THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WINDHAM-SALEM X-A000(045), 10075C COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: FEBRUARY 12, 2004 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH 111 BYPASS ON A NEW LOCATION FROM FLATROCK BROOK, EAST TO NORTH BROADWAY INTERSECTION COMPLETION DATE: NOVEMBER 1, 2005 A R.S. AUDLEY, INC. 609 RTE 3A, BOW, NH 03304 $ 7,490,405.24 B GEORGE R. CAIRNS & SON INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 7,717,097.60 C H.E. SARGENT, INC. 378 BENNOCH ROAD, STILLWATER, ME 04489 $ 8,325,666.00 D WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03301 $ 8,399,837.95 E ALVIN J. COLEMAN & SON INC. 9 N.H. RTE 113, CONWAY, NH 03818 $ 8,414,045.00 F JAN FIVE CORP. D/B/A ALEXANDRA CONSTRUCTION 109 OAK ST., NEWTON, MA 02464 $ 8,921,835.05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA 14.6 7,000.00 102,200.00 14,900.00 217,540.00 18,000.00 262,800.00 201.6 CLEARING FOR FENCE LINES (F) HA .5 4,500.00 2,250.00 7,340.00 3,670.00 10,000.00 5,000.00 203.1 COMMON EXCAVATION M3 110,100. 6.00 660,600.00 6.20 682,620.00 9.75 1,073,475.00 203.2 ROCK EXCAVATION M3 115,800. 12.00 1,389,600.00 11.20 1,296,960.00 9.75 1,129,050.00 203.52 IMPERVIOUS MATERIAL (F) M3 2,300. 11.00 25,300.00 12.50 28,750.00 23.00 52,900.00 203.6 EMBANKMENT-IN-PLACE (F) M3 110,700. 3.50 387,450.00 1.95 215,865.00 2.00 221,400.00 203.81 PRESPLITTING HOLES LM 6,850. 15.00 102,750.00 17.35 118,847.50 22.00 150,700.00 206.1 COMMON STRUCTURE EXCAVATION M3 4,750. 7.50 35,625.00 4.45 21,137.50 15.00 71,250.00 206.2 ROCK STRUCTURE EXCAVATION M3 3,500. 38.00 133,000.00 35.00 122,500.00 22.00 77,000.00 209.1 GRANULAR BACKFILL M3 275. 20.00 5,500.00 23.00 6,325.00 21.00 5,775.00 209.2 GRANULAR BACKFILL (BRIDGE) M3 4,839.7 33.00 159,710.10 23.00 111,313.10 21.00 101,633.70 210.61 GROUNDWATER WELL REPLACEMENT LM 20. 200.00 4,000.00 110.00 2,200.00 120.00 2,400.00 210.7 PROTECTIVE CASING WITH CAP AND LOCK EA 5. 150.00 750.00 165.00 825.00 500.00 2,500.00 214. FINE GRADING U 1. 75,000.00 75,000.00 90,000.00 90,000.00 115,000.00 115,000.00 225.2 PRESTRESSED ROCK BOLTS LM 250. 250.00 62,500.00 286.00 71,500.00 295.00 73,750.00 304.1 SAND (F) M3 29,000. 15.00 435,000.00 16.40 475,600.00 16.00 464,000.00 304.4 CRUSHED STONE (FINE GRADATION) (F) M3 5,850. 18.00 105,300.00 21.50 125,775.00 19.00 111,150.00 10075C PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.5 CRUSHED STONE (COARSE GRADATION) (F) M3 8,650. 18.00 155,700.00 21.50 185,975.00 19.00 164,350.00 403.11052 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE) (QC/QA) T 7,000. 36.50 255,500.00 42.00 294,000.00 42.00 294,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 25. 90.00 2,250.00 110.00 2,750.00 100.00 2,500.00 403.6 PAVEMENT JOINT ADHESIVE U 1. 2,950.00 2,950.00 5,000.00 5,000.00 3,000.00 3,000.00 504.101 COMMON BRIDGE EXCAVATION M3 1,555. 12.00 18,660.00 4.50 6,997.50 12.00 18,660.00 504.2 ROCK BRIDGE EXCAVATION M3 510. 38.00 19,380.00 30.00 15,300.00 70.00 35,700.00 508. STRUCTURAL FILL M3 4,290. 30.00 128,700.00 29.00 124,410.00 22.00 94,380.00 509.1 MOBILIZATION AND DEMOBILI ZATION OF DRILLED SHAFT EQUIPMENT U 1. 9,000.00 9,000.00 10,000.00 10,000.00 70,000.00 70,000.00 509.2 DRILLED SHAFTS LM 245. 470.00 115,150.00 415.00 101,675.00 460.00 112,700.00 509.3 OBSTRUCTION REMOVAL LM 5. 1,250.00 6,250.00 11.00 55.00 600.00 3,000.00 509.4 ROCK SOCKET EXCAVATION LM 10. 1,400.00 14,000.00 11.00 110.00 1,450.00 14,500.00 520.0001 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 18,000.00 18,000.00 21,300.00 21,300.00 55,000.00 55,000.00 520.01 CONCRETE CLASS AA M3 4.5 1,650.00 7,425.00 1,080.00 4,860.00 1,150.00 5,175.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) M3 175. 970.00 169,750.00 757.00 132,475.00 800.00 140,000.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 20. 1,100.00 22,000.00 1,100.00 22,000.00 625.00 12,500.00 520.21 CONCRETE CLASS B, FOOTINGS (F) M3 21. 450.00 9,450.00 550.00 11,550.00 390.00 8,190.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE M3 20. 230.00 4,600.00 165.00 3,300.00 110.00 2,200.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) M3 66. 950.00 62,700.00 1,045.00 68,970.00 1,050.00 69,300.00 528.1112 PRESTRESSED CONCRETE GIRDERS, NEBT 1200 (F) LM 92. 845.00 77,740.00 1,210.00 111,320.00 1,200.00 110,400.00 534.3 WATER REPELLENT (SILANE- SILOXANE) (F) M2 756. 