THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NEWINGTON X-A000(333), 11238-E COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 20, 2005 SCOPE OF WORK: SAFETY IMPROVEMENTS LOCATION: SPAULDING TURNPIKE EXIT 4 INTERCHANGE COMPLETION DATE: JULY 21, 2006 A S. U. R. CONSTRUCTION, INC. 233 CHESTNUT HILL RD., ROCHESTER, NH 03867 $ 4,010,000.01 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $ 4,274,818.00 C GEORGE R. CAIRNS AND SONS INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 4,943,753.93 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.01 CLEARING (F) A .05 5,330.00 266.50 8,500.00 425.00 2,300.00 115.00 201.1 CLEARING AND GRUBBING (F) A 4.45 8,440.00 37,558.00 8,500.00 37,825.00 8,500.00 37,825.00 201.21 REMOVING SMALL TREES EA 13. 254.00 3,302.00 150.00 1,950.00 345.00 4,485.00 201.22 REMOVING LARGE TREES EA 3. 597.00 1,791.00 750.00 2,250.00 1,380.00 4,140.00 202.201 DEMOLISHING BUILDINGS U 1. 5,390.00 5,390.00 10,000.00 10,000.00 15,200.00 15,200.00 202.202 DEMOLISHING BUILDINGS U 1. 21,600.00 21,600.00 20,000.00 20,000.00 29,600.00 29,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 3,100. 9.13 28,303.00 10.00 31,000.00 18.00 55,800.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 15. 343.00 5,145.00 250.00 3,750.00 530.00 7,950.00 202.7 REMOVAL OF GUARDRAIL (F) LF 301. 2.16 650.16 2.00 602.00 3.00 903.00 203.1 COMMON EXCAVATION CY 46,550. 7.73 359,831.50 5.75 267,662.50 8.00 372,400.00 203.2 ROCK EXCAVATION CY 2,800. 41.40 115,920.00 25.00 70,000.00 43.00 120,400.00 203.35 HANDLING EXCAVATED, CONTAMINATED SOILS CY 300. 27.00 8,100.00 10.00 3,000.00 32.00 9,600.00 203.6 EMBANKMENT-IN-PLACE (F) CY 10,100. 1.48 14,948.00 4.60 46,460.00 2.50 25,250.00 206.1 COMMON STRUCTURE EXCAVATION CY 105. 18.30 1,921.50 25.00 2,625.00 11.00 1,155.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 200. 45.70 9,140.00 40.00 8,000.00 23.00 4,600.00 206.2 ROCK STRUCTURE EXCAVATION CY 385. 117.00 45,045.00 70.00 26,950.00 78.00 30,030.00 209.4 GRANULAR BACKFILL (GRAV) CY 725. 28.40 20,590.00 25.00 18,125.00 23.00 16,675.00 211.11 VIBRATION MONITORING SERVICES HR 260. 64.70 16,822.00 60.00 15,600.00 85.00 22,100.00 214. FINE GRADING U 1. 53,700.00 53,700.00 115,000.00 115,000.00 50,000.00 50,000.00 304.1 SAND (F) CY 18,000. 12.30 221,400.00 12.00 216,000.00 17.00 306,000.00 304.2 GRAVEL (F) CY 10,150. 13.50 137,025.00 14.00 142,100.00 20.00 203,000.00 304.3 CRUSHED GRAVEL (F) CY 9,450. 17.10 161,595.00 20.00 189,000.00 25.00 236,250.00 304.31 CRUSHED GRAVEL FOR SHIM CY 100. 17.30 1,730.00 25.00 2,500.00 27.00 2,700.00 11238E PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 150. 40.30 6,045.00 50.00 7,500.00 17.00 2,550.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 455. 27.40 12,467.00 25.00 11,375.00 26.00 11,830.00 403.11052 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, (SUPERPAVE) (QC/QA) TON 8,900. 43.10 383,590.00 40.00 356,000.00 42.00 373,800.00 403.11952 HOT BITUMINOUS PAVEMENT MACHINE METHOD SUPERPAVE (QC/QA) NIGHT TON 2,475. 