THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: MANCHESTER A000(270), 10622-B COUNTIES AND CODES: HILLSBOROUGH 011 DATE BIDS OPEN: DECEMBER 16, 2004 SCOPE OF WORK: ROADWAY RECONSTRUCTION AND BUILDING DEMOLITION LOCATION: EXIT 5 INTERCHANGE WITH GRANITE STREET, I-293 AND ALLARD DRIVE COMPLETION DATE: MAY 26, 2006 A PARK CONSTRUCTION CORP PO BOX 600, FITZWILLIAM, NH 03447 $ 9,166,064.70 B R. ZOPPO CORP. 160 OLD MAPLE ST., STOUGHTON, MA 02072 $10,893,769.00 C R.S. AUDLEY INC. 609 ROUTE 3A, BOW, NH 03304 $11,193,131.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .37 10,000.00 3,700.00 40,000.00 14,800.00 13,500.00 4,995.00 201.21 REMOVING SMALL TREES EA 5. 350.00 1,750.00 600.00 3,000.00 480.00 2,400.00 201.22 REMOVING LARGE TREES EA 1. 1,000.00 1,000.00 1,500.00 1,500.00 980.00 980.00 202.201 DEMOLISHING BUILDINGS U 1. 28,000.00 28,000.00 40,000.00 40,000.00 15,000.00 15,000.00 202.202 DEMOLISHING BUILDINGS U 1. 28,000.00 28,000.00 40,000.00 40,000.00 10,000.00 10,000.00 202.203 DEMOLISHING BUILDINGS U 1. 38,000.00 38,000.00 50,000.00 50,000.00 25,000.00 25,000.00 202.204 DEMOLISHING BUILDINGS U 1. 35,000.00 35,000.00 45,000.00 45,000.00 15,000.00 15,000.00 202.205 DEMOLISHING BUILDINGS U 1. 62,000.00 62,000.00 70,000.00 70,000.00 35,000.00 35,000.00 202.206 DEMOLISHING BUILDINGS U 1. 63,000.00 63,000.00 70,000.00 70,000.00 25,000.00 25,000.00 202.207 DEMOLISHING BUILDINGS U 1. 41,000.00 41,000.00 60,000.00 60,000.00 30,000.00 30,000.00 202.208 DEMOLISHING BUILDINGS U 1. 41,000.00 41,000.00 55,000.00 55,000.00 30,000.00 30,000.00 202.209 DEMOLISHING BUILDINGS U 1. 30,000.00 30,000.00 40,000.00 40,000.00 10,000.00 10,000.00 202.31 FILL ABANDONED PIPE CY 700. 125.00 87,500.00 100.00 70,000.00 125.00 87,500.00 202.32 ABANDON AND FILL EXISTING MANHOLES CY 220. 100.00 22,000.00 75.00 16,500.00 120.00 26,400.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 450.00 450.00 500.00 500.00 300.00 300.00 202.6 CURB REMOVAL FOR STORAGE LF 146. 8.00 1,168.00 20.00 2,920.00 2.30 335.80 202.7 REMOVAL OF GUARDRAIL (F) LF 722. 4.00 2,888.00 3.00 2,166.00 1.80 1,299.60 202.9 REMOVAL OF FUEL TANKS U 2. 10,000.00 20,000.00 4,000.00 8,000.00 4,500.00 9,000.00 203.1 COMMON EXCAVATION CY 17,800. 8.00 142,400.00 12.00 213,600.00 12.90 229,620.00 203.2 ROCK EXCAVATION CY 3,820. 30.00 114,600.00 10.00 38,200.00 55.00 210,100.00 203.35 HANDLING EXCAVATED, CONTAMINATED SOILS CY 18,852. 8.00 150,816.00 6.00 113,112.00 22.00 414,744.00 203.37 SEGREGATING AND REHANDLING, NON-CONTAMINATED SOILS CY 2,000. 8.00 16,000.00 6.00 12,000.00 22.00 44,000.00 10622B PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.6 EMBANKMENT-IN-PLACE (F) CY 6,447. 4.00 25,788.00 10.00 64,470.00 15.00 96,705.00 203.62 EMBANKMENT-IN-PLACE, REPLACEMENT MATERIAL CY 15,000. 12.00 180,000.00 15.00 225,000.00 17.00 255,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 820. 10.00 8,200.00 25.00 20,500.00 15.00 12,300.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 325. 15.00 4,875.00 50.00 16,250.00 36.00 11,700.00 206.2 ROCK STRUCTURE EXCAVATION CY 2,005. 100.00 200,500.00 80.00 160,400.00 78.00 156,390.00 206.21 ROCK STRUCTURE EXCAVATION (PIPE JACKING) CY 70. 2,150.00 150,500.00 500.00 35,000.00 2,000.00 140,000.00 209.1 GRANULAR BACKFILL CY 1,060. 18.00 19,080.00 30.00 31,800.00 40.00 42,400.00 209.2 GRANULAR BACKFILL (BRIDGE) CY 11,595. 