10.00 7,560.00 13.00 9,828.00 12.00 9,072.00 538.1 BARRIER MEMBRANE (F) M2 37. 30.00 1,110.00 38.50 1,424.50 38.00 1,406.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 38. 36.00 1,368.00 38.50 1,463.00 38.00 1,444.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LM 29. 20.00 580.00 22.00 638.00 21.00 609.00 544. REINFORCING STEEL (F) KG 6,024. 1.95 11,746.80 1.95 11,746.80 2.00 12,048.00 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 21,424. 2.00 42,848.00 2.20 47,132.80 2.25 48,204.00 548.11 ELASTOMERIC BEARING PADS (F) EA 10. 400.00 4,000.00 610.00 6,100.00 600.00 6,000.00 559.5 SILICONE JOINT SEALANT (F LM 32. 40.00 1,280.00 126.00 4,032.00 118.00 3,776.00 563.22 BRIDGE RAIL T2 (F) LM 86. 236.00 20,296.00 248.00 21,328.00 205.00 17,630.00 570.4 MORTAR RUBBLE MASONRY (F) M3 4. 325.00 1,300.00 385.00 1,540.00 375.00 1,500.00 585.2 STONE FILL, CLASS B M3 750. 23.00 17,250.00 29.00 21,750.00 30.00 22,500.00 10075C PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 585.3 STONE FILL, CLASS C M3 3,200. 25.00 80,000.00 32.00 102,400.00 30.00 96,000.00 585.4 STONE FILL, CLASS D M3 10. 40.00 400.00 32.00 320.00 40.00 400.00 591.2 STRUCTURAL PLATE PIPE- ARCH (F) KG 16,000. 2.50 40,000.00 2.10 33,600.00 2.50 40,000.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL M2 757. 370.00 280,090.00 290.00 219,530.00 330.00 249,810.00 592.2 MODULAR BLOCK RETAINING WALL M2 100. 160.00 16,000.00 275.00 27,500.00 215.00 21,500.00 593.22 MEDIUM STRENGTH GEOTEXTILE, NON-WOVEN M2 4,400. 3.95 17,380.00 1.20 5,280.00 1.31 5,764.00 594.2 WOOD PANEL SOUND ABATEMENT WALL M2 1,250. 175.00 218,750.00 165.00 206,250.00 160.00 200,000.00 603.00204 375 MM R.C. PIPE, CLASS III LM 385. 90.00 34,650.00 94.00 36,190.00 126.00 48,510.00 603.00205 450 MM R.C. PIPE, CLASS III LM 195. 105.00 20,475.00 102.00 19,890.00 128.00 24,960.00 603.00206 600 MM R.C. PIPE, CLASS III LM 55. 127.00 6,985.00 122.00 6,710.00 153.00 8,415.00 603.34104 375 MM STEEL END SECTION EA 3. 220.00 660.00 90.00 270.00 157.00 471.00 603.34105 450 MM STEEL END SECTION EA 6. 230.00 1,380.00 100.00 600.00 173.41 1,040.46 603.34106 600 MM STEEL END SECTION EA 6. 265.00 1,590.00 140.00 840.00 240.00 1,440.00 603.49003 300 MM PIPE FOR SLOPE DRAIN. (CONTRACTORS OPTION) LM 50. 97.00 4,850.00 73.00 3,650.00 122.00 6,100.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 140. 80.00 11,200.00 73.00 10,220.00 70.00 9,800.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 425. 90.00 38,250.00 76.00 32,300.00 83.00 35,275.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 130. 99.00 12,870.00 84.00 10,920.00 108.00 14,040.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 450. 117.00 52,650.00 98.00 44,100.00 129.00 58,050.00 603.85204 375 MM CORR. POLYETHYLENE END SECTION EA 2. 235.00 470.00 97.00 194.00 175.00 350.00 603.85205 450 MM CORR. POLYETHYLENE END SECTION EA 1. 250.00 250.00 115.00 115.00 300.00 300.00 603.85206 600 MM CORR. POLYETHYLENE END SECTION EA 2. 275.00 550.00 145.00 290.00 250.00 500.00 604.0007 POLYETHYLENE LINER EA 11. 300.00 3,300.00 170.00 1,870.00 260.00 2,860.00 604.12 CATCH BASINS TYPE B U 8. 1,450.00 11,600.00 1,300.00 10,400.00 1,400.00 11,200.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 1. 2,220.00 2,220.00 1,700.00 1,700.00 1,900.00 1,900.00 604.15 CATCH BASINS TYPE E U 29. 1,500.00 43,500.00 1,385.00 40,165.00 1,500.00 43,500.00 604.1515 CATCH BASINS TYPE E, 1.5 M DIA U 1. 2,300.00 2,300.00 1,800.00 1,800.00 2,000.00 2,000.00 604.1518 CATCH BASINS TYPE E, 1.8 M DIA U 1. 2,800.00 2,800.00 2,110.00 2,110.00 3,000.00 3,000.00 604.242 DROP INLETS TYPE D-B U 3. 1,000.00 3,000.00 970.00 2,910.00 1,200.00 3,600.00 604.39 SPECIAL MANHOLES U 3. 11,000.00 33,000.00 4,250.00 12,750.00 3,000.00 9,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 12. 500.00 6,000.00 500.00 6,000.00 200.00 2,400.00 10075C PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 605.915 150 MM PIPE UND.(CONTRACT ORS OPTION) LM 3,150. 27.00 85,050.00 52.00 163,800.00 40.00 126,000.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 1,340. 44.29 59,348.60 50.00 67,000.00 46.00 61,640.00 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 6. 1,500.00 9,000.00 1,540.00 9,240.00 1,570.00 9,420.00 606.1495 BEAM GUARDRAIL TERMINAL SECTION TYPE E-1) LM 241. 