THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WESTMORELAND X-A000(206), 14109 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: JUNE 17, 2004 SCOPE OF WORK: ROADWAY RECONSTRUCTION LOCATION: NH 12 AND NH 63 COMPLETION DATE: NOVEMBER 18, 2005 A FRANK W. WHITCOMB CONST. CORP. 187 WHITCOMB RD., WALPOLE, NH 03608 $ 2,020,122.15 B SCOTT'S CONSTRUCTION INC. D/B/A S.C.I. GROUP PO BOX 909, NEWPORT, VT 05855 $ 2,527,705.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .3 20,000.00 6,000.00 9,000.00 2,700.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 40. 20.00 800.00 23.00 920.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 40. 25.00 1,000.00 30.00 1,200.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 500.00 500.00 300.00 300.00 202.7 REMOVAL OF GUARDRAIL (F) LF 50. 10.00 500.00 5.00 250.00 203.1 COMMON EXCAVATION CY 6,150. 4.00 24,600.00 7.00 43,050.00 203.3 UNCLASSIFIED EXCAVATION CY 10,450. 4.00 41,800.00 6.00 62,700.00 203.601 EMBANKMENT-IN-PLACE CY 4,900. 2.00 9,800.00 8.00 39,200.00 206.1 COMMON STRUCTURE EXCAVATION CY 25. 25.00 625.00 30.00 750.00 206.2 ROCK STRUCTURE EXCAVATION CY 352. 25.00 8,800.00 70.00 24,640.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 1,200. 8.00 9,600.00 9.00 10,800.00 209.1 GRANULAR BACKFILL CY 15. 30.00 450.00 25.00 375.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 450. 30.00 13,500.00 24.00 10,800.00 214. FINE GRADING U 1. 25,000.00 25,000.00 70,000.00 70,000.00 304.301 CRUSHED GRAVEL CY 5,640. 15.00 84,600.00 21.00 118,440.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 175. 30.00 5,250.00 60.00 10,500.00 304.399 TEMPORARY CRUSHED GRAVEL CY 350. 30.00 10,500.00 21.00 7,350.00 304.7 STREAM LINING GRAVEL CY 145. 50.00 7,250.00 60.00 8,700.00 403.11052 HOT BITUMINOUS PAVEMENT, MM, SUPERPAVE (QC/QA) TON 4,625. 42.00 194,250.00 48.00 222,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 90. 75.00 6,750.00 120.00 10,800.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 250. 55.00 13,750.00 70.00 17,500.00 503.201 COFFERDAMS U 1. 1,000.00 1,000.00 15,000.00 15,000.00 14109 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 503.202 COFFERDAMS U 1. 1,000.00 1,000.00 15,000.00 15,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 925. 25.00 23,125.00 10.00 9,250.00 504.2 ROCK BRIDGE EXCAVATION CY 46. 25.00 1,150.00 100.00 4,600.00 508. STRUCTURAL FILL CY 135. 50.00 6,750.00 60.00 8,100.00 520.0001 PRECAST CONCRETE BOX CULVERT, CLASS AAA U 1. 150,000.00 150,000.00 190,000.00 190,000.00 520.00211 PRECAST CONCRETE BOX CULVERT (CONCRETE CLASS AAA) U 1. 85,000.00 85,000.00 90,000.00 90,000.00 520.00212 PRECAST CONCRET BOX CULVERT (CONCRETE CLASS AAA) U 1. 85,000.00 85,000.00 100,000.00 100,000.00 534.3 WATER REPELLENT (SILANE- SILOXANE) (F) SF 995. 1.00 995.00 2.00 1,990.00 538.1 BARRIER MEMBRANE (F) SY 118. 15.00 1,770.00 15.00 1,770.00 570.4 MORTAR RUBBLE MASONRY (F) CY 8. 500.00 4,000.00 400.00 3,200.00 585.1 STONE FILL, CLASS A CY 4,100. 22.00 90,200.00 36.00 147,600.00 585.2 STONE FILL, CLASS B CY 900. 22.00 19,800.00 40.00 36,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 150. 30.00 4,500.00 42.00 6,300.00 585.22 STONE FILL, CLASS B INTERMIXED WITH HUMUS CY 110. 40.00 4,400.00 50.00 5,500.00 585.4 STONE FILL, CLASS D CY 350. 15.00 5,250.00 50.00 17,500.00 593.4112 GEOTEXTILE, PERM.EROSION CONTROL, CL-1, NON-WOVEN FILTER CATEGORY 2 SY 8,595. 2.00 17,190.00 2.00 17,190.00 603.00215 15" R.C. PIPE, 2000D LF 300. 55.00 16,500.00 50.00 15,000.00 603.00218 18" R.C. PIPE, 2000D LF 100. 65.00 6,500.00 55.00 5,500.00 603.00224 24" R.C. PIPE, 2000D LF 500. 75.00 37,500.00 60.00 30,000.00 603.30115 15" R.C. END SECTIONS EA 2. 300.00 600.00 400.00 800.00 603.30118 18" R.C. END SECTIONS EA 1. 600.00 600.00 500.00 500.00 603.30124 24" R.C. END SECTIONS EA 7. 700.00 4,900.00 600.00 4,200.00 603.34118 18" STEEL END SECTIONS EA 4. 200.00 800.00 200.00 800.00 604.23 DROP INLETS TYPE C U 6. 2,000.00 12,000.00 1,800.00 10,800.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 3,500. 