20.00 231,900.00 18.00 208,710.00 40.00 463,800.00 209.3 GRANULAR BACKFILL (SAND) CY 50. 20.00 1,000.00 20.00 1,000.00 28.00 1,400.00 209.4 GRANULAR BACKFILL (GRAV) CY 100. 20.00 2,000.00 35.00 3,500.00 35.00 3,500.00 209.5 GRANULAR BACKFILL (#46 STONE) CY 100. 30.00 3,000.00 35.00 3,500.00 45.00 4,500.00 211.11 VIBRATION MONITORING SERVICES HR 100. 60.00 6,000.00 75.00 7,500.00 45.00 4,500.00 214. FINE GRADING U 1. 30,000.00 30,000.00 50,000.00 50,000.00 100,000.00 100,000.00 304.1 SAND (F) CY 7. 15.00 105.00 30.00 210.00 175.00 1,225.00 304.2 GRAVEL (F) CY 4,591. 17.00 78,047.00 30.00 137,730.00 30.00 137,730.00 304.3 CRUSHED GRAVEL (F) CY 2,482. 20.00 49,640.00 40.00 99,280.00 30.00 74,460.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 190. 25.00 4,750.00 50.00 9,500.00 33.00 6,270.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 125. 90.00 11,250.00 80.00 10,000.00 42.00 5,250.00 403.1105 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (SUPERPAVE) TON 3,020. 65.00 196,300.00 50.00 151,000.00 42.00 126,840.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 155. 90.00 13,950.00 85.00 13,175.00 75.00 11,625.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 420. 90.00 37,800.00 90.00 37,800.00 50.00 21,000.00 417. COLD PLANING BITUMINOUS SURFACES (F) SY 374. 12.00 4,488.00 10.00 3,740.00 35.00 13,090.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) (F) SY 2,220. 6.00 13,320.00 5.00 11,100.00 3.55 7,881.00 503.201 COFFERDAMS U 1. 25,000.00 25,000.00 40,000.00 40,000.00 53,000.00 53,000.00 503.202 COFFERDAMS U 1. 25,000.00 25,000.00 40,000.00 40,000.00 18,000.00 18,000.00 504.101 COMMON BRIDGE EXCAVATION CY 8,742. 12.00 104,904.00 12.00 104,904.00 12.00 104,904.00 504.2 ROCK BRIDGE EXCAVATION CY 632. 100.00 63,200.00 80.00 50,560.00 120.00 75,840.00 509.1 MOBIL. AND DEMOBIL. OF DRILLED SHAFT DRILLING EQUIPMENT U 1. 11,000.00 11,000.00 10,000.00 10,000.00 35,000.00 35,000.00 509.2 DRILLED SHAFTS LF 1,700. 135.00 229,500.00 150.00 255,000.00 170.00 289,000.00 509.3 OBSTRUCTION REMOVAL LF 170. 310.00 52,700.00 75.00 12,750.00 300.00 51,000.00 520.01 CONCRETE CLASS AA CY 1,007. 375.00 377,625.00 220.00 221,540.00 690.00 694,830.00 520.1 CONCRETE CLASS A CY 10. 1,100.00 11,000.00 700.00 7,000.00 1,400.00 14,000.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 9. 1,300.00 11,700.00 800.00 7,200.00 1,650.00 14,850.00 10622B PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 520.211 CONCRETE CLASS B, FOOTINGS (ON ROCK) CY 3. 350.00 1,050.00 500.00 1,500.00 850.00 2,550.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 6. 300.00 1,800.00 500.00 3,000.00 600.00 3,600.00 534.3 WATER REPELLENT (SILANE- SILOXANE) (F) SF 37,516. 1.20 45,019.20 1.00 37,516.00 .50 18,758.00 544. REINFORCING STEEL (F) LB 1,386. 1.50 2,079.00 2.00 2,772.00 1.10 1,524.60 544.1 REINFORCING STEEL (ROADWAY) LB 350. 1.50 525.00 2.00 700.00 1.25 437.50 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 81,935. 1.30 106,515.50 2.00 163,870.00 1.15 94,225.25 585.2 STONE FILL, CLASS B CY 155. 35.00 5,425.00 50.00 7,750.00 31.00 4,805.00 585.4 STONE FILL, CLASS D CY 65. 35.00 2,275.00 50.00 3,250.00 65.00 4,225.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 19,726. 35.00 690,410.00 37.00 729,862.00 32.50 641,095.00 593.4112 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN FILTER CATEGORY 2 SY 200. 5.00 1,000.00 2.00 400.00 3.30 660.00 594.2 SOUND ABATEMENT WALL SF 16,219. 