68.90 16,604.90 69.00 16,629.00 70.00 16,870.00 607.1 WOVEN WIRE FENCE LM 4,750. 15.58 74,005.00 18.00 85,500.00 17.00 80,750.00 607.315 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRI 1.5 METERS HIGH LM 620. 45.93 28,476.60 50.00 31,000.00 46.00 28,520.00 607.41 POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 52. 100.00 5,200.00 106.00 5,512.00 97.00 5,044.00 607.415 POST ASSEMBLIES FOR CHAIN LINK FENCE, 1.5 METERS HIGH EA 8. 125.00 1,000.00 180.00 1,440.00 165.00 1,320.00 607.61573 7.3 M OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD. STEEL FABRIC, 1.5 M HIGH EA 1. 1,450.00 1,450.00 1,895.00 1,895.00 1,800.00 1,800.00 608.215 150 MM CONCRETE SIDEWALK (F) M2 350. 50.00 17,500.00 38.00 13,300.00 50.00 17,500.00 609.01 STRAIGHT GRANITE CURB LM 65. 49.00 3,185.00 52.00 3,380.00 55.00 3,575.00 609.21 STRAIGHT GRANITE SLOPE CURB LM 220. 33.00 7,260.00 38.00 8,360.00 50.00 11,000.00 609.23 CURVED GRANITE SLOPE CURB LM 3. 164.00 492.00 155.00 465.00 50.00 150.00 609.3 STRAIGHT GRANITE CURB (BRIDGE) LM 86. 91.84 7,898.24 110.00 9,460.00 100.00 8,600.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 535. 9.00 4,815.00 11.00 5,885.00 8.00 4,280.00 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 5. 350.00 1,750.00 360.00 1,800.00 325.00 1,625.00 614.70814 75 MM PVC PLASTIC CONDUIT SCHEDULE 40 LM 120. 28.00 3,360.00 30.00 3,600.00 27.00 3,240.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 30. 40.00 1,200.00 55.00 1,650.00 50.00 1,500.00 614.71018 100 MM PVC PLASTIC CONDUI SCHEDULE 80 LM 9. 60.00 540.00 60.00 540.00 55.00 495.00 614.71518 150 MM PVC PLASTIC CONDUIT, SCHEDULE 80 LM 50. 70.00 3,500.00 63.00 3,150.00 57.00 2,850.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 98,000.00 98,000.00 98,000.00 98,000.00 98,000.00 98,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 140,000.00 140,000.00 100,000.00 100,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 47. 4.00 188.00 4.50 211.50 4.00 188.00 622.1 STEEL WITNESS MARKERS EA 71. 20.00 1,420.00 22.00 1,562.00 19.00 1,349.00 622.2 CONCRETE BOUNDS EA 39. 200.00 7,800.00 220.00 8,580.00 180.00 7,020.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 3. 750.00 2,250.00 1,100.00 3,300.00 1,000.00 3,000.00 10075C PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 641. LOAM M3 210. 22.00 4,620.00 15.00 3,150.00 20.00 4,200.00 642. LIMESTONE T 36.4 115.00 4,186.00 133.00 4,841.20 121.00 4,404.40 643.12 FERTILIZER FOR INITIAL APPLICATION T 8. 350.00 2,800.00 363.00 2,904.00 330.00 2,640.00 643.22 FERTILIZER FOR REFERTIL- IZATION T 8. 300.00 2,400.00 363.00 2,904.00 330.00 2,640.00 644.22 SHRUB AND FORESTED SWAMP SEED MIX KG 34. 125.00 4,250.00 160.00 5,440.00 146.00 4,964.00 644.45 SLOPE SEED (WF) TYPE 45 KG 730. 17.00 12,410.00 16.50 12,045.00 15.00 10,950.00 644.6 CROWNVETCH SEED KG 43. 50.00 2,150.00 48.50 2,085.50 44.00 1,892.00 644.62 WET BASIN SEED, TYPE 62 KG 2. 100.00 200.00 121.00 242.00 110.00 220.00 644.73 EMERGENT ZONE (SHALLOW MARSH) SEED MIX KG 7. 200.00 1,400.00 240.00 1,680.00 218.00 1,526.00 644.74 UPLAND SEED MIX KG 45. 75.00 3,375.00 82.00 3,690.00 74.00 3,330.00 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 KG 7. 20.00 140.00 24.00 168.00 22.00 154.00 645.11 MULCH HA 8.1 850.00 6,885.00 1,087.00 8,804.70 990.00 8,019.00 645.112 STRAW MULCH HA 5. 850.00 4,250.00 1,087.00 5,435.00 990.00 4,950.00 645.2 MATTING FOR EROSION CONTROL M2 1,600. 1.25 2,000.00 1.30 2,080.00 1.20 1,920.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 5,640. 1.25 7,050.00 1.30 7,332.00 1.20 6,768.00 645.3 EROSION STONE T 175. 35.00 6,125.00 29.00 5,075.00 40.00 7,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 6.00 1,200.00 7.65 1,530.00 7.00 1,400.00 645.531 SILT FENCE LM 1,640. 6.00 9,840.00 9.00 14,760.00 10.00 16,400.00 645.532 SILT FENCE WITH SUPPORT FENCE LM 50. 9.00 450.00 13.50 675.00 19.00 950.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 3,000.00 3,000.00 8,800.00 8,800.00 10,000.00 10,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 1,220. 45.00 54,900.00 55.00 67,100.00 100.00 122,000.00 647.1 HUMUS M3 7,400. 18.50 136,900.00 10.00 74,000.00 15.00 111,000.00 647.29 WETLAND HUMUS M3 7,100. 20.00 142,000.00 11.40 80,940.00 25.00 177,500.00 651.66032 PINUS STROBUS WHITE PINE 0.9M 1 YR POT CONT EA 30. 30.00 900.00 29.00 870.00 26.00 780.00 651.66042 PINUS STROBUS WHITE PINE 1.2M 1 YR POT CONT EA 63. 