12.00 42,000.00 16.00 56,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 9. 150.00 1,350.00 300.00 2,700.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 175. 6.00 1,050.00 6.00 1,050.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 2,756. 20.00 55,120.00 16.00 44,096.00 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 2. 2,000.00 4,000.00 2,000.00 4,000.00 606.14531 BEAM GUARDRAIL (TERMINAL UNIT SPECIAL, 50 FT) U 8. 2,100.00 16,800.00 2,000.00 16,000.00 606.14533 BEAM GUARDRAIL FOR STORAGE (TERMINAL UNIT SPECIAL, 50 FT) U 2. 1,300.00 2,600.00 1,500.00 3,000.00 14109 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 600.00 1,800.00 600.00 1,800.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 400. 10.00 4,000.00 24.00 9,600.00 615.03 TRAFFIC SIGN TYPE C (F) SF 59. 50.00 2,950.00 60.00 3,540.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 9. 20.00 180.00 50.00 450.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 150.00 150.00 200.00 200.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 2. 25.00 50.00 35.00 70.00 615.063 REMOVING TRAFFIC SIGN TYPE CC U 1. 50.00 50.00 50.00 50.00 616.171 PORTABLE TEMP. SIGNALS TRAILER MOUNTED U 3. 27,000.00 81,000.00 35,000.00 105,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 240,000.00 240,000.00 240,000.00 240,000.00 618.7 FLAGGERS HR 2,400. 15.00 36,000.00 20.00 48,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 60,000.00 60,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 55. 5.00 275.00 4.00 220.00 621.31 SINGLE DELINEATOR WITH POST EA 60. 25.00 1,500.00 30.00 1,800.00 622.1 STEEL WITNESS MARKERS EA 35. 20.00 700.00 20.00 700.00 622.2 CONCRETE BOUNDS EA 11. 250.00 2,750.00 300.00 3,300.00 628.2 SAWED BITUMINOUS PAVEMENT LF 160. 5.00 800.00 4.00 640.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 20,000. .25 5,000.00 .20 4,000.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 9,200. 1.00 9,200.00 1.50 13,800.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 14. 50.00 700.00 50.00 700.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 10,575. .35 3,701.25 .50 5,287.50 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 950. 3.00 2,850.00 2.00 1,900.00 645.22 SLOPE STABILIZATION (STEEPER THAN 2:1) SY 1,130. 3.00 3,390.00 2.00 2,260.00 645.23 CHANNEL STABILIZATION (LOW VELOCITY) SY 1,050. 3.00 3,150.00 2.00 2,100.00 645.3 EROSION STONE TON 150. 30.00 4,500.00 25.00 3,750.00 645.531 SILT FENCE LF 2,175. 2.00 4,350.00 1.00 2,175.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 5,000.00 5,000.00 3,000.00 3,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 100. 100.00 10,000.00 80.00 8,000.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 12,730. .33 4,200.90 .40 5,092.00 647.1 HUMUS CY 1,200. 10.00 12,000.00 22.00 26,400.00 14109 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 653.85052 PRUNUS VIRGINIANA CHOKECHERRY 5 FT 1 YR POT CONT EA 35. 100.00 3,500.00 100.00 3,500.00 655.01052 ALNUS RUGOSA SPECKLED ALDER 3 FT 1 YR POT CONT EA 35. 50.00 1,750.00 50.00 1,750.00 655.02052 AMELANCHIER CANADENSIS DOWNY SHADBLOW 3 FT 1 YR POT CONT EA 30. 50.00 1,500.00 50.00 1,500.00 656.48052 SALIX DISCOLOR PUSSY WILLOW 3 FT 1 YR POT CONT EA 35. 40.00 1,400.00 40.00 1,400.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 150.00 450.00 100.00 300.00 670.101 TEMPORARY LIGHTING U 1. 10,000.00 10,000.00 30,000.00 30,000.00 677.22 PORTABLE DYNAMIC MESSAGE BOARD U 4. 22,000.00 88,000.00 36,000.00 144,000.00 678.16 IMPACT ATTENUATION DEVICE (SAND BARREL CRASH CUSHION) 60 MPH (F) U 4. 2,500.00 10,000.00 3,000.00 12,000.00 692. MOBILIZATION U 1. 162,000.00 162,000.00 160,000.00 160,000.00 698.13 FIELD OFFICE TYPE C MON 15. 1,000.00 15,000.00 1,100.00 16,500.00 698.2 PHYSICAL TESTING LABORATORY MON 15. 500.00 7,500.00 1,100.00 16,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1008.71 ALTERATIONS AND ADDITIONS AS NEEDED, REMOVAL OF MISC. DEBRIS IN STREAM $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $2,020,122.15 $2,527,705.50