47.50 117,562.50 44.00 108,900.00 46.00 113,850.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 400. 86.30 34,520.00 85.00 34,000.00 84.00 33,600.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 60. 43.10 2,586.00 50.00 3,000.00 42.00 2,520.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,000. 43.10 43,100.00 50.00 50,000.00 42.00 42,000.00 415.116 PAVEMENT REINFORCING FABRIC, 6 OUNCE (F) SY 52. 18.90 982.80 20.00 1,040.00 19.00 988.00 417. COLD PLANING BITUMINOUS SURFACES (F) SY 2,565. 5.39 13,825.35 7.00 17,955.00 6.00 15,390.00 520.0001 CONCRETE BOX CULVERT U 1. 34,600.00 34,600.00 35,000.00 35,000.00 55,000.00 55,000.00 565.61 BRIDGE APPROACH RAIL E (F) LF 170.1 80.90 13,761.09 75.00 12,757.50 90.00 15,309.00 570.4 MORTAR RUBBLE MASONRY (F) CY .4 1,080.00 432.00 500.00 200.00 1,150.00 460.00 585.3 STONE FILL, CLASS C CY 45. 43.10 1,939.50 50.00 2,250.00 30.00 1,350.00 593.4312 GEOTEXTILE; PERM CONTROL CL.3, NON-WOVEN FILTER CATEGORY 2 SY 100. 3.11 311.00 5.00 500.00 3.50 350.00 603.00212 12" R.C. PIPE, 2000D LF 31. 26.90 833.90 35.00 1,085.00 36.00 1,116.00 603.00215 15" R.C. PIPE, 2000D LF 300. 28.50 8,550.00 43.00 12,900.00 33.00 9,900.00 603.00218 18" R.C. PIPE, 2000D LF 225. 31.40 7,065.00 45.00 10,125.00 36.00 8,100.00 603.00230 30" R.C. PIPE, 2000D LF 48. 51.50 2,472.00 100.00 4,800.00 55.00 2,640.00 603.13015 15" CORR. ALUMINIZED STEEL (TYPE2) PIPE .064" LF 640. 25.70 16,448.00 30.00 19,200.00 35.00 22,400.00 603.13018 18" CORR. ALUMINIZED STEEL (TYPE2) PIPE .064" LF 22. 31.20 686.40 45.00 990.00 37.00 814.00 603.13024 24" CORR. ALUMINIZED STEEL (TYPE2) PIPE .064" LF 16. 38.20 611.20 50.00 800.00 44.00 704.00 603.34112 12" STEEL END SECTIONS EA 11. 127.00 1,397.00 100.00 1,100.00 85.00 935.00 603.34115 15" STEEL END SECTIONS EA 6. 140.00 840.00 120.00 720.00 92.00 552.00 603.34118 18" STEEL END SECTIONS EA 2. 157.00 314.00 150.00 300.00 110.00 220.00 603.34124 24" STEEL END SECTIONS EA 3. 193.00 579.00 200.00 600.00 150.00 450.00 603.34136 36" STEEL END SECTIONS EA 1. 371.00 371.00 500.00 500.00 410.00 410.00 603.59012 12" PIPE FOR DRIVES & MINOR APPR. (CONTRACTORS OPTION) LF 250. 13.90 3,475.00 25.00 6,250.00 32.00 8,000.00 603.83112 12" PLASTIC PIPE (CORR. INTERIOR) LF 8. 42.20 337.60 40.00 320.00 32.00 256.00 603.83115 15" PLASTIC PIPE (CORR. INTERIOR) LF 35. 21.30 745.50 35.00 1,225.00 34.00 1,190.00 603.83204 4" PLASTIC PIPE (SMOOTH INTERIOR) LF 65. 16.00 1,040.00 20.00 1,300.00 29.00 1,885.00 11238E PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,250. 18.30 22,875.00 25.00 31,250.00 28.00 35,000.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 1,650. 19.80 32,670.00 26.00 42,900.00 29.00 47,850.00 603.83218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF 615. 23.30 14,329.50 27.00 16,605.00 31.00 19,065.00 604.0007 POLYETHYLENE LINER EA 39. 171.00 6,669.00 350.00 13,650.00 300.00 11,700.00 604.12 CATCH BASINS TYPE B U 47. 1,400.00 65,800.00 1,500.00 70,500.00 1,530.00 71,910.