45.00 2,835.00 35.00 2,205.00 32.00 2,016.00 651.82071 THUJA OCCIDENTALIS NIGRA DARK AMERICAN ARBORVITAE 2.1M B&B EA 46. 135.00 6,210.00 117.00 5,382.00 106.00 4,876.00 652.06042 ACER RUBRUM RED MAPLE 1.2M 1 YR POT CONT EA 249. 25.00 6,225.00 29.00 7,221.00 26.00 6,474.00 652.09032 ACER SACCHARUM SUGAR MAPLE 0.9M 1 YR POT CONT EA 30. 25.00 750.00 25.00 750.00 22.00 660.00 10075C PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 652.16032 BETULA PAPYRIFERA PAPER BIRCH 0.9M 1 YR POT CONT EA 30. 25.00 750.00 25.00 750.00 23.00 690.00 652.34032 FRAXINUS AMERICANA WHITE ASH 0.9M 1 YR POT CONT EA 30. 25.00 750.00 29.00 870.00 26.00 780.00 652.37042 FRAXINUS PENNSYLVANICA GREEN ASH 1.2M 1 YR POT CONT EA 113. 25.00 2,825.00 29.00 3,277.00 26.00 2,938.00 652.69032 QUERCUS RUBRA RED OAK 0.9M 1 YR POT CONT EA 30. 25.00 750.00 29.00 870.00 26.00 780.00 652.69042 QUERCUS RUBRA RED OAK 1.2M 1 YR POT CONT EA 113. 45.00 5,085.00 35.00 3,955.00 32.00 3,616.00 653.86022 SALIX DISCOLOR PUSSY WILLOW 0.76M 1 YR POT CONT EA 141. 23.00 3,243.00 21.00 2,961.00 19.00 2,679.00 655.01042 ALNUS RUGOSA SPECKLED ALDER 0.76M 1 YR POT CONT EA 141. 23.00 3,243.00 24.00 3,384.00 22.00 3,102.00 655.22028 CEPHALANTHUS OCCIDENTALIS BUTTONBUSH 450MM BARE RT EA 190. 23.00 4,370.00 22.00 4,180.00 20.00 3,800.00 655.33042 CORNUS AMOMUM SILKY DOGWOOD 0.76M 1 YR POT CONT EA 141. 23.00 3,243.00 23.00 3,243.00 21.00 2,961.00 655.37042 CORNUS RACEMOSA GRAY DOGWOOD 0.76M 1 YR POT CONT EA 137. 23.00 3,151.00 23.00 3,151.00 21.00 2,877.00 655.72042 HAMAMELIS VIRGINIANA COMMON WITCH-HAZEL 0.76M 1 YR POT CONT EA 100. 23.00 2,300.00 31.00 3,100.00 28.00 2,800.00 655.80042 ILEX VERTICILLATA COMMON WINTERBERRY HOLLY 0.76M 1 YR POT CONT EA 242. 23.00 5,566.00 23.00 5,566.00 21.00 5,082.00 656.36042 RHUS TYPHINA STAGHORN SUMAC 0.76M 1 YR POT CONT EA 137. 23.00 3,151.00 22.00 3,014.00 20.00 2,740.00 656.73042 VACCINIUM CORYMBOSUM HIGHBUSH BLUEBERRY 0.76M 1 YR POT CONT EA 241. 23.00 5,543.00 27.00 6,507.00 25.00 6,025.00 656.81042 VIBURNUM CASSINOIDES WITHEROD VIBURNUM 0.76M 1 YR POT CONT EA 141. 23.00 3,243.00 25.00 3,525.00 22.00 3,102.00 656.82042 VIBURNUM DENTATUM ARROWWOOD 0.76M 1 YR POT CONT EA 141. 23.00 3,243.00 25.00 3,525.00 22.00 3,102.00 656.86042 VIBURNUM LENTAGO NANNYBERRY 0.76M 1 YR POT CONT EA 237. 23.00 5,451.00 24.00 5,688.00 22.00 5,214.00 10075C PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 658.0303 ALISMA PLANTAGO-AQUATICA WATER PLANTAIN ROOT STOCK EA 1,265. 1.25 1,581.25 1.50 1,897.50 1.30 1,644.50 658.1843 CAREX LACUSTRIS LAKEBANK SEDGE ROOT STOCK EA 1,265. 1.15 1,454.75 1.10 1,391.50 1.00 1,265.00 658.1883 CAREX STRICTA TUSSOCK SEDGE ROOT STOCK EA 730. 1.15 839.50 1.10 803.00 1.00 730.00 658.5053 JUNCUS CANADENSIS CANADA RUSH ROOT STOCK EA 730. 1.15 839.50 1.10 803.00 1.00 730.00 658.8003 SCIRPUS CYPERINUS WOOL-GRASS ROOT STOCK EA 730. 1.15 839.50 1.10 803.00 1.00 730.00 658.8043 SCRIPUS PUNGENS THREE-SQUARE BULRUSH ROOT STOCK EA 535. 1.15 615.25 1.10 588.50 1.00 535.00 658.8083 SCIRPUS VALIDUS SOFT-STEM BULRUSH ROOT STOCK EA 535. 1.15 615.25 1.10 588.50 1.00 535.00 658.8403 SPARGANIUM AMERICANUM AMERICAN BURREED ROOT STOCK EA 1,265. 1.15 1,454.75 1.10 1,391.50 1.00 1,265.00 658.9153 VALLISNERIA AMERICANA WILD CELERY ROOT STOCK EA 535. 1.15 615.25 1.10 588.50 1.00 535.00 670.95 TEMPORARY SAFETY FENCE LM 150. 6.00 900.00 15.50 2,325.00 12.00 1,800.00 692. MOBILIZATION U 1. 400,000.00 400,000.00 718,300.00 718,300.00 758,775.94 758,775.94 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 698.12 FIELD OFFICE TYPE B MON 20. 1,650.00 33,000.00 1,180.00 23,600.00 1,200.00 24,000.00 698.2 PHYSICAL TESTING LABORATORY MON 20. 900.00 18,000.00 1,100.00 22,000.00 900.00 18,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1008.7 ALTERATIONS AND ADDITIONS AS NEEDED- SITE CLEAN-UP $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.8 MOUND AND POOL MICROTOPOGRAPHY $ 1. 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 1008.9 ALTERATIONS AND ADDITIONS AS NEEDED (EARTHWORK REVISIONS TO MIT. SITES) $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009. MISCELLANOUS LANDSCAPE TREATMENT $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 15,050.00 15,050.00 15,050.00 15,050.00 15,050.00 15,050.00 10075C PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 $7,490,405.24 $7,717,097.60 $8,325,666.