THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: LANCASTER X-A000(168), 13992 COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JULY 15, 2004 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: US ROUTE 2, US ROUTE 3 AND REED ROAD COMPLETION DATE: AUGUST 5, 2005 A WINTERSET INC. PO BOX 968, LYNDONVILLE, VT 05851 $ 2,096,769.65 B MORRILL CONSTRUCTION INC. PO BOX 400, HORSE MEADOW RD., N. HAVERHILL, NH 03774 $ 2,382,253.65 C SCOTT'S CONSTRUCTION INC. D/B/A S.C.I. GROUP PO BOX 909, NEWPORT, VT 05855 $ 2,486,214.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.21 REMOVING SMALL TREES EA 17. 275.00 4,675.00 650.00 11,050.00 600.00 10,200.00 201.22 REMOVING LARGE TREES EA 14. 470.00 6,580.00 1,850.00 25,900.00 700.00 9,800.00 202.32 FILL ABANDONED STRUCTURE CY 80. 105.00 8,400.00 75.00 6,000.00 120.00 9,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 54. 25.00 1,350.00 9.00 486.00 18.00 972.00 202.43 REMOVAL OF EXIST. ASBEST. CEMENT PIPE, 0-24" DIAM. LF 150. 105.00 15,750.00 9.50 1,425.00 70.00 10,500.00 203.1 COMMON EXCAVATION CY 22,200. 7.50 166,500.00 6.25 138,750.00 9.00 199,800.00 203.2 ROCK EXCAVATION CY 475. 7.50 3,562.50 50.00 23,750.00 60.00 28,500.00 203.601 EMBANKMENT IN PLACE CY 2,750. 4.00 11,000.00 4.50 12,375.00 7.00 19,250.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 60.00 3,000.00 18.00 900.00 40.00 2,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 21. 56.00 1,176.00 35.00 735.00 120.00 2,520.00 209.1 GRANULAR BACKFILL CY 25. 30.00 750.00 35.00 875.00 35.00 875.00 214. FINE GRADING U 1. 36,000.00 36,000.00 32,750.00 32,750.00 50,000.00 50,000.00 304.1 SAND (F) CY 9,350. 15.00 140,250.00 17.00 158,950.00 18.00 168,300.00 304.2 GRAVEL (F) CY 9,500. 16.00 152,000.00 18.00 171,000.00 20.00 190,000.00 304.3 CRUSHED GRAVEL (F) CY 9,400. 18.00 169,200.00 19.50 183,300.00 22.00 206,800.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 360. 50.00 18,000.00 32.00 11,520.00 30.00 10,800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 115. 61.00 7,015.00 59.15 6,802.25 60.00 6,900.00 403.11052 HOT BITUMINOUS PAVEMENT MACHINE METHOD (SUPERPAVE) ( QC/ QA) TON 4,650. 52.50 244,125.00 52.50 244,125.00 54.00 251,100.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 625. 89.00 55,625.00 90.00 56,250.00 130.00 81,250.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 500. 58.00 29,000.00 58.85 29,425.00 85.00 42,500.00 417.01 COLD PLANING BITUMINOUS SURFACES SY 850. 6.50 5,525.00 7.00 5,950.00 7.00 5,950.00 13992 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 570.4 MORTAR RUBBLE MASONRY (F) CY 17. 400.00 6,800.00 625.00 10,625.00 400.00 6,800.00 572.21 REMOVE AND RESET STONE WALL, MULTIPLE STONES WIDE LF 900. 35.00 31,500.00 30.00 27,000.00 30.00 27,000.00 585.3 STONE FILL, CLASS C CY 16. 60.00 960.00 35.00 560.00 40.00 640.00 593.323 GEOTEXTILE STABILIZATION, CLASS 2, SLIT FILAMENT, WOVEN SY 25,500. 1.10 28,050.00 2.40 61,200.00 1.00 25,500.00 593.4311 LOW STRENGTH GEOTEXTILE NON-WOVEN SY 75. 5.00 375.00 2.50 187.50 1.00 75.00 603.00215 15" R.C. PIPE, 2000D LF 548. 