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 6. 1,850.00 11,100.00 2,300.00 13,800.00 2,050.00 12,300.00 604.242 DROP INLETS TYPE D-B U 3. 1,080.00 3,240.00 1,000.00 3,000.00 1,400.00 4,200.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 6. 270.00 1,620.00 400.00 2,400.00 285.00 1,710.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 2. 270.00 540.00 400.00 800.00 285.00 570.00 604.5 RECONSTRUCTING MANHOLES LF 1. 270.00 270.00 500.00 500.00 285.00 285.00 604.51 RECONSTRUCT SEWER MANHOLE LF 15.6 270.00 4,212.00 400.00 6,240.00 170.00 2,652.00 604.54 RECONSTRUCT TELEPHONE MANHOLE LF 1.2 377.00 452.40 500.00 600.00 170.00 204.00 604.55 ADJUSTING MANHOLE COVERS AND FRAMES EA 7. 297.00 2,079.00 400.00 2,800.00 285.00 1,995.00 604.85 WATER REPELLENT FOR EXISTING CB'S AND DI'S EA 7. 162.00 1,134.00 200.00 1,400.00 110.00 770.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 7,750. 12.50 96,875.00 13.00 100,750.00 15.00 116,250.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 1,100. 16.20 17,820.00 23.00 25,300.00 20.00 22,000.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 18.20 5,460.00 25.00 7,500.00 28.00 8,400.00 605.518 18" PERF. CORR. POLYETHYL PIPE UND. LF 730. 22.00 16,060.00 28.00 20,440.00 32.00 23,360.00 605.79 UNDERDRAIN FLUSHING BASINS EA 12. 247.00 2,964.00 300.00 3,600.00 425.00 5,100.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 75. 10.80 810.00 10.00 750.00 10.00 750.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 162.5 24.80 4,030.00 23.00 3,737.50 22.00 3,575.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 62.5 25.90 1,618.75 30.00 1,875.00 27.00 1,687.50 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 4. 2,370.00 9,480.00 2,200.00 8,800.00 2,750.00 11,000.00 606.14533 BEAM GUARDRAIL (TERM. UNIT SPECIAL 50 FT.) U 6. 2,590.00 15,540.00 2,400.00 14,400.00 2,900.00 17,400.00 606.1495 BEAM GUARDRAIL (TERMINAL SECTION TYPE E-1) LF 125. 43.10 5,387.50 40.00 5,000.00 32.00 4,000.00 606.412 CONCRETE BARRIER, DOUBLE- FACED, PRECAST LF 250. 68.10 17,025.00 75.00 18,750.00 77.00 19,250.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,500. 8.78 30,730.00 20.00 70,000.00 26.00 91,000.00 11238E PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,620.00 1,620.00 1,500.00 1,500.00 2,100.00 2,100.00 607.1 WOVEN WIRE FENCE LF 165. 10.40 1,716.00 10.00 1,650.00 11.00 1,815.00 607.41 POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 14. 203.00 2,842.00 200.00 2,800.00 210.00 2,940.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 2,080. 10.80 22,464.00 15.00 31,200.00 11.50 23,920.00 608.28 8" CONCRETE SIDEWALK (F) SY 1,310. 32.80 42,968.00 55.00 72,050.00 50.00 65,500.00 609.01 STRAIGHT GRANITE CURB LF 2,000. 17.00 34,000.00 15.00 30,000.00 20.00 40,000.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 1,360. 12.70 17,272.00 11.00 14,960.00 17.00 23,120.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 1,150. 14.80 17,020.00 13.00 14,950.00 18.00 20,700.00 609.22 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS LF 35. 