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WINDHAM-SALEM X-A000(045), 10075C COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: FEBRUARY 12, 2004 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH 111 BYPASS ON A NEW LOCATION FROM FLATROCK BROOK, EAST TO NORTH BROADWAY INTERSECTION COMPLETION DATE: NOVEMBER 1, 2005 A R.S. AUDLEY, INC. 609 RTE 3A, BOW, NH 03304 $ 7,490,405.24 B GEORGE R. CAIRNS & SON INC. 8 LEDGE RD., WINDHAM, NH 03087 $ 7,717,097.60 C H.E. SARGENT, INC. 378 BENNOCH ROAD, STILLWATER, ME 04489 $ 8,325,666.00 D WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03301 $ 8,399,837.95 E ALVIN J. COLEMAN & SON INC. 9 N.H. RTE 113, CONWAY, NH 03818 $ 8,414,045.00 F JAN FIVE CORP. D/B/A ALEXANDRA CONSTRUCTION 109 OAK ST., NEWTON, MA 02464 $ 8,921,835.05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) HA 14.6 9,000.00 131,400.00 15,200.00 221,920.00 13,600.00 198,560.00 201.6 CLEARING FOR FENCE LINES (F) HA .5 7,000.00 3,500.00 6,700.00 3,350.00 7,300.00 3,650.00 203.1 COMMON EXCAVATION M3 110,100. 5.60 616,560.00 4.60 506,460.00 6.00 660,600.00 203.2 ROCK EXCAVATION M3 115,800. 17.00 1,968,600.00 15.20 1,760,160.00 8.00 926,400.00 203.52 IMPERVIOUS MATERIAL (F) M3 2,300. 19.00 43,700.00 8.00 18,400.00 24.00 55,200.00 203.6 EMBANKMENT-IN-PLACE (F) M3 110,700. 2.30 254,610.00 2.10 232,470.00 6.50 719,550.00 203.81 PRESPLITTING HOLES LM 6,850. 16.25 111,312.50 15.85 108,572.50 15.00 102,750.00 206.1 COMMON STRUCTURE EXCAVATION M3 4,750. 9.55 45,362.50 8.90 42,275.00 6.50 30,875.00 206.2 ROCK STRUCTURE EXCAVATION M3 3,500. 35.00 122,500.00 38.50 134,750.00 41.00 143,500.00 209.1 GRANULAR BACKFILL M3 275. 26.00 7,150.00 32.00 8,800.00 25.00 6,875.00 209.2 GRANULAR BACKFILL (BRIDGE) M3 4,839.7 26.00 125,832.20 22.00 106,473.40 25.00 120,992.50 210.61 GROUNDWATER WELL REPLACEMENT LM 20. 105.00 2,100.00 450.00 9,000.00 200.00 4,000.00 210.7 PROTECTIVE CASING WITH CAP AND LOCK EA 5. 160.00 800.00 500.00 2,500.00 100.00 500.00 214. FINE GRADING U 1. 166,000.00 166,000.00 38,800.00 38,800.00 102.00 102.00 225.2 PRESTRESSED ROCK BOLTS LM 250. 275.00 68,750.00 442.00 110,500.00 260.00 65,000.00 304.1 SAND (F) M3 29,000. 25.00 725,000.00 20.20 585,800.00 23.25 674,250.00 304.4 CRUSHED STONE (FINE GRADATION) (F) M3 5,850. 21.70 126,945.00 17.90 104,715.00 27.00 157,950.00 10075C PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.5 CRUSHED STONE (COARSE GRADATION) (F) M3 8,650. 21.70 187,705.00 17.90 154,835.00 32.00 276,800.00 403.11052 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE) (QC/QA) T 7,000. 38.50 269,500.00 43.25 302,750.00 40.00 280,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD T 25. 105.00 2,625.00 88.00 2,200.00 80.00 2,000.00 403.6 PAVEMENT JOINT ADHESIVE U 1. 5,000.00 5,000.00 5,220.00 5,220.00 5,000.00 5,000.00 504.101 COMMON BRIDGE EXCAVATION M3 1,555. 11.00 17,105.00 15.00 23,325.00 13.00 20,215.00 504.2 ROCK BRIDGE EXCAVATION M3 510. 46.00 23,460.00 120.00 61,200.00 33.00 16,830.00 508. STRUCTURAL FILL M3 4,290. 40.00 171,600.00 22.50 96,525.00 34.00 145,860.00 509.1 MOBILIZATION AND DEMOBILI ZATION OF DRILLED SHAFT EQUIPMENT U 1. 9,000.00 9,000.00 25,000.00 25,000.00 2,500.00 2,500.00 509.2 DRILLED SHAFTS LM 245. 575.00 140,875.00 1,020.00 249,900.00 850.00 208,250.00 509.3 OBSTRUCTION REMOVAL LM 5. 1,300.00 6,500.00 2,500.00 12,500.00 2,000.00 10,000.00 509.4 ROCK SOCKET EXCAVATION LM 10. 1,300.00 13,000.00 2,500.00 25,000.00 2,100.00 21,000.00 520.0001 PRECAST CONCRETE BOX CULVERT (CLASS AAA) U 1. 20,000.00 20,000.00 49,600.00 49,600.00 30,000.00 30,000.00 520.01 CONCRETE CLASS AA M3 4.5 1,100.00 4,950.00 890.00 4,005.00 400.00 1,800.00 520.0102 CONCRETE CLASS AA (QC/QA) (F) M3 175. 700.00 122,500.00 815.00 142,625.00 425.00 74,375.00 520.12 CONCRETE CLASS A ABOVE FOOTINGS (F) M3 20. 1,000.00 20,000.00 930.00 18,600.00 400.00 8,000.00 520.21 CONCRETE CLASS B, FOOTINGS (F) M3 21. 375.00 7,875.00 490.00 10,290.00 500.00 10,500.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE M3 20. 150.00 3,000.00 220.00 4,400.00 400.00 8,000.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) M3 66. 1,000.00 66,000.00 1,050.00 69,300.00 600.00 39,600.00 528.1112 PRESTRESSED CONCRETE GIRDERS, NEBT 1200 (F) LM 92. 1,200.00 110,400.00 1,585.00 145,820.00 1,250.00 115,000.00 534.3 WATER REPELLENT (SILANE- SILOXANE) (F) M2 756. 