27.00 14,796.00 62.00 33,976.00 50.00 27,400.00 603.00218 18" R.C. PIPE, 2000D LF 336. 41.00 13,776.00 68.00 22,848.00 65.00 21,840.00 603.00224 24" R.C. PIPE, 2000D LF 64. 42.00 2,688.00 75.00 4,800.00 70.00 4,480.00 603.00336 36" R.C. PIPE, 3000D LF 136. 64.00 8,704.00 105.00 14,280.00 100.00 13,600.00 603.34115 15" STEEL END SECTIONS EA 2. 115.00 230.00 250.00 500.00 100.00 200.00 603.34124 24" STEEL END SECTIONS EA 7. 220.00 1,540.00 305.00 2,135.00 200.00 1,400.00 603.34130 30" STEEL END SECTIONS EA 1. 250.00 250.00 425.00 425.00 250.00 250.00 604.0007 POLYETHYLENE LINER EA 42. 150.00 6,300.00 320.00 13,440.00 150.00 6,300.00 604.12 CATCH BASINS TYPE B U 8. 1,200.00 9,600.00 1,650.00 13,200.00 1,800.00 14,400.00 604.15 CATCH BASINS TYPE E U 12. 1,300.00 15,600.00 1,675.00 20,100.00 1,800.00 21,600.00 604.16 CATCH BASINS TYPE F U 20. 1,200.00 24,000.00 1,685.00 33,700.00 2,000.00 40,000.00 604.191 SPECIAL CATCH BASINS U 1. 8,000.00 8,000.00 6,000.00 6,000.00 7,000.00 7,000.00 604.26 DROP INLETS TYPE F U 3. 1,200.00 3,600.00 1,615.00 4,845.00 1,800.00 5,400.00 604.324 DRAINAGE MANHOLES U 1. 1,280.00 1,280.00 1,650.00 1,650.00 1,800.00 1,800.00 604.4 RECONSTRUCTING CATCH BASINS & DROP INLETS LF 5. 410.00 2,050.00 225.00 1,125.00 250.00 1,250.00 604.45 ADJUSTING CATCH BASIN DROP INLET GRATE AND FRAMES EA 4. 455.00 1,820.00 485.00 1,940.00 400.00 1,600.00 604.55 ADJUSTING MANHOLE COVERS AND FRAMES EA 30. 345.00 10,350.00 485.00 14,550.00 400.00 12,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 1,200. 19.50 23,400.00 32.00 38,400.00 20.00 24,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 160. 24.00 3,840.00 38.85 6,216.00 26.00 4,160.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 2,920. 25.50 74,460.00 42.00 122,640.00 28.00 81,760.00 605.82451 36" AGGRE UND. TYPE 2, WITH P.C. POLY PIPE LF 720. 17.75 12,780.00 44.00 31,680.00 32.00 23,040.00 605.82453 36" AGGRE. UND., TYPE 2 WITH P.C. POLY PIPE LF 590. 23.60 13,924.00 46.50 27,435.00 36.00 21,240.00 605.82454 36" AGGRE. UND., TYPE 2 WITH P.C. POLY PIPE LF 100. 31.00 3,100.00 58.75 5,875.00 50.00 5,000.00 605.82455 36" AGGRE. UND., TYPE 2 WITH P.C. POLY PIPE LF 1,580. 20.50 32,390.00 54.00 85,320.00 36.00 56,880.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 1,860. 16.50 30,690.00 12.50 23,250.00 30.00 55,800.00 608.24 4" CONCRETE SIDEWALK (F) SY 45. 30.00 1,350.00 40.00 1,800.00 10.00 450.00 608.53 DETECTABLE WARNING PANELS, YELLOW (SIDEWALK RAMPS) SY 9.5 225.00 2,137.50 385.00 3,657.50 250.00 2,375.00 13992 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.01 STRAIGHT GRANITE CURB LF 4,150. 16.00 66,400.00 16.00 66,400.00 17.00 70,550.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 485. 13.25 6,426.25 14.00 6,790.00 15.00 7,275.00 611.50107 3/4" COPPER WATER PIPE LF 300. 10.00 3,000.00 36.00 10,800.00 45.00 13,500.00 611.811 ADJUSTING/RELOCATING HYDRANTS EA 2. 1,000.00 2,000.00 875.00 1,750.00 1,000.00 2,000.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 46. 110.00 5,060.00 245.00 11,270.00 60.00 2,760.00 612.73504 4" PVC SEWER PIPE SDR-35 LF 500. 