12.70 444.50 11.00 385.00 17.00 595.00 609.23 CURVED GRANITE SLOPE CURB LF 15. 50.40 756.00 50.00 750.00 50.00 750.00 609.5 RESET GRANITE CURB LF 3,780. 6.85 25,893.00 7.00 26,460.00 10.00 37,800.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 130. 46.30 6,019.00 100.00 13,000.00 42.00 5,460.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE , CL.52 LF 1,000. 29.10 29,100.00 40.00 40,000.00 39.00 39,000.00 611.05210 10" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,200. 32.20 38,640.00 45.00 54,000.00 44.00 52,800.00 611.05318 18" STEEL CASING SLEEVE LF 20. 78.70 1,574.00 100.00 2,000.00 135.00 2,700.00 611.5011 1" COPPER WATER PIPE LF 85. 27.80 2,363.00 75.00 6,375.00 35.00 2,975.00 611.50115 1-1/2" COPPER WATER PIPE LF 40. 38.40 1,536.00 80.00 3,200.00 37.00 1,480.00 611.5012 2" COPPER WATER PIPE LF 70. 20.00 1,400.00 85.00 5,950.00 40.00 2,800.00 611.5101 1" CORPORATION STOP EA 2. 38.00 76.00 175.00 350.00 60.00 120.00 611.51015 1-1/2" CORPORATION STOP EA 1. 77.10 77.10 200.00 200.00 180.00 180.00 611.5102 2" CORPORATION STOP EA 2. 258.00 516.00 300.00 600.00 220.00 440.00 611.5201 1" CURB STOP EA 2. 91.30 182.60 175.00 350.00 110.00 220.00 611.52015 1-1/2" CURB STOP EA 1. 161.00 161.00 200.00 200.00 185.00 185.00 611.5202 2" CURB STOP EA 2. 213.00 426.00 300.00 600.00 230.00 460.00 611.70008 8" FITTING EA 14. 319.00 4,466.00 350.00 4,900.00 200.00 2,800.00 611.70010 10" FITTING EA 17. 378.00 6,426.00 400.00 6,800.00 270.00 4,590.00 611.71006 6" GATE VALVE EA 1. 456.00 456.00 550.00 550.00 490.00 490.00 611.71008 8" GATE VALVE EA 4. 642.00 2,568.00 750.00 3,000.00 700.00 2,800.00 611.71010 10" GATE VALVE EA 4. 948.00 3,792.00 1,000.00 4,000.00 1,000.00 4,000.00 611.72086 8"X6" DUCTILE IRON TAPPING SLEEVE EA 1. 3,030.00 3,030.00 2,500.00 2,500.00 3,100.00 3,100.00 611.74 CHLORINE INJECTION TAP EA 3. 324.00 972.00 750.00 2,250.00 270.00 810.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 4. 994.00 3,976.00 1,500.00 6,000.00 1,460.00 5,840.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 8. 264.00 2,112.00 200.00 1,600.00 45.00 360.00 611.951 WATER MAIN INSULATION SY 50. 10.80 540.00 20.00 1,000.00 2.30 115.00 611.99 TEMPORARY WATER SERVICE AND APPURTENANCES LS 1. 785.00 785.00 25,000.00 25,000.00 37,500.00 37,500.00 614.331 3" STEEL CONDUIT LF 240. 20.50 4,920.00 19.00 4,560.00 21.00 5,040.00 11238E PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.511 CONCRETE PULL BOX 14" EA 7. 329.00 2,303.00 305.00 2,135.00 335.00 2,345.00 614.522 MOLDED PULL BOX 13"X24" EA 12. 302.00 3,624.00 280.00 3,360.00 310.00 3,720.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 625. 7.49 4,681.25 7.00 4,375.00 8.00 5,000.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 450. 12.90 5,805.00 12.00 5,400.00 13.00 5,850.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 370. 19.40 7,178.00 18.00 6,660.00 20.00 7,400.00 615.01 TRAFFIC SIGN TYPE A (F) SF 216. 45.30 9,784.80 42.00 9,072.00 49.00 10,584.