13.00 9,828.00 12.00 9,072.00 10.00 7,560.00 538.1 BARRIER MEMBRANE (F) M2 37. 39.00 1,443.00 60.00 2,220.00 60.00 2,220.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) M2 38. 41.00 1,558.00 37.00 1,406.00 80.00 3,040.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LM 29. 22.00 638.00 20.00 580.00 40.00 1,160.00 544. REINFORCING STEEL (F) KG 6,024. 1.90 11,445.60 2.50 15,060.00 2.25 13,554.00 544.2 REINFORCING STEEL, EPOXY COATED (F) KG 21,424. 2.10 44,990.40 2.20 47,132.80 2.95 63,200.80 548.11 ELASTOMERIC BEARING PADS (F) EA 10. 600.00 6,000.00 388.00 3,880.00 500.00 5,000.00 559.5 SILICONE JOINT SEALANT (F LM 32. 120.00 3,840.00 56.00 1,792.00 10.00 320.00 563.22 BRIDGE RAIL T2 (F) LM 86. 250.00 21,500.00 254.00 21,844.00 10.00 860.00 570.4 MORTAR RUBBLE MASONRY (F) M3 4. 500.00 2,000.00 520.00 2,080.00 250.00 1,000.00 585.2 STONE FILL, CLASS B M3 750. 19.60 14,700.00 24.00 18,000.00 50.00 37,500.00 10075C PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 585.3 STONE FILL, CLASS C M3 3,200. 20.25 64,800.00 29.00 92,800.00 45.00 144,000.00 585.4 STONE FILL, CLASS D M3 10. 40.00 400.00 37.80 378.00 55.00 550.00 591.2 STRUCTURAL PLATE PIPE- ARCH (F) KG 16,000. 2.25 36,000.00 3.40 54,400.00 2.85 45,600.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL M2 757. 330.00 249,810.00 376.00 284,632.00 236.00 178,652.00 592.2 MODULAR BLOCK RETAINING WALL M2 100. 110.00 11,000.00 440.00 44,000.00 226.00 22,600.00 593.22 MEDIUM STRENGTH GEOTEXTILE, NON-WOVEN M2 4,400. 2.30 10,120.00 6.20 27,280.00 2.30 10,120.00 594.2 WOOD PANEL SOUND ABATEMENT WALL M2 1,250. 180.00 225,000.00 178.00 222,500.00 240.00 300,000.00 603.00204 375 MM R.C. PIPE, CLASS III LM 385. 72.00 27,720.00 92.00 35,420.00 603.00205 450 MM R.C. PIPE, CLASS III LM 195. 85.00 16,575.00 160.00 31,200.00 603.00206 600 MM R.C. PIPE, CLASS III LM 55. 115.00 6,325.00 185.00 10,175.00 603.34104 375 MM STEEL END SECTION EA 3. 145.00 435.00 125.00 375.00 603.34105 450 MM STEEL END SECTION EA 6. 160.00 960.00 140.00 840.00 603.34106 600 MM STEEL END SECTION EA 6. 200.00 1,200.00 175.00 1,050.00 603.49003 300 MM PIPE FOR SLOPE DRAIN. (CONTRACTORS OPTION) LM 50. 79.00 3,950.00 75.00 3,750.00 91.00 4,550.00 603.83203 300 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 140. 56.00 7,840.00 75.00 10,500.00 98.00 13,720.00 603.83204 375 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 425. 63.00 26,775.00 80.00 34,000.00 100.00 42,500.00 603.83205 450 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 130. 70.00 9,100.00 90.00 11,700.00 103.00 13,390.00 603.83206 600 MM PLASTIC PIPE (SMOOTH INTERIOR) LM 450. 79.00 35,550.00 98.00 44,100.00 106.00 47,700.00 603.85204 375 MM CORR. POLYETHYLENE END SECTION EA 2. 165.00 330.00 135.00 270.00 400.00 800.00 603.85205 450 MM CORR. POLYETHYLENE END SECTION EA 1. 200.00 200.00 170.00 170.00 475.00 475.00 603.85206 600 MM CORR. POLYETHYLENE END SECTION EA 2. 225.00 450.00 190.00 380.00 550.00 1,100.00 604.0007 POLYETHYLENE LINER EA 11. 200.00 2,200.00 210.00 2,310.00 90.00 990.00 604.12 CATCH BASINS TYPE B U 8. 1,300.00 10,400.00 1,280.00 10,240.00 2,300.00 18,400.00 604.1215 CATCH BASINS TYPE B, 1.5 M DIA U 1. 1,750.00 1,750.00 2,200.00 2,200.00 2,500.00 2,500.00 604.15 CATCH BASINS TYPE E U 29. 1,425.00 41,325.00 1,380.00 40,020.00 2,800.00 81,200.00 604.1515 CATCH BASINS TYPE E, 1.5 M DIA U 1. 1,900.00 1,900.00 2,280.00 2,280.00 2,900.00 2,900.00 604.1518 CATCH BASINS TYPE E, 1.8 M DIA U 1. 2,500.00 2,500.00 3,170.00 3,170.00 3,200.00 3,200.00 604.242 DROP INLETS TYPE D-B U 3. 900.00 2,700.00 1,000.00 3,000.00 1,800.00 5,400.00 604.39 SPECIAL MANHOLES U 3. 3,000.00 9,000.00 2,780.00 8,340.00 3,000.00 9,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 12. 350.00 4,200.00 380.00 4,560.00 750.00 9,000.00 10075C PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 605.915 150 MM PIPE UND.(CONTRACT ORS OPTION) LM 3,150. 42.50 133,875.00 44.80 141,120.00 65.00 204,750.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LM 1,340. 48.00 64,320.00 45.18 60,541.20 51.96 69,626.40 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 6. 1,500.00 9,000.00 1,570.00 9,420.00 1,805.50 10,833.00 606.1495 BEAM GUARDRAIL TERMINAL SECTION TYPE E-1) LM 241. 65.00 15,665.00 68.57 16,525.37 78.86 19,005.26 607.1 WOVEN WIRE FENCE LM 4,750. 