27.00 437,913.00 22.00 356,818.00 22.50 364,927.50 603.00215 15" R.C. PIPE, 2000D LF 2,685. 60.00 161,100.00 70.00 187,950.00 48.00 128,880.00 603.00218 18" R.C. PIPE, 2000D LF 745. 65.00 48,425.00 80.00 59,600.00 55.00 40,975.00 603.00224 24" R.C. PIPE, 2000D LF 760. 70.00 53,200.00 85.00 64,600.00 60.00 45,600.00 603.00230 30" R.C. PIPE, 2000D LF 265. 100.00 26,500.00 130.00 34,450.00 70.00 18,550.00 603.00236 36" R.C. PIPE, 2000D LF 245. 120.00 29,400.00 130.00 31,850.00 80.00 19,600.00 603.00242 42" R.C. PIPE, 2000D LF 360. 160.00 57,600.00 150.00 54,000.00 95.00 34,200.00 603.00248 48" R.C. PIPE, 2000D LF 55. 182.00 10,010.00 180.00 9,900.00 115.00 6,325.00 603.20054 54" STEEL SLEEVE LF 15. 550.00 8,250.00 600.00 9,000.00 800.00 12,000.00 603.71548 48" REINFORCED CONCRETE PIPE 4000D JACKED UNDER ROADWAY LF 175. 1,400.00 245,000.00 1,000.00 175,000.00 1,530.00 267,750.00 603.71954 54" STEEL SLEEVE JACKED UNDER ROADWAY LF 285. 1,800.00 513,000.00 3,000.00 855,000.00 3,000.00 855,000.00 604.0007 POLYETHYLENE LINER EA 63. 150.00 9,450.00 120.00 7,560.00 220.00 13,860.00 604.12 CATCH BASINS TYPE B U 45. 1,500.00 67,500.00 1,000.00 45,000.00 1,600.00 72,000.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 11. 2,000.00 22,000.00 1,500.00 16,500.00 2,500.00 27,500.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 10. 2,800.00 28,000.00 1,800.00 18,000.00 3,200.00 32,000.00 604.127 CATCH BASINS TYPE B 7-FOOT DIAMETER U 7. 3,500.00 24,500.00 2,500.00 17,500.00 5,500.00 38,500.00 604.128 CATCH BASINS TYPE B, 8-FOOT DIAMETER U 2. 4,000.00 8,000.00 4,000.00 8,000.00 6,200.00 12,400.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1. 3,000.00 3,000.00 4,000.00 4,000.00 3,500.00 3,500.00 604.85 WATER REPELLENT FOR EXISTING CB'S AND DI'S EA 4. 150.00 600.00 150.00 600.00 80.00 320.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 750. 18.00 13,500.00 20.00 15,000.00 15.75 11,812.50 606.1452 BEAM GUARDRAIL (TERMINAL UNIT TYPE ELT) U 2. 2,000.00 4,000.00 2,500.00 5,000.00 1,750.00 3,500.00 10622B PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 600.00 1,200.00 700.00 1,400.00 500.00 1,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,520. 35.00 53,200.00 30.00 45,600.00 23.00 34,960.00 607.665 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 6 FEET HIGH LF 1,318. 18.00 23,724.00 25.00 32,950.00 18.00 23,724.00 607.669 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6 FT. HIGH EA 2. 200.00 400.00 200.00 400.00 150.00 300.00 607.9 RESETTING RAILING AND FENCING LF 25. 25.00 625.00 25.00 625.00 25.00 625.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 875. 12.00 10,500.00 12.00 10,500.00 11.00 9,625.00 608.24 4" CONCRETE SIDEWALK (F) SY 1,759. 45.00 79,155.00 30.00 52,770.00 38.00 66,842.00 608.52 DETECTABLE WARNING PAVERS (SIDEWALK RAMPS) SY 5. 150.00 750.00 200.00 1,000.00 650.00 3,250.00 609.01 STRAIGHT GRANITE CURB LF 4,700. 15.00 70,500.00 20.00 94,000.00 16.00 75,200.00 609.02 CURVED GRANITE CURB LF 460. 28.00 12,880.00 25.00 11,500.00 24.00 11,040.00 609.0924 STRAIGHT GRANITE CURB 24" HIGH LF 940. 140.00 131,600.00 130.00 122,200.00 120.00 112,800.00 609.5 RESET GRANITE CURB LF 2,312. 10.00 23,120.00 7.00 16,184.00 6.00 13,872.00 612.2336 36" DIA RCP SEWER PIPE, CLASS IV - 16'-20' DEEP LF 470. 221.00 103,870.00 700.00 329,000.00 490.00 230,300.00 612.23361 36" DIA RCP SEWER PIPE, CLASS V - 16'-20' DEEP LF 463. 