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 1,071.25 56.10 60,097.13 52.00 55,705.00 60.00 64,275.00 615.02 TRAFFIC SIGN TYPE B (F) SF 60. 56.10 3,366.00 52.00 3,120.00 60.00 3,600.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 300.5 80.90 24,310.45 75.00 22,537.50 85.00 25,542.50 615.03 TRAFFIC SIGN TYPE C (F) SF 299.5 36.70 10,991.65 34.00 10,183.00 40.00 11,980.00 615.032 TRAFFIC SIGN TYPE C, BREAKAWAY MOUNTS (F) SF 72. 48.50 3,492.00 45.00 3,240.00 52.00 3,744.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 355. 23.70 8,413.50 22.00 7,810.00 25.00 8,875.00 615.045 RELOCATING TRAFFIC SIGN TYPE AA ON EXISTING FACILITIES (F) SF 153.5 23.70 3,637.95 22.00 3,377.00 25.00 3,837.50 615.05 TRAFFIC SIGN TYPE BB (F) SF 37.67 27.00 1,017.09 25.00 941.75 29.00 1,092.43 615.06 TRAFFIC SIGN TYPE CC (F) SF 99.5 16.20 1,611.90 15.00 1,492.50 17.00 1,691.50 616.7 METER PEDESTAL U 1. 879.00 879.00 815.00 815.00 900.00 900.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 175,000.00 175,000.00 175,000.00 175,000.00 175,000.00 175,000.00 618.7 FLAGGERS HR 2,500. 18.80 47,000.00 15.00 37,500.00 27.00 67,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 115,000.00 115,000.00 75,000.00 75,000.00 180,000.00 180,000.00 619.252 PORTABLE CHANGEABLE MESSAGE SIGN - REMOTE ACCESS U 6. 21,200.00 127,200.00 25,000.00 150,000.00 18,400.00 110,400.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 1. 539.00 539.00 1,500.00 1,500.00 5,200.00 5,200.00 619.3 CALCIUM CHLORIDE LB 7,350. .56 4,116.00 .75 5,512.50 1.15 8,452.50 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 20. 5.39 107.80 5.00 100.00 6.00 120.00 621.31 SINGLE DELINEATOR WITH POST EA 285. 23.70 6,754.50 30.00 8,550.00 25.00 7,125.00 621.32 DOUBLE DELINEATOR WITH POST EA 94. 27.00 2,538.00 32.00 3,008.00 29.00 2,726.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 3. 24.80 74.40 35.00 105.00 27.00 81.00 622.1 STEEL WITNESS MARKERS EA 40. 27.00 1,080.00 25.00 1,000.00 25.00 1,000.00 622.2 CONCRETE BOUNDS EA 33. 350.00 11,550.00 300.00 9,900.00 100.00 3,300.00 622.4 STONE BOUNDS EA 35. 350.00 12,250.00 300.00 10,500.00 125.00 4,375.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 6. 431.00 2,586.00 400.00 2,400.00 440.00 2,640.00 625.52 LIGHT POLE (HIGHWAY) U 5. 1,890.00 9,450.00 1,750.00 8,750.00 1,925.00 9,625.00 625.582 RESETTING LIGHT POLE (HIGHWAY) U 1. 539.00 539.00 500.00 500.00 550.00 550.00 11238E PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 628.2 SAWED BITUMINOUS PAVEMENT LF 5,000. 2.70 13,500.00 2.00 10,000.00 2.00 10,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 64,200. .13 8,346.00 .13 8,346.00 .10 6,420.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 59,100. .17 10,047.00 .16 9,456.00 .15 8,865.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 5,650. .22 1,243.00 .20 1,130.00 .55 3,107.50 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 220. 2.16 475.20 2.00 440.00 .70 154.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 675. 