17.00 80,750.00 16.15 76,712.50 18.57 88,207.50 607.315 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRI 1.5 METERS HIGH LM 620. 50.00 31,000.00 45.64 28,296.80 52.37 32,469.40 607.41 POST ASSEMBLIES FOR WOVEN WIRE FENCE EA 52. 100.00 5,200.00 97.00 5,044.00 111.55 5,800.60 607.415 POST ASSEMBLIES FOR CHAIN LINK FENCE, 1.5 METERS HIGH EA 8. 200.00 1,600.00 165.00 1,320.00 189.75 1,518.00 607.61573 7.3 M OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD. STEEL FABRIC, 1.5 M HIGH EA 1. 2,000.00 2,000.00 1,722.00 1,722.00 1,980.30 1,980.30 608.215 150 MM CONCRETE SIDEWALK (F) M2 350. 38.00 13,300.00 42.50 14,875.00 100.00 35,000.00 609.01 STRAIGHT GRANITE CURB LM 65. 50.00 3,250.00 62.50 4,062.50 95.00 6,175.00 609.21 STRAIGHT GRANITE SLOPE CURB LM 220. 36.00 7,920.00 34.00 7,480.00 75.00 16,500.00 609.23 CURVED GRANITE SLOPE CURB LM 3. 150.00 450.00 132.00 396.00 400.00 1,200.00 609.3 STRAIGHT GRANITE CURB (BRIDGE) LM 86. 105.00 9,030.00 94.00 8,084.00 98.00 8,428.00 609.811 BITUMINOUS CURB TYPE B (100 MM REVEAL) LM 535. 11.00 5,885.00 6.00 3,210.00 7.00 3,745.00 614.522 MOLDED PULL BOX 325 MM X 600 MM EA 5. 325.00 1,625.00 325.00 1,625.00 374.00 1,870.00 614.70814 75 MM PVC PLASTIC CONDUIT SCHEDULE 40 LM 120. 25.00 3,000.00 27.00 3,240.00 31.05 3,726.00 614.70818 75 MM PVC PLASTIC CONDUIT SCHEDULE 80 LM 30. 55.00 1,650.00 50.00 1,500.00 57.50 1,725.00 614.71018 100 MM PVC PLASTIC CONDUI SCHEDULE 80 LM 9. 55.00 495.00 55.00 495.00 63.25 569.25 614.71518 150 MM PVC PLASTIC CONDUIT, SCHEDULE 80 LM 50. 55.00 2,750.00 57.00 2,850.00 65.55 3,277.50 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 98,000.00 98,000.00 98,000.00 98,000.00 98,000.00 98,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 90,000.00 90,000.00 25,000.00 25,000.00 15,000.00 15,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 47. 4.25 199.75 4.00 188.00 5.00 235.00 622.1 STEEL WITNESS MARKERS EA 71. 21.00 1,491.00 19.00 1,349.00 22.00 1,562.00 622.2 CONCRETE BOUNDS EA 39. 210.00 8,190.00 180.00 7,020.00 207.00 8,073.00 625.22 CONCRETE LIGHT POLE BASES, TYPE B (FOR HIGH- WAY LIGHTING) EA 3. 600.00 1,800.00 1,000.00 3,000.00 1,150.00 3,450.00 10075C PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 641. LOAM M3 210. 19.65 4,126.50 28.00 5,880.00 30.00 6,300.00 642. LIMESTONE T 36.4 130.00 4,732.00 110.00 4,004.00 126.50 4,604.60 643.12 FERTILIZER FOR INITIAL APPLICATION T 8. 350.00 2,800.00 375.00 3,000.00 431.25 3,450.00 643.22 FERTILIZER FOR REFERTIL- IZATION T 8. 330.00 2,640.00 300.00 2,400.00 345.00 2,760.00 644.22 SHRUB AND FORESTED SWAMP SEED MIX KG 34. 150.00 5,100.00 120.00 4,080.00 138.00 4,692.00 644.45 SLOPE SEED (WF) TYPE 45 KG 730. 16.00 11,680.00 65.00 47,450.00 74.75 54,567.50 644.6 CROWNVETCH SEED KG 43. 47.00 2,021.00 50.00 2,150.00 57.50 2,472.50 644.62 WET BASIN SEED, TYPE 62 KG 2. 120.00 240.00 100.00 200.00 115.00 230.00 644.73 EMERGENT ZONE (SHALLOW MARSH) SEED MIX KG 7. 225.00 1,575.00 165.00 1,155.00 189.75 1,328.25 644.74 UPLAND SEED MIX KG 45. 79.00 3,555.00 66.00 2,970.00 75.90 3,415.50 644.82 SALT-TOLERANT GRASS SEED, TYPE 82 KG 7. 25.00 175.00 13.00 91.00 14.95 104.65 645.11 MULCH HA 8.1 1,050.00 8,505.00 1,100.00 8,910.00 1,150.00 9,315.00 645.112 STRAW MULCH HA 5. 1,050.00 5,250.00 4,000.00 20,000.00 1,350.00 6,750.00 645.2 MATTING FOR EROSION CONTROL M2 1,600. 1.25 2,000.00 1.35 2,160.00 1.55 2,480.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) M2 5,640. 1.25 7,050.00 1.35 7,614.00 1.50 8,460.00 645.3 EROSION STONE T 175. 32.00 5,600.00 50.00 8,750.00 35.00 6,125.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 6.00 1,200.00 7.00 1,400.00 10.00 2,000.00 645.531 SILT FENCE LM 1,640. 7.55 12,382.00 6.80 11,152.00 18.00 29,520.00 645.532 SILT FENCE WITH SUPPORT FENCE LM 50. 15.00 750.00 15.00 750.00 30.00 1,500.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 5,000.00 5,000.00 2,000.00 2,000.00 6,000.00 6,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 1,220. 20.00 24,400.00 42.00 51,240.00 50.00 61,000.00 647.1 HUMUS M3 7,400. 13.15 97,310.00 13.50 99,900.00 1.00 7,400.00 647.29 WETLAND HUMUS M3 7,100. 15.00 106,500.00 25.00 177,500.00 1.25 8,875.00 651.66032 PINUS STROBUS WHITE PINE 0.9M 1 YR POT CONT EA 30. 28.00 840.00 26.00 780.00 63.83 1,914.90 651.66042 PINUS STROBUS WHITE PINE 1.2M 1 YR POT CONT EA 63. 