233.00 107,879.00 750.00 347,250.00 490.00 226,870.00 612.23362 36" DIA RCP SEWER PIPE, CLASS V - 20'-24' DEEP LF 1,381. 265.00 365,965.00 800.00 1,104,800.00 490.00 676,690.00 612.23363 36" DIA RCP SEWER PIPE, CLASS V - 24'-28' DEEP LF 550. 282.00 155,100.00 850.00 467,500.00 490.00 269,500.00 612.31120 PVC WYES - 8"X6" EA 6. 100.00 600.00 50.00 300.00 100.00 600.00 612.31136 SEWER MANHOLES, 6-FOOT DIA, INCLUDE F&C VF 85. 370.00 31,450.00 400.00 34,000.00 650.00 55,250.00 612.31152 SEWER MANHOLES, 5-FOOT DIA, INCLUDE F&C VF 275. 270.00 74,250.00 300.00 82,500.00 600.00 165,000.00 612.3120 SEWER MANHOLES, 4-FOOT DIA INCLUDE F&C VF 55. 230.00 12,650.00 200.00 11,000.00 300.00 16,500.00 612.3506 6" DIA PVC SEWER SERVICE LF 100. 35.00 3,500.00 100.00 10,000.00 50.00 5,000.00 612.3508 8" DIA PVC SEWER PIPE SDR 35 LF 796. 70.00 55,720.00 80.00 63,680.00 75.00 59,700.00 612.3510 10" DIA SEWER PVC PIPE SDR 35 LF 160. 71.00 11,360.00 100.00 16,000.00 175.00 28,000.00 612.3512 12" DIA PVC SEWER PIPE SDR35 LF 26. 90.00 2,340.00 150.00 3,900.00 200.00 5,200.00 612.3515 15" DIA PVC SEWER PIPE SDR 35 LF 117. 95.00 11,115.00 150.00 17,550.00 250.00 29,250.00 612.3524 24" DIA. PVC SEWER PIPE SDR 35 LF 39. 135.00 5,265.00 200.00 7,800.00 400.00 15,600.00 612.43236 36" DIA SEWER PIPE, CLASS 52 LF 279. 300.00 83,700.00 800.00 223,200.00 450.00 125,550.00 613.491 STORMWATER TREATMENT SYSTEM (LEVEL 9) U 1. 115,000.00 115,000.00 50,000.00 50,000.00 165,000.00 165,000.00 10622B PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 613.492 STORMWATER TREATMENT SYSTEM (LEVEL 9) U 1. 75,000.00 75,000.00 50,000.00 50,000.00 65,000.00 65,000.00 614.331 3" STEEL CONDUIT LF 36. 32.00 1,152.00 35.00 1,260.00 20.00 720.00 614.522 MOLDED PULL BOX 13"X24" EA 3. 450.00 1,350.00 500.00 1,500.00 400.00 1,200.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 422. 13.00 5,486.00 20.00 8,440.00 10.00 4,220.00 615.03 TRAFFIC SIGN TYPE C (F) SF 69.3 60.00 4,158.00 100.00 6,930.00 55.00 3,811.50 618.6 UNIFORMED OFFICERS $ 1. 64,500.00 64,500.00 64,500.00 64,500.00 64,500.00 64,500.00 618.7 FLAGGERS HR 3,220. 17.00 54,740.00 30.00 96,600.00 21.00 67,620.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 100,000.00 100,000.00 175,000.00 175,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 13. 500.00 6,500.00 300.00 3,900.00 450.00 5,850.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 7,500.00 15,000.00 2,000.00 4,000.00 15,000.00 30,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 5. 6.00 30.00 6.00 30.00 4.00 20.00 622.1 STEEL WITNESS MARKERS EA 4. 25.00 100.00 25.00 100.00 25.00 100.00 622.2 CONCRETE BOUNDS EA 3. 200.00 600.00 250.00 750.00 180.00 540.00 622.4 STONE BOUNDS EA 50. 220.00 11,000.00 250.00 12,500.00 200.00 10,000.00 625.2 CONCRETE LIGHT POLE BASES, TYPE B EA 3. 550.00 1,650.00 600.00 1,800.00 500.00 1,500.00 625.882 RELOCATED LIGHT POLE (HIGHWAY) U 3. 800.00 2,400.00 1,000.00 3,000.00 750.00 2,250.00 628.1 SAWED CONCRETE PAVEMENT LF 15. 10.00 150.00 10.00 150.00 75.00 1,125.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,640. 2.00 3,280.00 2.00 3,280.00 2.50 4,100.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 10,450. .50 5,225.00 .55 5,747.50 .20 2,090.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 15. 2.00 30.00 3.00 45.00 1.00 15.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 15. 