1.89 1,275.75 1.75 1,181.25 1.50 1,012.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 110. 3.77 414.70 3.50 385.00 3.50 385.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 420. 8.63 3,624.60 8.00 3,360.00 4.60 1,932.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 13,650. .42 5,733.00 .39 5,323.50 .30 4,095.00 641. LOAM CY 600. 16.20 9,720.00 20.00 12,000.00 14.00 8,400.00 645.12 TEMPORARY MULCH A 4.2 539.00 2,263.80 1,200.00 5,040.00 1,470.00 6,174.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 13,800. 1.56 21,528.00 1.45 20,010.00 1.70 23,460.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 4,300. 1.89 8,127.00 1.75 7,525.00 2.00 8,600.00 645.3 EROSION STONE TON 200. 25.20 5,040.00 40.00 8,000.00 22.00 4,400.00 645.531 SILT FENCE LF 5,300. 2.16 11,448.00 3.00 15,900.00 3.80 20,140.00 645.532 SILT FENCE WITH SUPPORT FENCE LF 535. 3.23 1,728.05 4.00 2,140.00 6.00 3,210.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 1,620.00 1,620.00 5,000.00 5,000.00 5,750.00 5,750.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 80. 59.30 4,744.00 100.00 8,000.00 92.00 7,360.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 8.1 1,370.00 11,097.00 1,275.00 10,327.50 1,470.00 11,907.00 647.1 HUMUS CY 4,875. 12.40 60,450.00 15.00 73,125.00 11.00 53,625.00 651.83071 THUJA OCCIDENTALIS, MISSION ARBORVITAE, 7' B&B EA 195. 248.00 48,360.00 325.00 63,375.00 370.00 72,150.00 662.281 DECOMMISSION MONITORING WELL LF 40. 21.60 864.00 25.00 1,000.00 45.00 1,800.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 15,096.64 15,096.64 10,000.00 10,000.00 11,000.00 11,000.00 670.0462 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 26,200.00 26,200.00 25,000.00 25,000.00 23,000.00 23,000.00 670.0463 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 7,550.00 7,550.00 2,500.00 2,500.00 3,500.00 3,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 4. 162.00 648.00 200.00 800.00 60.00 240.00 11238E PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 3. 324.00 972.00 400.00 1,200.00 200.00 600.00 670.101 TEMPORARY LIGHTING U 1. 5,390.00 5,390.00 5,000.00 5,000.00 5,500.00 5,500.00 670.22 2" MONITORING WELL LF 20. 80.90 1,618.00 100.00 2,000.00 60.00 1,200.00 678.13 IMPACT ATTENUATION DEVICE (SAND BARREL CRASH CUSION) TEST LEVEL 3 U 2. 4,420.00 8,840.00 5,000.00 10,000.00 10,700.00 21,400.00 692. MOBILIZATION U 1. 160,000.00 160,000.00 300,000.00 300,000.00 428,000.00 428,000.00 698.12 FIELD OFFICE TYPE B MON 20. 1,730.00 34,600.00 1,000.00 20,000.00 1,600.00 32,000.00 698.2 PHYSICAL TESTING LABORATORY MON 19. 863.00 16,397.00 750.00 14,250.00 1,300.00 24,700.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.31 ALTERATIONS AND ADDITIONS AS NEEDED - DRAINAGE ADJUSTMENTS $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.4 BUILDING ASBESTOS ABATEMENT $ 1. 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 24,400.00 24,400.00 24,400.00 24,400.00 24,400.00 24,400.00 $4,010,000.01 $4,274,818.00 $4,943,753.93