35.00 2,205.00 98.00 6,174.00 86.83 5,470.29 651.82071 THUJA OCCIDENTALIS NIGRA DARK AMERICAN ARBORVITAE 2.1M B&B EA 46. 110.00 5,060.00 245.00 11,270.00 196.08 9,019.68 652.06042 ACER RUBRUM RED MAPLE 1.2M 1 YR POT CONT EA 249. 28.00 6,972.00 26.00 6,474.00 31.63 7,875.87 652.09032 ACER SACCHARUM SUGAR MAPLE 0.9M 1 YR POT CONT EA 30. 24.00 720.00 26.00 780.00 29.33 879.90 10075C PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 652.16032 BETULA PAPYRIFERA PAPER BIRCH 0.9M 1 YR POT CONT EA 30. 25.00 750.00 26.00 780.00 31.63 948.90 652.34032 FRAXINUS AMERICANA WHITE ASH 0.9M 1 YR POT CONT EA 30. 28.00 840.00 26.00 780.00 29.63 888.90 652.37042 FRAXINUS PENNSYLVANICA GREEN ASH 1.2M 1 YR POT CONT EA 113. 28.00 3,164.00 26.00 2,938.00 29.33 3,314.29 652.69032 QUERCUS RUBRA RED OAK 0.9M 1 YR POT CONT EA 30. 28.00 840.00 26.00 780.00 29.33 879.90 652.69042 QUERCUS RUBRA RED OAK 1.2M 1 YR POT CONT EA 113. 35.00 3,955.00 98.00 11,074.00 35.08 3,964.04 653.86022 SALIX DISCOLOR PUSSY WILLOW 0.76M 1 YR POT CONT EA 141. 20.00 2,820.00 22.00 3,102.00 28.18 3,973.38 655.01042 ALNUS RUGOSA SPECKLED ALDER 0.76M 1 YR POT CONT EA 141. 24.00 3,384.00 22.00 3,102.00 28.18 3,973.38 655.22028 CEPHALANTHUS OCCIDENTALIS BUTTONBUSH 450MM BARE RT EA 190. 22.00 4,180.00 22.00 4,180.00 20.13 3,824.70 655.33042 CORNUS AMOMUM SILKY DOGWOOD 0.76M 1 YR POT CONT EA 141. 22.00 3,102.00 22.00 3,102.00 28.18 3,973.38 655.37042 CORNUS RACEMOSA GRAY DOGWOOD 0.76M 1 YR POT CONT EA 137. 22.00 3,014.00 22.00 3,014.00 28.18 3,860.66 655.72042 HAMAMELIS VIRGINIANA COMMON WITCH-HAZEL 0.76M 1 YR POT CONT EA 100. 30.00 3,000.00 22.00 2,200.00 28.18 2,818.00 655.80042 ILEX VERTICILLATA COMMON WINTERBERRY HOLLY 0.76M 1 YR POT CONT EA 242. 22.00 5,324.00 22.00 5,324.00 28.18 6,819.56 656.36042 RHUS TYPHINA STAGHORN SUMAC 0.76M 1 YR POT CONT EA 137. 22.00 3,014.00 22.00 3,014.00 28.18 3,860.66 656.73042 VACCINIUM CORYMBOSUM HIGHBUSH BLUEBERRY 0.76M 1 YR POT CONT EA 241. 27.00 6,507.00 22.00 5,302.00 29.33 7,068.53 656.81042 VIBURNUM CASSINOIDES WITHEROD VIBURNUM 0.76M 1 YR POT CONT EA 141. 24.00 3,384.00 22.00 3,102.00 28.18 3,973.38 656.82042 VIBURNUM DENTATUM ARROWWOOD 0.76M 1 YR POT CONT EA 141. 24.00 3,384.00 22.00 3,102.00 28.18 3,973.38 656.86042 VIBURNUM LENTAGO NANNYBERRY 0.76M 1 YR POT CONT EA 237. 24.00 5,688.00 22.00 5,214.00 29.33 6,951.21 10075C PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 658.0303 ALISMA PLANTAGO-AQUATICA WATER PLANTAIN ROOT STOCK EA 1,265. 1.40 1,771.00 1.50 1,897.50 1.61 2,036.65 658.1843 CAREX LACUSTRIS LAKEBANK SEDGE ROOT STOCK EA 1,265. 1.10 1,391.50 1.50 1,897.50 1.67 2,112.55 658.1883 CAREX STRICTA TUSSOCK SEDGE ROOT STOCK EA 730. 1.10 803.00 1.50 1,095.00 1.90 1,387.00 658.5053 JUNCUS CANADENSIS CANADA RUSH ROOT STOCK EA 730. 1.10 803.00 1.50 1,095.00 2.01 1,467.30 658.8003 SCIRPUS CYPERINUS WOOL-GRASS ROOT STOCK EA 730. 1.10 803.00 1.50 1,095.00 1.73 1,262.90 658.8043 SCRIPUS PUNGENS THREE-SQUARE BULRUSH ROOT STOCK EA 535. 1.10 588.50 1.50 802.50 1.90 1,016.50 658.8083 SCIRPUS VALIDUS SOFT-STEM BULRUSH ROOT STOCK EA 535. 1.10 588.50 1.50 802.50 1.73 925.55 658.8403 SPARGANIUM AMERICANUM AMERICAN BURREED ROOT STOCK EA 1,265. 1.10 1,391.50 1.50 1,897.50 1.73 2,188.45 658.9153 VALLISNERIA AMERICANA WILD CELERY ROOT STOCK EA 535. 1.10 588.50 1.50 802.50 1.73 925.55 670.95 TEMPORARY SAFETY FENCE LM 150. 10.00 1,500.00 22.00 3,300.00 30.00 4,500.00 692. MOBILIZATION U 1. 520,000.00 520,000.00 585,841.93 585,841.93 80,000.00 80,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 698.12 FIELD OFFICE TYPE B MON 20. 2,000.00 40,000.00 1,380.00 27,600.00 63,585.66 1,271,713.20 698.2 PHYSICAL TESTING LABORATORY MON 20. 750.00 15,000.00 980.00 19,600.00 8,000.00 160,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1008.7 ALTERATIONS AND ADDITIONS AS NEEDED- SITE CLEAN-UP $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.8 MOUND AND POOL MICROTOPOGRAPHY $ 1. 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 1008.9 ALTERATIONS AND ADDITIONS AS NEEDED (EARTHWORK REVISIONS TO MIT. SITES) $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009. MISCELLANOUS LANDSCAPE TREATMENT $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR ASPHALT $ 1. 15,050.00 15,050.00 15,050.00 15,050.00 15,050.00 15,050.00 10075C PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 $8,399,837.95 $8,414,045.00 $8,921,835.05