THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: OSSIPEE-EFFINGHAM STP-X-000S(381), 13332 COUNTIES AND CODES: CARROLL 003 DATE BIDS OPEN: SEPTEMBER 23, 2004 SCOPE OF WORK: ROADWAY REHABILITATION AND SAFETY WORK LOCATION: ALONG NH ROUTE 25 BEGINNING AT THE INTERSECTION OF ROUTE 16B IN OSSIPEE, PROCEEDING EAST APPROXIMATELY 6 MILES TO A POINT 200 FEET WEST OF SCHOOL STREET IN EFFINGHAM. ALSO THE BRIDGE OVER THE PINE RIVER. COMPLETION DATE: SEPTEMBER 16, 2005 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,636,892.90 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 7,753. 1.60 12,404.80 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 1,100. 9.00 9,900.00 203.5552 GUARDRAIL ELT PLATFORM U 27. 900.00 24,300.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,600. 8.40 13,440.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 75. 37.00 2,775.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 30. 46.00 1,380.00 304.301 CRUSHED GRAVEL CY 5. 45.00 225.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,650. 16.00 42,400.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 100. 35.00 3,500.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 250. 55.00 13,750.00 403.11052 HOT BITUMINOUS PAVEMENT MACHINE METHOD (SUPERPAVE) (QC/ QA) TON 14,250. 40.00 570,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 350. 85.00 29,750.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 25. 175.00 4,375.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 500. 55.00 27,500.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 9,000. 41.00 369,000.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 9,800. 3.50 34,300.00 13332 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 500.021 PREPARATION FOR COVER PLATE INSPECTION U 20. 10.00 200.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 89,000.00 89,000.00 503.201 COFFERDAMS U 1. 34,000.00 34,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 75. 21.00 1,575.00 520.03 CONCRETE CLASS AA, CY 18. 520.00 9,360.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 27. 210.00 5,670.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 138. 730.00 100,740.00 534.1 WATER REPELLENT (LINSEED OIL) (F) SF 2,300. 1.10 2,530.00 534.3 WATER REPELLENT (SILANE- SILOXANE) (F) SF 1,365. 2.10 2,866.50 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 2. 21.00 42.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 445. 25.00 11,125.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 37. 6.30 233.10 544. REINFORCING STEEL (F) LB 856. 1.10 941.60 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 42,623. 1.10 46,885.30 544.21 REINFORCING STEEL, EPOXY COATED-MECHANICAL CONNECTORS (F) LB 4,620. 2.60 12,012.00 547. SHEAR CONNECTORS (F) EA 1,510. 1.60 2,416.00 556. PAINTING EXISTING STRUCTURAL STEEL U 1. 140,000.00 140,000.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 37. 92.00 3,404.00 563.23 BRIDGE RAIL T3 (F) LF 248. 120.00 29,760.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 138. 95.00 13,110.00 565.23 BRIDGE APPROACH RAIL T3 (F) LF 128. 140.00 17,920.00 570.401 MORTAR RUBBLE MASONRY CY 2. 440.00 880.00 585.2 STONE FILL, CLASS B CY 35. 42.00 1,470.00 585.3 STONE FILL, CLASS C CY 25. 43.00 1,075.00 603.00218 18" R.C. PIPE, 2000D LF 10. 47.00 470.00 603.00248 48" R.C. PIPE, 2000D LF 200. 140.00 28,000.00 603.30118 18" R.C. END SECTIONS EA 1. 900.00 900.00 603.44012 12" CORRUGATED POLYETHYLENE PIPE FOR SLOPE DRAIN LF 250. 28.00 7,000.00 604.0007 POLYETHYLENE LINER EA 15. 210.00 3,150.00 604.12 CATCH BASINS TYPE B U 2. 1,380.00 2,760.00 604.15 CATCH BASINS TYPE E U 2. 1,550.00 3,100.00 13332 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.242 DROP INLETS TYPE D-B U 12. 970.00 11,640.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 15. 230.00 3,450.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 5. 260.00 1,300.00 604.72 GRATES & FRAMES, TYPE B EA 10. 420.00 4,200.00 604.75 GRATES & FRAMES, TYPE E EA 15. 700.00 10,500.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 7,500. 15.50 116,250.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 75. 23.00 1,725.00 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 27. 1,800.00 48,600.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 500.00 1,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 525. 25.00 13,125.00 606.91 RESETTING OR SETTING GUARDRAIL LF 2,000. 10.00 20,000.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 400. 14.00 5,600.00 609.3 STRAIGHT GRANITE CURB (BRIDGE) LF 251. 31.00 7,781.00 609.5 RESET GRANITE CURB LF 1,000. 8.70 8,700.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 3,550. 4.50 15,975.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 5. 100.00 500.00 615.02 TRAFFIC SIGN TYPE B (F) SF 115.5 49.00 5,659.50 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 86.5 68.00 5,882.00 615.03 TRAFFIC SIGN TYPE C (F) SF 20.6 29.00 597.40 615.05 TRAFFIC SIGN TYPE BB (F) SF 12. 21.00 252.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 8.67 10.00 86.70 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 11,900.00 11,900.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 60,000.00 60,000.00 618.7 FLAGGERS HR 6,000. 16.00 96,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 10,000.00 20,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 2,800.00 5,600.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 100. 3.70 370.00 621.31 SINGLE DELINEATOR WITH POST EA 325. 24.00 7,800.00 622.1 STEEL WITNESS MARKERS EA 5. 26.00 130.00 628.2 SAWED BITUMINOUS PAVEMENT LF 550. 2.00 1,100.00 13332 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 270,000. .12 32,400.00 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 650. .21 136.50 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 250. 1.90 475.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 125. 1.60 200.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 250. 2.10 525.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 125. 7.30 912.50 641. LOAM CY 50. 47.00 2,350.00 645.3 EROSION STONE TON 250. 33.00 8,250.00 645.531 SILT FENCE LF 7,000. 2.00 14,000.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 1,500.00 1,500.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 100. 75.00 7,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 2.5 1,570.00 3,925.00 647.1 HUMUS CY 950. 14.00 13,300.00 670.101 TEMPORARY LIGHTING U 1. 2,600.00 2,600.00 692. MOBILIZATION U 1. 120,000.00 120,000.00 698.13 FIELD OFFICE TYPE C MON 9. 2,000.00 18,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 10,000.00 10,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 30,000.00 30,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 13,500.00 13,500.00 $2,636,892.90