 54.00 4,590.00 645.0001 TURBIDITY BARRIER LM 110. 150.00 16,500.00 54.00 5,940.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) M2 1,500. 2.50 3,750.00 2.20 3,300.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 1,515. 2.50 3,787.50 3.00 4,545.00 645.3 EROSION STONE T 500. 17.00 8,500.00 38.00 19,000.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL KG 50. 2.30 115.00 4.00 200.00 12361 PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.531 SILT FENCE LM 3,500. 7.00 24,500.00 6.00 21,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,500.00 7,500.00 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROL HR 300. 60.00 18,000.00 50.00 15,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS HA 1.5 4,100.00 6,150.00 3,600.00 5,400.00 646.312 TURF ESTABLISHMENT WITH MULCH TACKIFIERS, PARK SEED TYPE 15 M2 850. .70 595.00 1.00 850.00 647.1 HUMUS M3 1,200. 12.00 14,400.00 23.00 27,600.00 650.2 LANDSCAPING U 1. 65,000.00 65,000.00 65,000.00 65,000.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 15,000.00 15,000.00 30,000.00 30,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 18,000.00 18,000.00 40,000.00 40,000.00 670.047 REINFORCED SOIL SLOPE DETOUR (LEFT-IN-PLACE) U 1. 36,000.00 36,000.00 30,000.00 30,000.00 670.061 HISTORICAL BRIDGE PLAQUE U 2. 10,000.00 20,000.00 1,200.00 2,400.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 5. 200.00 1,000.00 140.00 700.00 670.95 TEMPORARY SAFETY FENCE LM 100. 16.00 1,600.00 22.00 2,200.00 692. MOBILIZATION U 1. 600,000.00 600,000.00 1,140,000.00 1,140,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 698.12 FIELD OFFICE TYPE B MON 30. 800.00 24,000.00 2,400.00 72,000.00 698.2 PHYSICAL TESTING LABORATORY MON 20. 1,000.00 20,000.00 1,000.00 20,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 1008.8 ALTERATIONS & ADDITIONAL AS NEEDED (WINTER MAINTENANCE) $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 1009.41 BUILDING ASBESTOS ABATEMENT $ 1. 7,000.00 7,000.00 7,000.00 7,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1010.20 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 $12,201,169.95 $12,957,360.00