16.00 240.00 50.00 750.00 15.00 225.00 632.5206 PREFORMED RETROREFLECTIVE TAPE TYPE V 6" SOLID LINE LF 1,900. 4.00 7,600.00 5.00 9,500.00 5.00 9,500.00 632.5212 PREFORMED RETROREFLECTIVE TAPE TYPE V 12" SOLID LINE LF 625. 6.00 3,750.00 7.00 4,375.00 7.00 4,375.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 1,400. 1.00 1,400.00 2.00 2,800.00 .35 490.00 641. LOAM CY 1,560. 25.00 39,000.00 30.00 46,800.00 23.00 35,880.00 643.22 FERTILIZER FOR REFERTIL- IZATION TON 1.3 600.00 780.00 500.00 650.00 500.00 650.00 645.12 TEMPORARY MULCH A .6 800.00 480.00 500.00 300.00 600.00 360.00 645.21 SLOPE STABILIZATION (2:1 OR FLATTER) SY 775. 2.00 1,550.00 2.00 1,550.00 1.50 1,162.50 645.3 EROSION STONE TON 200. 25.00 5,000.00 25.00 5,000.00 33.00 6,600.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 65. 6.00 390.00 10.00 650.00 10.00 650.00 645.531 SILT FENCE LF 3,000. 3.00 9,000.00 5.00 15,000.00 5.00 15,000.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 4,000.00 4,000.00 5,000.00 5,000.00 3,000.00 3,000.00 10622B PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 170. 90.00 15,300.00 80.00 13,600.00 46.00 7,820.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 13,350. .40 5,340.00 .50 6,675.00 .35 4,672.50 662.281 DECOMMISSION MONITORING WELLS LF 227.5 30.00 6,825.00 15.00 3,412.50 27.00 6,142.50 670.115 FIRE ACCESS SLEEVE EA 2. 1,500.00 3,000.00 500.00 1,000.00 2,850.00 5,700.00 670.95 TEMPORARY SAFETY FENCE LF 2,000. 10.00 20,000.00 5.00 10,000.00 5.00 10,000.00 678.141 IMPACT ATTENUATION DEVICE 40 MPH(SAND BARREL CRASH CUSHION) LEFT-IN-PLACE U 1. 11,500.00 11,500.00 5,000.00 5,000.00 3,300.00 3,300.00 678.16 IMPACT ATTENUATION DEVICE (SAND BARREL CRASH CUSHION) 60 MPH (F) U 1. 16,500.00 16,500.00 8,000.00 8,000.00 4,200.00 4,200.00 692. MOBILIZATION U 1. 850,000.00 850,000.00 740,000.00 740,000.00 650,000.00 650,000.00 698.12 FIELD OFFICE TYPE B MON 19. 500.00 9,500.00 3,000.00 57,000.00 1,500.00 28,500.00 698.2 PHYSICAL TESTING LABORATORY MON 19. 300.00 5,700.00 1,800.00 34,200.00 750.00 14,250.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.2 TREATMENT OR DISPOSAL OF CONTAMINATED SOIL/GROUNDWATER $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1009.3 MONITORING, TREATMENT AND DISPOSAL ASBESTOS FILL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.41 BUILDING ASBESTOS ABATEMENT $ 1. 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 1009.42 BUILDING ASBESTOS ABATEMENT $ 1. 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 1009.43 BUILDING ASBESTOS ABATEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.44 BUILDING ASBESTOS ABATEMENT $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1009.45 BUILDING ASBESTOS ABATEMENT $ 1. 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 1009.46 BUILDING ASBESTOS ABATEMENT $ 1. 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 1009.47 BUILDING ASBESTOS ABATEMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1009.48 BUILDING ASBESTOS ABATEMENT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1009.49 BUILDING ASBESTOS ABATEMENT $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1009.5 DISPOSAL FUEL SLUDGE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1009.7 PROJECT OPERATIONS PLAN $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 10622B PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 $9,166,064.70 $10,893,769.00 $11,193,131.75