10.00 5,000.00 40.00 20,000.00 40.00 20,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 50. 55.00 2,750.00 52.00 2,600.00 60.00 3,000.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 4. 25.00 100.00 24.00 96.00 40.00 160.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 618.7 FLAGGERS HR 4,000. 20.00 80,000.00 18.50 74,000.00 20.00 80,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 45,000.00 45,000.00 28,000.00 28,000.00 30,000.00 30,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 27. 700.00 18,900.00 600.00 16,200.00 700.00 18,900.00 621.31 SINGLE DELINEATOR WITH POST EA 40. 24.50 980.00 30.00 1,200.00 30.00 1,200.00 622.1 STEEL WITNESS MARKERS EA 14. 24.50 343.00 22.00 308.00 20.00 280.00 628.2 SAWED BITUMINOUS PAVEMENT LF 530. 5.00 2,650.00 2.50 1,325.00 4.00 2,120.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 54,000. .17 9,180.00 .18 9,720.00 .20 10,800.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 57. 2.20 125.40 2.20 125.40 3.00 171.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 62. 5.50 341.00 5.50 341.00 8.00 496.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 115. 11.00 1,265.00 12.00 1,380.00 11.00 1,265.00 641. LOAM CY 765. 29.00 22,185.00 40.00 30,600.00 30.00 22,950.00 645.12 TEMPORARY MULCH A 2. 1,500.00 3,000.00 1,200.00 2,400.00 1,000.00 2,000.00 645.3 EROSION STONE TON 200. 50.00 10,000.00 18.00 3,600.00 40.00 8,000.00 645.531 SILT FENCE LF 3,500. 3.00 10,500.00 3.00 10,500.00 1.00 3,500.00 645.7 EROSION AND SEDIMENT CONTROL STORMWATER MANAGEMENT PLAN U 1. 2,800.00 2,800.00 5,500.00 5,500.00 3,000.00 3,000.00 645.71 MONITORING EROSION AND SEDIMENT CONTROL HR 80. 48.00 3,840.00 85.00 6,800.00 100.00 8,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3.3 1,800.00 5,940.00 1,650.00 5,445.00 1,400.00 4,620.00 647.1 HUMUS CY 800. 17.00 13,600.00 14.00 11,200.00 16.00 12,800.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 27. 120.00 3,240.00 145.00 3,915.00 100.00 2,700.00 692. MOBILIZATION U 1. 127,000.00 127,000.00 115,000.00 115,000.00 149,000.00 149,000.00 698.13 FIELD OFFICE TYPE C MON 14. 1,315.00 18,410.00 1,200.00 16,800.00 1,300.00 18,200.00 698.2 PHYSICAL TESTING LABORATORY MON 12. 600.00 7,200.00 900.00 10,800.00 1,200.00 14,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 13992 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1007.1 ALTERATIONS AND ADDITIONS AS NEEDED-MISCELLANEOUS LANDSCAPE TREATMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.311 ALTERATIONS AND ADDITIONS AS NEEDED-TIE UNDERDRAIN INTO DRAINAGE STRUCTURES $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1008.312 ALTERATIONS AS NEEDED - TIE BASEMENT DRAINS INTO CLOSED SYSTEM $ 1. 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 1010.11 FUEL ADJUSTMENT, DIESEL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.12 FUEL ADJUSTMENT, GASOLINE $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 10,710.00 10,710.00 10,710.00 10,710.00 10,710.00 10,710.00 $2,096,769.65 $2,382,253.65 $2,486,214.00